Dredging device for river channel construction

The dredging device with a dredging boat, shovel, and treatment box effectively addresses pipe clogging and silt handling by breaking down solidified silt and separating it from water, ensuring efficient dredging and sludge treatment.

CN222140166UActive Publication Date: 2024-12-10HANGZHOU FUXIU CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420368082.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-12-10
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

Existing dredging equipment struggles with solidified silt in river channels, which clogs pipes and is difficult to handle, and requires complex handling of mixed silt and water.

Method used

A dredging device comprising a dredging boat with a dredging shovel, water sprayer, crushing rollers, mud suction pump, treatment box, and sludge box, equipped with stirring motors, heating elements, and filter screens to break down and separate silt and water effectively.

Benefits of technology

The device efficiently breaks down solidified silt, separates it from water, and facilitates stable dredging operations by ensuring pipe unclogging and efficient sludge treatment, resulting in dry soil, mud, and sand collection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222140166U_ABST
    Figure CN222140166U_ABST
Patent Text Reader

Abstract

The utility model discloses a dredging device for riverway construction, which comprises a dredging ship, a sludge box is arranged on the dredging ship, a connecting frame is arranged at the lower end of the dredging ship, a dredging shovel is arranged on the connecting frame, a water sprayer is arranged on the connecting frame, a water suction pump is arranged on the dredging ship, a water suction pipe is arranged at one end of the water suction pump, and a water outlet pipe is arranged at the other end of the water suction pump. One end of the desilting shovel is provided with a water spraying device, the other end of the desilting shovel is provided with a water supply pipe, the water supply pipe is communicated with the water spraying device, the desilting shovel is provided with a silt collecting groove, the interior of the silt collecting groove is rotatably connected with a crushing roller, the crushing roller is provided with crushing teeth, the desilting shovel is internally provided with a driving motor, the output end of the driving motor is connected with the crushing roller, and the desilting shovel is provided with a silt pumping pipe. The dredging ship is provided with a sludge pump, the sludge pump communicates with the sludge collecting groove through a sludge pumping pipe, and the equipment facilitates sludge cleaning, prevents pipeline blockage, treats the collected sludge in advance, and facilitates sludge cleaning and collection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy construction, and more specifically, to a silt-clearing device for river channel construction. Background Art

[0002] Rivers can provide space for water flow and storage, and can be used for flood discharge as well as irrigating nearby land. They play an important role in providing drainage and drought resistance. However, after long-term use, mud and other materials will accumulate inside the river to form silt. Excessive silt will raise the riverbed and affect the use of the river. Therefore, the river needs to be dredged regularly.

[0003] Common dredging equipment is relatively simple, just a simple suction device that can suck away the silt in the river channel. However, in the river channel, some silt will solidify due to a long time and internal material reasons. The solidified silt material becomes hard, and it is difficult to clean the solidified silt by suction alone; and there will be some large lumps in the silt. After entering the pipe of the suction equipment, because the silt is relatively viscous, it is easy to accumulate and clog in the pipe, causing the pipe to be blocked and affecting the dredging work; and the sucked silt will be mixed with a large amount of river water. Sometimes when facing a larger river channel, the dredging equipment needs to be set on a floating device, and moved by the floating device away from the shore. The collected silt containing a large amount of river water is not convenient to handle. Utility Model Content

[0004] 1. Technical issues to be solved

[0005] In view of the problems existing in the prior art, the utility model provides a dredging device for river channel construction to solve the technical problems mentioned in the background technology that the dredging equipment has a simple structure and is inconvenient to use.

[0006] (II) Technical solution

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a dredging device for river channel construction, comprising a dredging boat, a sludge box is arranged on the dredging boat, a connecting frame is arranged at the lower end of the dredging boat, a dredging shovel is arranged on the connecting frame, a water sprayer is arranged on the connecting frame, a water pump is arranged on the dredging boat, a water pump is arranged at one end of the water pump, a water supply pipe is arranged at the other end, and the water supply pipe is connected to the water sprayer;

[0008] The dredging shovel is provided with a silt collecting trough, a crushing roller is rotatably connected in the silt collecting trough, the crushing roller is provided with crushing teeth, a driving motor is provided in the dredging shovel, the output end of the driving motor is connected to the crushing roller, a mud suction pipe is provided on the dredging shovel, and a mud suction pump is provided on the dredging boat, and the mud suction pump is connected to the silt collecting trough through the mud suction pipe.

