Building material carrying device

By designing a handling device for aerated bricks, using components such as U-frame, pallets and support rods, the problems of wear and labor intensity of the bundling belts during the handling of aerated bricks are solved, and the stable stacking and binding of aerated bricks are achieved. The belt is conveniently extracted, improving handling efficiency.

CN222138086UActive Publication Date: 2024-12-10FUXIN MONGOLIAN AUTONOMOUS COUNTY JINSHUI WATER CONSERVANCY ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421561105.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-12-10
Estimated Expiration
2034-07-03

AI Technical Summary

Technical Problem

When manually transporting air-filled bricks, the bundles are easily pressed and worn, which increases labor intensity and makes it difficult to easily extract the bundles pressed by the aerated bricks.

Method used

A building material handling device is designed, including U-shaped frames, pallets, support rods, limit parts and pin rods. By plugging the limit parts with the U-shaped frame, the pallets and support rods are combined to achieve matching. The stable stacking of air tiles and the convenient extraction of the bundled straps prevent wear and tear.

Benefits of technology

It effectively prevents the wear of the bundled belt, reduces the labor intensity of the transport, simplifies the separation process of the bundled belt, and improves the handling efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222138086U_ABST
    Figure CN222138086U_ABST
Patent Text Reader

Abstract

The utility model provides a building material carrying device which comprises a binding belt, the binding belt is connected with a U-shaped frame in an inserted mode through a limiting piece, aerated bricks are arranged in the U-shaped frame, strip-shaped grooves are formed in the upper portions of the two parallel side faces of the U-shaped frame, a supporting plate used for being inserted between the two aerated bricks is inserted in the strip-shaped grooves, and the supporting plate is connected with the U-shaped frame in a sleeved mode. A grabbing handle is fixedly connected to the end, located on the outer side of the U-shaped frame, of the supporting plate, a plurality of supporting rods are evenly installed on the outer surface of the U-shaped frame, the lower ends of the supporting rods extend to the lower side of the U-shaped frame, and the height of a structure formed by the supporting rods and the U-shaped frame is larger than that of the aerated bricks. The air-entrapping brick binding device has the beneficial effect that the binding belt pressed by the air-entrapping brick can be conveniently drawn out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a construction material transporting device, belonging to the field of construction. Background Art

[0002] Aerated bricks are commonly used building materials. When manually transporting aerated bricks, multiple aerated bricks are stacked on top of each other, and then the stacked aerated bricks are tied together with binding belts, so that the transporters can use the binding belts to limit the relative positions of the multiple aerated bricks, making it convenient to carry the aerated bricks upstairs by shouldering. After the binding belts are tied to the aerated bricks, the binding belts are in contact with the surface of the aerated bricks. After the aerated bricks are transported upstairs and placed on the ground, a part of the binding belts will be held by the aerated bricks. When the binding belts are pulled out, there is a situation where the binding belt cups are worn. The method of moving the aerated bricks that are held by the binding belts will increase the labor intensity of the transporters. Therefore, it is necessary to design a building material transport device that is convenient for pulling out the binding belts held by the aerated bricks. Utility Model Content

[0003] In view of the shortcomings of the prior art, the utility model aims to provide a construction material handling device to solve the problems raised in the above-mentioned background technology. The utility model facilitates the extraction of the binding belt held by the aerated bricks.

[0004] In order to achieve the above-mentioned purpose, the utility model is implemented through the following technical scheme: a construction material handling device, including a binding belt, which is plugged into a U-shaped frame through a limit piece, and aerated bricks are arranged in the U-shaped frame. The upper positions of two parallel side surfaces of the U-shaped frame are provided with strip grooves, and a support plate for being inserted between two aerated bricks is inserted in the strip groove. A gripping handle is connected and fixed to one end of the support plate located on the outer side of the U-shaped frame, and a plurality of support rods are evenly installed on the outer surface of the U-shaped frame. The lower ends of the support rods extend to the lower side of the U-shaped frame, and the height of the structure formed by the support rods and the U-shaped frame is greater than the height of the aerated bricks.

