Slag slipping prevention device
By setting up temporary interception networks and grooves that reduce the area step by step on high-fill slopes, combined with protective fences and support poles, the problem of slag slips on high-fill slopes is solved, and slag slips are slowed down and intercept networks are ensured. Stable effect.
Patent Information
- Application Number
- CN202420827403.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-04-19
AI Technical Summary
High-fill slopes are prone to large-scale slag slips under rainfall and gravity, resulting in soil erosion and ecological environment damage.
An anti-slag-sliding device is designed, including grooves and multiple temporary interceptor networks arranged in sequence along the slope from top to bottom. Each temporary interceptor network is provided with buffer holes along the length and width directions, and the area of the buffer holes is reduced in sequence. , combined with protective fences and support rods, a slag body with different particle sizes is formed step by step.
Effectively alleviate the slag slip phenomenon, avoid damage caused by excessive slag body in a single interceptor network, and rainfall is guided by trenches, ensuring the stability of the interceptor network, and is economical, convenient to use and highly practical.
Smart Images

Figure CN222160980U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of slope construction, in particular to a slag sliding prevention device. Background Art
[0002] During the construction of high-speed railways, highways, wind power or water conservancy projects, a large number of high fill slopes will inevitably be generated. Under the action of rainfall erosion and gravity, the earthwork of these high fill slopes will roll or slide down along the slope surface, destroying the stability and integrity of the slope surface, and then causing large-scale slope slag sliding. The slag sliding phenomenon will not only harm the vegetation, land and water system downstream, but may also lead to the phenomenon of "green mountains covered with white", causing serious soil erosion and affecting the beauty and ecological environment of the slope surface. Utility Model Content
[0003] The utility model aims to provide a slag-sliding prevention device to alleviate the technical problem of large-area slag-sliding phenomenon that is easy to occur on high fill slopes in the prior art.
[0004] In order to solve the above technical problems, the technical solution provided by the utility model is:
[0005] The slag-sliding prevention device provided by the utility model comprises a groove arranged on the slope surface and a plurality of temporary interception nets;
[0006] The grooves and the plurality of temporary interception nets are arranged in sequence from top to bottom along the slope;
[0007] Each of the temporary interception nets is provided with a plurality of buffer holes, and the plurality of buffer holes are arranged at intervals along the length direction and the width direction of the temporary interception net;
[0008] The areas of the buffer holes of the plurality of temporary interception nets decrease successively along the slope from top to bottom.
[0009] Furthermore, the areas and shapes of the plurality of buffer holes on a single temporary interception net are the same.
[0010] Furthermore, the shapes of the buffer holes of the multiple temporary interception nets are the same.
[0011] Furthermore, the buffer hole is configured to be square.
[0012] Furthermore, the plurality of temporary interception nets include a first temporary interception net, a second temporary interception net and a third temporary interception net, and the first temporary interception net, the second temporary interception net and the third temporary interception net are arranged in sequence from top to bottom along the slope;
[0013] The buffer hole of the first temporary interception net is set to 30cm×30cm;
[0014] The buffer holes of the second temporary interception net are set to 15cm×15cm;
[0015] The buffer holes of the third temporary interception net are set to 5cm×5cm.
[0016] Furthermore, the distance between the second temporary interception net and the first temporary interception net is equal to the distance between the second temporary interception net and the third temporary interception net.
[0017] Furthermore, the temporary interception net includes a protective fence;
[0018] The protective fence has the buffer hole.
[0019] Furthermore, the temporary interception net comprises a plurality of support rods, and the plurality of support rods are arranged at intervals along the extension direction of the groove;
[0020] One end of the support rod extends into the slope surface, and the other end protrudes from the slope surface and is installed with the protective fence.
[0021] Furthermore, the cross section of the groove is set to be a trapezoid that is wide at the top and narrow at the bottom.
[0022] Furthermore, the slope ratio of the side wall of the groove is set to 1:0.5.
[0023] Based on the above technical solutions, the technical effects that can be achieved by the utility model are analyzed as follows:
[0024] The utility model provides an anti-slag sliding device comprising a groove and a plurality of temporary interception nets arranged on a slope surface; the groove and the plurality of temporary interception nets are arranged in sequence from top to bottom along the slope surface; each temporary interception net is provided with a plurality of buffer holes, and the plurality of buffer holes are arranged in sequence along the length direction and the width direction of the temporary interception net; the areas of the buffer holes of the plurality of temporary interception nets decrease in sequence along the direction from top to bottom of the slope surface.
[0025] Multiple temporary interception nets are arranged in intervals from top to bottom, and the area of the buffer holes decreases successively, so as to intercept slag of different particle sizes step by step, slow down the slag slip phenomenon, and avoid the problem that a single temporary interception net is easily damaged due to excessive slag. In addition, the temporary interception net can be used temporarily and repeatedly, which has the advantages of economy, convenience and high practicality.