[0009] The utility model is further configured that a treatment box is provided at one end of the sludge box, the treatment box is connected to the sludge pump, a drain is provided at one end of the treatment box, and a discharge pipe is provided at the other end, the discharge pipe is connected to the sludge box, so as to facilitate the treatment of river water in the sludge.

[0010] The utility model is further configured that a stirring motor is provided on the processing box, a stirring shaft is provided at the output end of the stirring motor, the stirring shaft is arranged in the processing box, and a stirring blade is provided on the stirring shaft to increase the processing speed.

[0011] The utility model is further configured that a heat pipe groove is opened in the processing box, an electric heating pipe is arranged in the heat pipe groove, and a temperature conduction plate is arranged at the groove of the heat pipe groove to improve the processing speed.

[0012] The utility model is further configured that a filter screen is provided in the drain outlet and a control valve is provided on the discharge pipe to facilitate control of the discharge of sludge.

[0013] The utility model is further configured such that the sprinkler includes a mounting frame, an integration box and a high-pressure water gun, wherein the integration box and the high-pressure water gun are both arranged on the mounting frame, and a plurality of high-pressure water guns are provided, all of which are connected to the integration box to improve the impact effect.

[0014] The utility model is further configured such that the mud suction pipe includes a main pipe and a diversion pipe, one end of the main pipe is connected to the mud suction pump, and the other end is connected to the diversion pipe, the dredging shovel is provided with a silt outlet, and there are multiple silt outlets, which cooperate with the diversion pipe to make the conduction of silt more stable.

[0015] The utility model is further configured that a layered filter screen is provided in the sludge box to facilitate sludge recovery.

[0016] (III) Beneficial effects

[0017] Compared with the prior art, the utility model provides a dredging device for river construction, which has the following beneficial effects:

[0018] 1. The equipment is driven by a dredging boat to move on the river channel, and the silt at the bottom of the river channel is shoveled up by a dredging shovel to separate the silt that has clumped together, and then it is sucked up, and the water flow is provided by a pump, a pumping pipe and a water supply pipe, and then sprayed out by a sprinkler to impact the silt, loosen the silt, and then destroyed by a silt shovel to improve the effect of cleaning the silt.

[0019] 2. The sludge is sucked by the sludge pump and the sludge pipe, and the sludge collection is guided by the sludge collecting tank and the dredging shovel. When collecting the sludge, the driving motor provides power, and the sludge entering the sludge collecting tank is broken with the cooperation of the crushing roller and the crushing teeth, so that all the sludge is turned into small sludge particles, avoiding sludge blocking the equipment pipeline and ensuring the stable progress of the dredging work.

[0020] 3. Before collecting the silt through the silt box, the silt is treated in the treatment box, and the river water in the silt is discharged through the drain port and the filter net. The silt is stirred through the cooperation of the stirring motor, the stirring shaft and the stirring blades to make the silt uniform, complete self-cleaning, and discharge the residual water flow. The electric heating tube will provide heat to evaporate the water in the treated silt, so that the silt is treated into dry soil, mud, stone and sand, which is convenient for the collection of silt. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the front structure of a dredging device for river construction in the utility model;

[0022] Figure 2 This is a schematic diagram of the coordinated structure of the desilting shovel and the water sprinkler in the utility model after being disassembled;

[0023] Figure 3 This is a cross-sectional view of the cooperation structure between the internal silt collecting tank and the crushing roller of the silt removal shovel of the utility model;

[0024] Figure 4 This is a cross-sectional view of the internal structure of the processing box in the utility model;

[0025] Figure 5 It is a cross-sectional view of the internal structure of the sludge box in the utility model.

[0026] In the figure: 1. Dredging boat; 2. Silt box; 3. Connecting frame; 4. Dredging shovel; 5. Sprinkler; 6. Water pump; 7. Water pipe; 8. Water supply pipe; 9. Silt collecting trough; 10. Crushing roller; 11. Crushing teeth; 12. Driving motor; 13. Mud suction pipe; 14. Mud pump; 15. Processing box; 16. Drainage outlet; 17. Discharge pipe; 18. Stirring motor; 19. Stirring shaft; 20. Stirring blade; 21. Heat pipe trough; 22. Electric heating pipe; 23. Temperature conduction plate; 24. Filter; 25. Control valve; 26. Mounting frame; 27. Integration box; 28. High-pressure water gun; 29. ​​Main pipe; 30. Diversion pipe; 31. Silt outlet; 32. Layered filter. DETAILED DESCRIPTION

[0027] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0028] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.