[0005] Furthermore, the limiting member includes a baffle, a horizontally arranged baffle is provided at the middle position of a side surface of the U-shaped frame connected to the strip groove, side panels are provided on both sides of the baffle, one end of the side panel is connected and fixed to the U-shaped frame, slots are provided on the opposite surfaces of the two side panels away from the U-shaped frame, the two ends of the baffle are respectively inserted in the two slots, a pin hole is provided on the upper surface of the side panel, the pin hole is communicated with the slot, two circular holes are symmetrically provided on the upper surface of the baffle, the two circular holes are respectively aligned with the two pin holes, a pin rod is inserted in the pin hole, the lower end of the pin rod is inserted in the circular hole, and the binding belt passes through the space formed by the baffle, the U-shaped frame and the two side panels.

[0006] Furthermore, a blind hole aligned with the pin hole is formed at the bottom of the slot, and the lower end of the pin rod extends into the blind hole.

[0007] Furthermore, a rubber head is connected and fixed to the lower end of the pin rod, and the rubber head fits against the inner wall of the blind hole.

[0008] Furthermore, a small hole is formed on the outer surface of the upper end of the pin rod, a round rod connected and fixed to the pin rod is inserted into the small hole, and both ends of the round rod extend to the outside of the small hole.

[0009] Furthermore, the position where the side plate of the U-shaped frame is installed is recessed to form a positioning groove, and one end of the side plate is connected and fixed in the positioning groove.

[0010] Furthermore, a plurality of strip-shaped openings are provided on the outer surface of the U-shaped frame, and the strip-shaped openings are arranged vertically.

[0011] Beneficial effects of the utility model:

[0012] 1. Make the U-shaped frame stuck on the lowest layer of aerated bricks, and make the lowest layer of aerated bricks pressed on the binding belt, then insert the pallets in the two strip grooves, place the penultimate layer of aerated bricks on the two pallets, and then continue to stack the aerated bricks, and then tie the ends of the two binding belts to each other to limit the relative positions of multiple aerated bricks. After the multiple stacked aerated bricks are placed on the ground, the multiple support rods on the U-shaped frame first contact the ground, and the lowest layer of aerated bricks also contact the ground. Under the support of the pallet, a gap is generated between the penultimate layer of aerated bricks and the lowest layer of aerated bricks, so that the lowest layer of aerated bricks can be lifted up when the binding belt is pulled out, which prevents the aeration belt from being worn, and there is no need to move the aerated bricks, which is conducive to reducing labor intensity. After the binding belt is pulled out, the pallet can be pulled out to separate the U-shaped frame.

[0013] 2. When the binding belt is used to bind multiple stacked aerated bricks, the binding belt is made to pass through the space formed by the baffle, the U-shaped frame and the two side panels. Then, after the two ends of the binding belt are tied to each other, the position of the U-shaped frame is restricted, and the pin rod is pulled out from the channel formed by the round hole and the pin hole, so as to facilitate the separation of the baffle and the side panel, and facilitate the separation of the binding belt and the U-shaped frame. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:

[0015] Figure 1 This is a structural schematic diagram of a building material handling device of the utility model;

[0016] Figure 2 for Figure 1 Enlarged view of point A in the middle;

[0017] Figure 3 for Figure 1 Enlarged view of point B in the middle;

[0018] Figure 4 It is a three-dimensional diagram of a binding belt in a building material handling device of the utility model;

[0019] Figure 5 This is a schematic diagram of the assembly of a support rod and a U-shaped frame in a building material handling device of the utility model;

[0020] Figure 6 It is a schematic diagram of the assembly of a gripping rod and a supporting plate in a building material handling device of the utility model;

[0021] Figure 7 It is a three-dimensional diagram of a side plate of a building material handling device of the utility model;

[0022] Figure 8 It is a three-dimensional diagram of a baffle in a building material handling device of the utility model;

[0023] Fig. 9 This is a schematic diagram of the assembly of a rubber head and a pin rod in a building material handling device of the utility model;