[0026] The grooves can drain rainfall from the slope and buffer the debris generated by construction above the slope, reducing the impact of the debris on the temporary interception net and ensuring the stability of the temporary interception net. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0028] Figure 1 A cross-sectional view of a slag slide prevention device provided in an embodiment of the utility model;
[0029] Figure 2 A schematic diagram of the structure of a first temporary interception net in a slag slide prevention device provided in an embodiment of the utility model;
[0030] Figure 3 A schematic diagram of the structure of the second temporary interception net in the slag sliding prevention device provided in an embodiment of the utility model;
[0031] Figure 4 A schematic diagram of the structure of the third temporary interception net in the slag slide prevention device provided in an embodiment of the utility model;
[0032] Figure 5 A cross-sectional view of a groove in a slag slip prevention device provided in an embodiment of the utility model.
[0033] icon:
[0034] 100-groove;
[0035] 200-temporary interception net; 210-buffer hole; 220-first temporary interception net; 230-second temporary interception net; 240-third temporary interception net; 250-protective fence; 260-support rod;
[0036] 300-slope;
[0037] a-vertical direction. DETAILED DESCRIPTION
[0038] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0039] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0041] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, or the orientation or position relationship in which the utility model product is usually placed when in use, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0042] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0043] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0044] In conjunction with the accompanying drawings, some embodiments of the present invention are described in detail below. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0045] During the construction of high-speed railways, highways, wind power or water conservancy projects, a large number of high fill slopes will inevitably be generated. Under the action of rainfall scouring and gravity, the earthwork of these high fill slopes will roll or slide down along the slope surface 300, destroying the stability and integrity of the slope surface 300, and then causing large-scale slag sliding on the slope surface 300. The slag sliding phenomenon will not only harm the vegetation, land and water system downstream, but may also lead to the phenomenon of "white mountains", causing serious soil erosion, and affecting the beauty and ecological environment of the slope surface 300.
[0046] In view of this, the anti-slag sliding device provided by the embodiment of the utility model includes a groove 100 and a plurality of temporary interception nets 200 arranged on the slope 300; the groove 100 and the plurality of temporary interception nets 200 are arranged in sequence from top to bottom along the slope 300; each temporary interception net 200 is provided with a plurality of buffer holes 210, and the plurality of buffer holes 210 are arranged in sequence along the length direction and the width direction of the temporary interception net 200; the areas of the buffer holes 210 of the plurality of temporary interception nets 200 decrease in sequence from top to bottom along the slope 300.
[0047] Specifically, see Figure 1 , multiple temporary interception nets 200 are vertically arranged, and the axis of the buffer hole 210 is perpendicular to the extension direction of the groove 100.
[0048] See also Figures 1 to 4 , multiple temporary interception nets 200 are arranged in sequence from top to bottom, and the area of the buffer hole 210 is reduced in sequence, so as to intercept slag bodies of different particle sizes step by step, slow down the slag slip phenomenon, and avoid the problem that a single temporary interception net 200 is easily damaged due to excessive slag bodies. In addition, the temporary interception net 200 can be used temporarily and repeatedly, which has the advantages of economy, convenience and high practicality.
[0049] See also Figure 1 and Figure 5 The groove 100 can drain the rainfall from the slope 300 and buffer the slag generated by the construction above the slope 300, thereby reducing the impact of the slag on the temporary interception net 200 and ensuring the stability of the temporary interception net 200.
[0050] The structure and shape of the slag prevention device are described in detail below:
[0051] In an optional solution of the embodiment of the utility model, the areas and shapes of the multiple buffer holes 210 on a single temporary interception net 200 are the same.
[0052] Specifically, see Figures 2 to 4 The temporary interception net 200 is set in a square shape, with the length direction being set along the extension direction of the groove 100 and the width direction being set along the vertical direction a.
[0053] The areas and shapes of the multiple buffer holes 210 on a single temporary interception net 200 are the same, which is convenient for processing; of course, the areas of the multiple buffer holes 210 on a single temporary interception net 200 are different, but the requirement that the areas of the buffer holes 210 of the multiple temporary interception nets 200 decrease successively from top to bottom along the slope 300 is met. For example, the area of the buffer hole 210 located in the middle position of the single temporary interception net 200 is the largest, and the smaller the area of the buffer holes 210 on both sides of the temporary interception net 200 should also be within the protection scope of the embodiments of the present utility model.
[0054] In an optional solution of the embodiment of the utility model, the shapes of the buffer holes 210 of the multiple temporary interception nets 200 are all the same.
[0055] Specifically, see Figures 2 to 4 The overall sizes of the multiple temporary interception nets 200 are equal, and the areas of the buffer holes 210 of the multiple temporary interception nets 200 decrease successively from top to bottom along the slope 300, and the number of the buffer holes 210 increases successively.
[0056] The shapes of the buffer holes 210 of the multiple temporary interception nets 200 are all the same, which further facilitates processing.
[0057] In an optional solution of the embodiment of the utility model, the buffer hole 210 is set to be square.