[0029] In the present invention, unless otherwise specified, directions such as "up" and "down" are usually used in reference to the directions shown in the drawings, or in reference to the vertical, perpendicular or gravity direction; similarly, for ease of understanding and description, "left" and "right" are usually used in reference to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directions are not used to limit the present invention.

[0030] See also Figure 1-3 A dredging device for river channel construction comprises a dredging boat 1, a silt box 2 is provided on the dredging boat 1, a connecting frame 3 is provided at the lower end of the dredging boat 1, a dredging shovel 4 is provided on the connecting frame 3, a water sprayer 5 is provided on the connecting frame 3, a water pump 6 is provided on the dredging boat 1, a water pump 7 is provided at one end of the water pump 6, and a water supply pipe 8 is provided at the other end, and the water supply pipe 8 is connected with the water sprayer 5;

[0031] A silt collecting trough 9 is provided on the dredging shovel 4, a crushing roller 10 is rotatably connected in the silt collecting trough 9, and crushing teeth 11 are provided on the crushing roller 10. A driving motor 12 is provided in the dredging shovel 4, and the output end of the driving motor 12 is connected to the crushing roller 10. A mud suction pipe 13 is provided on the dredging shovel 4, and a mud suction pump 14 is provided on the dredging boat 1, and the mud suction pump 14 is connected to the silt collecting trough 9 through the mud suction pipe 13.

[0032] In this embodiment, the dredging boat 1 supports and drives the movement of various devices. Under the connection of the connecting frame 3, the dredging shovel 4 moves with the dredging boat 1 to clean the silt in the river channel. The silt is scooped up by the shape of the dredging shovel 4 and moved along the surface of the dredging shovel 4. During the cleaning, the water pump 6 is started and the water pipe 7 is placed in the water. Under the action of the water pump 6, the water pipe 7 draws river water and passes it into the sprinkler 5 through the water supply pipe 8 to spray the silt at the front end of the dredging shovel 4 to soften the hardened silt, thereby facilitating the work of the dredging shovel 4.

[0033] More specifically, when the dredging shovel 4 scoops up the silt, the sludge pump 14 is started to provide negative pressure, and the silt moving along the surface of the dredging shovel 4 is collected through the silt collecting trough 9. When the silt enters the silt collecting trough 9, it passes between the crushing rollers 10, and the drive motor 12 is started. Under the action of the drive motor 12, the crushing rollers 10 will drive the crushing teeth 11 to rotate, and the incoming silt is crushed, so that large pieces of silt are dispersed into small pieces of silt and enter the silt collecting trough 9. Under the guidance of the sludge suction pipe 13, the silt moves to the silt box 2 above.

[0034] See also Figure 1 and Figure 4As an implementation method for sludge treatment: a treatment box 15 is provided at one end of the sludge box 2, and the treatment box 15 is connected to the mud pump 14. A drain port 16 is provided at one end of the treatment box 15, and a discharge pipe 17 is provided at the other end, and the discharge pipe 17 is connected to the sludge box 2.

[0035] Specifically, when the sludge moves along the sludge suction pipe 13 and the sludge suction pump 14, it first enters the treatment box 15 before entering the sludge box 2, where it is treated, and a large amount of water sucked in is discharged through the water suction port, and the treated sludge is discharged into the sludge box 2 through the discharge pipe 17.

[0036] Please refer to Figure 1 and Figure 4 As a further implementation of the sludge treatment mechanism: a stirring motor 18 is provided on the treatment box 15, a stirring shaft 19 is provided at the output end of the stirring motor 18, the stirring shaft 19 is arranged in the treatment box 15, and a stirring blade 20 is provided on the stirring shaft 19.

[0037] Specifically, the stirring motor 18 is started, and the stirring motor 18 drives the stirring shaft 19 to rotate, and the stirring shaft 19 drives the stirring blades 20 to rotate, so as to stir the sludge in the processing box 15 and accelerate the processing of the sludge.

[0038] Please refer to Figure 4 As a further implementation of the sludge treatment mechanism: a heat pipe groove 21 is opened in the treatment box 15, an electric heating pipe 22 is arranged in the heat pipe groove 21, and a temperature conduction plate 23 is arranged at the groove of the heat pipe groove 21.

[0039] Specifically, when the treatment is being carried out, the electric heating tube 22 is started, and the electric heating tube 22 in the heat pipe groove 21 works, and the temperature is transferred to the sludge through the transfer of the heat conduction plate 23, so as to speed up the treatment of the internal moisture.