[0024] In the figure: 1-binding belt, 2-support rod, 3-U-shaped frame, 4-aerated brick, 5-support plate, 6-grasping rod, 7-baffle, 8-side plate, 9-pin rod, 10-round rod, 11-strip groove, 12-positioning groove, 13-strip mouth, 14-blind hole, 15-slot, 16-pin hole, 17-round hole, 18-rubber head. DETAILED DESCRIPTION

[0025] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0026] See also Figure 1 , Figure 3 , Figure 4 and Figure 5 The utility model provides a technical solution: a construction material handling device, including a binding belt 1, a horizontally arranged baffle 7 is provided in the middle of a side surface of a U-shaped frame 3 connected to a strip groove 11, side panels 8 are provided on both sides of the baffle 7, one end of the side panel 8 is connected and fixed to the U-shaped frame 3, wherein the position where the U-shaped frame 3 is installed with the side panel 8 is recessed to form a positioning groove 12, so that one end of the side panel 8 is connected and fixed in the positioning groove 12, thereby improving the stability of the connection between the side panel 8 and the U-shaped frame 3.

[0027] See also Figure 1 , Figure 3 , Figure 4 , Figure 5 , Figure 7 , Figure 8 and Fig. 9, the two side panels 8 have slots 15 on the opposite sides away from the U-shaped frame 3, and the two ends of the baffle 7 are respectively inserted into the two slots 15, and the upper surface of the side panel 8 has a pin hole 16, which is communicated with the slot 15. The upper surface of the baffle 7 has two symmetrical circular holes 17, which are aligned with the two pin holes 16 respectively, and the pin rods 9 are inserted in the pin holes 16, and the lower ends of the pin rods 9 are inserted in the circular holes 17. When the binding belt 1 is used to bind multiple stacked aerated bricks 4, the binding belt 1 passes through the space formed by the baffle 7, the U-shaped frame 3 and the two side panels 8, and then after the two ends of the binding belt 1 are tied to each other, the position of the U-shaped frame 3 is restricted, so that the pin rod 9 is pulled out from the channel formed by the circular holes 17 and the pin holes 16, thereby facilitating the separation of the baffle 7 and the side panel 8, and facilitating the separation of the binding belt 1 and the U-shaped frame 3.

[0028] See also Figure 1 , Figure 3 , Figure 7 , Figure 8 and Fig. 9 A blind hole 14 aligned with the pin hole 16 is provided at the bottom of the slot 15, and a rubber head 18 is connected and fixed to the lower end of the pin rod 9. After the lower end of the pin rod 9 extends into the blind hole 14, the rubber head 18 fits with the inner wall of the blind hole 14, thereby increasing the friction coefficient between the pin rod 9 and the inner wall of the blind hole 14 to prevent the pin rod 9 from falling off at will. A small hole is provided on the outer surface of the upper end of the pin rod 9, and a round rod 10 connected and fixed to the pin rod 9 is inserted in the small hole. Both ends of the round rod 10 extend to the outside of the small hole, and the round rod 10 provides a carrier for grasping the pin rod 9.

[0029] See also Figure 1 , Figure 2 , Figure 4 , Figure 5 and Figure 6, aerated bricks 4 are arranged in the U-shaped frame 3, and strip grooves 11 are opened at the upper positions of the two parallel sides of the U-shaped frame 3, and a pallet 5 for being inserted between two aerated bricks 4 is inserted in the strip groove 11, and a gripping handle is connected and fixed to one end of the pallet 5 on the outer side of the U-shaped frame 3, and a plurality of support rods 2 are evenly installed on the outer surface of the U-shaped frame 3, and the lower ends of the support rods 2 extend to the lower side of the U-shaped frame 3. The height of the structure formed by the support rods 2 and the U-shaped frame 3 is greater than the height of the aerated bricks 4, so that the U-shaped frame 3 is stuck on the lowest layer of aerated bricks 4, and the lowest layer of aerated bricks 4 is pressed on the binding belt 1, and then the pallets 5 are inserted in the two strip grooves 11, so that the penultimate layer of aerated bricks 4 is placed on the two pallets 5, and then the aerated bricks 4 continue to be stacked, and then the two The ends of the binding belt 1 are tied to each other to limit the relative positions of the multiple aerated bricks 4, so that after the multiple stacked aerated bricks 4 are placed on the ground, the multiple support rods 2 on the U-shaped frame 3 first contact the ground, and the bottom layer of aerated bricks 4 also contact the ground. Under the support of the pallet 5, a gap is created between the penultimate layer of aerated bricks 4 and the bottom layer of aerated bricks 4, so that when the binding belt 1 is pulled out, the bottom layer of aerated bricks 4 can be lifted upward to prevent the binding belt 1 from being worn, and there is no need to move the aerated bricks 4, which is beneficial to reducing labor intensity. After the binding belt 1 is pulled out, the pallet 5 can be pulled out to separate the U-shaped frame 3, and the weight of the U-shaped frame 3 can be reduced by opening a plurality of vertically arranged strip openings 13 on the outer surface of the U-shaped frame 3.