[0040] Please refer to Figure 1 and Figure 4 As a further implementation of the processing box 15 mechanism: a filter screen 24 is provided in the drain outlet 16, and a control valve 25 is provided on the discharge pipe 17.

[0041] Specifically, the sludge in the treatment box 15 is blocked by the filter screen 24 , and only water is allowed to flow out from the drain port 16 .

[0042] Please refer to Figure 2 As a further implementation of the sprinkler 5 mechanism: the sprinkler 5 includes a mounting frame 26, an integration box 27 and a high-pressure water gun 28. The integration box 27 and the high-pressure water gun 28 are both arranged on the mounting frame 26. There are multiple high-pressure water guns 28, all of which are connected to the integration box 27.

[0043] Specifically, under the support of the mounting frame 26, the integration box 27 and the high-pressure water gun 28 are ensured to work stably, water is supplied to the integration box 27 through the water supply pipe 8, and water is supplied to each high-pressure water gun 28 through the integration box 27, so that water flows out from the high-pressure water gun 28 to impact the sludge.

[0044] Please refer to Figure 2 As a further implementation of the mud suction pipe 13 mechanism: the mud suction pipe 13 includes a main pipe 29 and a diversion pipe 30, one end of the main pipe 29 is connected to the mud suction pump 14, and the other end is connected to the diversion pipe 30, and the dredging shovel 4 is provided with a silt outlet 31, and there are multiple silt outlets 31, which cooperate with the diversion pipe 30.

[0045] Specifically, the sludge in the sludge collecting tank 9 is absorbed from multiple positions by connecting the shunt pipe 30 with the silt outlet 31 to ensure the sludge discharge speed. The sludge flows along the shunt pipe 30 and flows to the sludge box 2 along the main pipe 29 after merging.

[0046] Please refer to Figure 5 As a further implementation of the sludge box 2 mechanism: a layered filter screen 32 is provided in the sludge box 2.

[0047] Specifically, the layered filter 32 provides a separation effect to filter the treated sludge, leaving larger particles such as gravel in the upper part of the sludge box 2, and the remaining sludge is collected in the lower part of the sludge box 2.

[0048] In summary, when the overall device is in use or running:

[0049] When the equipment is used for work, the dredging boat 1 supports and drives each device to move. Under the connection of the connecting frame 3, the dredging shovel 4 moves with the dredging boat 1, and the silt in the river channel is cleaned by the dredging shovel 4. During the cleaning, if the silt in the river channel is hard, the pumping pipe 7 is placed in the water, and the pumping pump 6 is started. Under the action of the pumping pump 6, river water is pumped through the pumping pipe 7, and the river water flows through the pumping pump 6 and supplies water to the sprinkler 5 through the water supply pipe 8. Under the support of the mounting frame 26, the operation of the integration box 27 and the high-pressure water gun 28 is guaranteed to be stable. The water supply pipe 8 supplies water to the integration box 27, and water is provided to each high-pressure water gun 28 through the integration box 27, so that water flows out from the high-pressure water gun 28, impacting the silt at the front end of the dredging shovel 4, and softening the hardened silt, which is convenient for the operation of the dredging shovel 4. The silt shovel 4 has an inclined shape. The sludge is lifted up and moved along the surface of the dredging shovel 4. At this time, the sludge pump 14 and the driving motor 12 are started. Negative pressure is provided by the sludge pump 14. Under the guidance of the sludge suction pipe 13, suction is generated at the sludge collecting tank 9 to absorb the shoveled sludge. The crushing rollers 10 are provided with two or more groups and cooperate with each other. When the sludge enters the sludge collecting tank 9, it will pass between the crushing rollers 10. Under the action of the driving motor 12, the crushing rollers 10 rotate and drive the crushing teeth 11 to rotate, so as to crush the incoming sludge, so that large pieces of sludge are dispersed into small pieces of sludge and then enter the sludge collecting tank 9. Under the guidance of the sludge suction pipe 13, multiple shunt pipes 30 are connected with different silt outlets 31 to absorb the sludge in the sludge collecting tank 9 from multiple positions to ensure the discharge speed of the sludge. The sludge flows along the shunt pipes 30, and after merging, it flows along the main pipe 29 to move to the sludge box 2 above.

[0050] After the sludge is sucked out of the river channel, the sludge flows from the main pipe 29 through the sludge pump 14 into the treatment box 15, where it is treated. The stirring motor 18 is started, and the stirring shaft 19 is driven to rotate by the stirring motor 18. The stirring shaft 19 drives the stirring blade 20 to rotate, so as to stir the sludge in the treatment box 15 and speed up the treatment of the sludge. The electric heating pipe 22 is started, and the electric heating pipe 22 in the heat pipe groove 21 works. The temperature is transferred to the sludge through the transfer of the temperature conduction plate 23, so as to further speed up the treatment of the internal moisture. A large amount of water entering is discharged, and the sludge in the treatment box 15 is blocked by the filter screen 24, allowing only water to flow out from the drain port 16, and the control valve 25 on the discharge pipe 17 is closed, so that the sludge remains in the treatment box 15. After the treatment is completed, the control valve 25 is opened, and the treated sludge is discharged through the discharge pipe 17 and enters the sludge box 2. After the sludge enters the sludge box 2, the layered filter screen 32 provides a separation effect, filters the treated sludge, and leaves larger particles such as stones in the upper part of the sludge box 2, and the rest of the sludge is collected in the lower part of the sludge box 2.

[0051] In all the schemes mentioned above, the connection between two parts can be selected according to actual conditions by welding, bolt and nut matching connection, bolt or screw connection or other well-known connection methods, which are not described here one by one. In the above, all fixed connections are preferably welded. Although the embodiments of the utility model have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the utility model. The scope of the utility model is defined by the attached claims and their equivalents.

Claims

1. A dredging device for river channel construction, comprising a dredging vessel (1), wherein the dredging vessel (1) is provided with a sludge box (2), wherein: The lower end of the dredging boat (1) is provided with a connecting frame (3), a dredging shovel (4) is provided on the connecting frame (3), a water sprayer (5) is provided on the connecting frame (3), a water pump (6) is provided on the dredging boat (1), one end of the water pump (6) is provided with a water pumping pipe (7), and the other end is provided with a water supply pipe (8), and the water supply pipe (8) is connected to the water sprayer (5); The dredging shovel (4) is provided with a silt collecting trough (9), a crushing roller (10) is rotatably connected in the silt collecting trough (9), and the crushing roller (10) is provided with crushing teeth (11). The dredging shovel (4) is provided with a driving motor (12), and the output end of the driving motor (12) is connected to the crushing roller (10). The dredging shovel (4) is provided with a mud pump (13), and the dredging ship (1) is provided with a mud pump (14), and the mud pump (14) is connected to the silt collecting trough (9) through the mud pump (13).

2. A dredging device for river construction according to claim 1, characterized in that: A treatment box (15) is provided at one end of the sludge box (2), a drainage port (16) is provided at one end of the treatment box (15), and a discharge pipe (17) is provided at the other end, and the discharge pipe (17) is communicated with the sludge box (2).

3. A dredging device for river construction according to claim 2, characterized in that: The processing box (15) is provided with a stirring motor (18), the output end of the stirring motor (18) is provided with a stirring shaft (19), the stirring shaft (19) is arranged in the processing box (15), and the stirring shaft (19) is provided with a stirring blade (20).

4. A dredging device for river construction according to claim 3, characterized in that: A heat pipe groove (21) is provided in the processing box (15), an electric heating pipe (22) is provided in the heat pipe groove (21), and a temperature conducting plate (23) is provided at the groove opening of the heat pipe groove (21).

5. The dredging device for river construction according to claim 2 is characterized in that: A filter screen (24) is provided in the drainage port (16), and a control valve (25) is provided on the discharge pipe (17).

6. The dredging device for river construction according to claim 1 is characterized in that: The water sprayer (5) comprises a mounting frame (26), an integration box (27) and a high-pressure water gun (28); the integration box (27) and the high-pressure water gun (28) are both arranged on the mounting frame (26); a plurality of the high-pressure water guns (28) are arranged and are all connected to the integration box (27).

7. The dredging device for river construction according to claim 1 is characterized in that: The mud extraction pipe (13) comprises a main pipe (29) and a shunt pipe (30); one end of the main pipe (29) is connected to the mud extraction pump (14), and the other end is connected to the shunt pipe (30); a plurality of mud outlets (31) are provided on the dredging shovel (4), and the mud outlets (31) cooperate with the shunt pipe (30).

8. The dredging device for river construction according to claim 1 is characterized in that: A layered filter screen (32) is provided in the sludge box (2).