[0030] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction material handling device, comprising a binding belt (1), characterized in that: The binding belt (1) is plugged into the U-shaped frame (3) through a stopper. Aerated bricks (4) are arranged in the U-shaped frame (3). The upper positions of two parallel side surfaces of the U-shaped frame (3) are provided with strip grooves (11). A support plate (5) for being inserted between two aerated bricks (4) is inserted in the strip groove (11). A gripping handle is connected and fixed to one end of the support plate (5) located outside the U-shaped frame (3). A plurality of support rods (2) are evenly installed on the outer surface of the U-shaped frame (3). The lower ends of the support rods (2) extend to the lower side of the U-shaped frame (3). The height of the structure formed by the support rods (2) and the U-shaped frame (3) is greater than the height of the aerated bricks (4).

2. A construction material handling device according to claim 1, characterized in that: The limiting member comprises a baffle (7), a horizontally arranged baffle (7) being provided at the middle of a side surface of the U-shaped frame (3) connected to the strip groove (11), side panels (8) being provided on both sides of the baffle (7), one end of the side panel (8) being connected and fixed to the U-shaped frame (3), and slots (15) being provided on opposite sides of the two side panels (8) away from the U-shaped frame (3), the two ends of the baffle (7) being respectively inserted into the two slots (15), and the side panels (8) being provided with a plurality of slots (15). 8) A pin hole (16) is provided on the upper surface, the pin hole (16) is communicated with the slot (15), two circular holes (17) are symmetrically provided on the upper surface of the baffle (7), the two circular holes (17) are respectively aligned with the two pin holes (16), a pin rod (9) is inserted into the pin hole (16), and the lower end of the pin rod (9) is inserted into the circular hole (17), and the binding belt (1) passes through the space formed by the baffle (7), the U-shaped frame (3) and the two side panels (8).

3. A construction material handling device according to claim 2, characterized in that: A blind hole (14) aligned with the pin hole (16) is provided at the bottom of the slot (15), and the lower end of the pin rod (9) extends into the blind hole (14).

4. A construction material handling device according to claim 3, characterized in that: A rubber head (18) is connected and fixed to the lower end of the pin rod (9), and the rubber head (18) fits against the inner wall of the blind hole (14).

5. A construction material handling device according to claim 2, characterized in that: A small hole is formed on the outer surface of the upper end of the pin rod (9), and a round rod (10) connected and fixed to the pin rod (9) is inserted into the small hole, with both ends of the round rod (10) extending to the outside of the small hole.

6. A construction material handling device according to claim 2, characterized in that: The position where the U-shaped frame (3) is mounted on the side plate (8) is recessed to form a positioning groove (12), and one end of the side plate (8) is connected and fixed in the positioning groove (12).

7. A construction material handling device according to claim 1, characterized in that: The outer surface of the U-shaped frame (3) is provided with a plurality of strip-shaped openings (13), and the strip-shaped openings (13) are arranged vertically.

Citation Information

Cited By

  • Reciprocating type building material transporter for bridge construction

    CN120589639A