[0058] Specifically, see Figures 2 to 4 , in two adjacent temporary interception nets 200, the area of the buffer holes 210 of the temporary interception net 200 located at the upper part of the slope 300 is 4 times the area of the buffer holes 210 of the temporary interception net 200 located at the lower part of the slope 300; of course, in two adjacent temporary interception nets 200, the area of the buffer holes 210 of the temporary interception net 200 located at the upper part of the slope 300 is other multiples of the area of the buffer holes 210 of the temporary interception net 200 located at the lower part of the slope 300, such as 2 times, 3 times or 5 times, etc., which should also be within the protection scope of the embodiments of the present utility model.
[0059] The buffer hole 210 is set to be square, which is further convenient for processing. Of course, the buffer hole 210 is set to other shapes, such as round, which should also be within the protection scope of the embodiment of the utility model.
[0060] In an optional scheme of an embodiment of the utility model, multiple temporary interception nets 200 include a first temporary interception net 220, a second temporary interception net 230 and a third temporary interception net 240, and the first temporary interception net 220, the second temporary interception net 230 and the third temporary interception net 240 are arranged in sequence from top to bottom along the slope 300; the buffer holes 210 of the first temporary interception net 220 are set to 30cm×30cm; the buffer holes 210 of the second temporary interception net 230 are set to 15cm×15cm; the buffer holes 210 of the third temporary interception net 240 are set to 5cm×5cm.
[0061] Specifically, see Figure 1 In this embodiment, three temporary interception nets 200 are provided, namely, a first temporary interception net 220, a second temporary interception net 230 and a third temporary interception net 240. Of course, other numbers of temporary interception nets 200, such as two, four or five, should also be within the protection scope of the embodiment of the utility model; the specific number can be set according to the specific conditions of the slope 300.
[0062] The buffer holes 210 of the first temporary interception net 220 are set to 30cm×30cm; the buffer holes 210 of the second temporary interception net 230 are set to 15cm×15cm; the buffer holes 210 of the third temporary interception net 240 are set to 5cm×5cm, so that the areas of the buffer holes 210 of the multiple temporary interception nets 200 decrease successively from top to bottom, thereby achieving step-by-step interception of slag of different particle sizes, slowing down the slag sliding phenomenon, and avoiding the problem of a single temporary interception net 200 being easily damaged due to excessive slag.
[0063] In the optional scheme of the embodiment of the utility model, please see Figure 1 , the distance between the second temporary interception net 230 and the first temporary interception net 220 is equal to the distance between the second temporary interception net 230 and the third temporary interception net 240.
[0064] Specifically, in this embodiment, the distance between the second temporary interception net 230 and the first temporary interception net 220 and the distance between the second temporary interception net 230 and the third temporary interception net 240 are both set to 50 cm, so that the impact force on each temporary interception net 200 is almost the same, thereby preventing a temporary interception net 200 from being easily damaged due to excessive impact force.
[0065] In an optional solution of the embodiment of the utility model, the temporary interception net 200 includes a protective fence 250; the protective fence 250 has a buffer hole 210.
[0066] Specifically, in this embodiment, the protective fence 250 is woven using bamboo pieces, which are light in weight, tough and easy to obtain, so that the protective fence 250 is light in weight and easy to carry, has good toughness to avoid breakage after impact, and is easy to make.
[0067] The protective fence 250 has a buffer hole 210, which makes the temporary interception net 200 economical, practical and convenient.
[0068] In an optional scheme of an embodiment of the utility model, the temporary interception net 200 includes a plurality of support rods 260, which are arranged at intervals along the extension direction of the groove 100; one end of the support rod 260 extends into the slope 300, and the other end protrudes from the slope 300 and is equipped with a protective fence 250.
[0069] Specifically, the support rod 260 is configured as a steel pipe, the steel pipe is buried at a depth of 20 cm, and the above-ground portion is 80 cm deep.
[0070] The support rod 260 enables the temporary interception net 200 to be installed on the slope 300 and improves the strength of the temporary interception net 200 .
[0071] In an optional solution of the embodiment of the utility model, the cross section of the groove 100 is set to be a trapezoid that is wide at the top and narrow at the bottom.
[0072] The groove 100 has a trapezoidal cross section, which enlarges the entrance of the groove 100 and facilitates the slag to fall into the groove 100 .
[0073] In an optional solution of the embodiment of the present utility model, the slope ratio of the side wall of the groove 100 is set to 1:0.5.
[0074] Specifically, in this embodiment, the width of the bottom wall of the groove 100 is set to 20 cm, and the depth is set to 20 cm.
[0075] The slope ratio of the sidewall of the groove 100 is set to 1:0.5, so that the groove 100 is a trapezoidal shape that is wide at the top and narrow at the bottom.
[0076] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.
Claims
1. A slag-sliding prevention device, characterized in that: include: A groove (100) and a plurality of temporary interception nets (200) arranged on a slope surface (300); The groove (100) and the plurality of temporary interception nets (200) are sequentially arranged at intervals from top to bottom along the slope surface (300); Each of the temporary interception nets (200) is provided with a plurality of buffer holes (210), and the plurality of buffer holes (210) are arranged at intervals along the length direction and the width direction of the temporary interception net (200); The areas of the buffer holes (210) of the plurality of temporary interception nets (200) decrease in sequence from top to bottom along the slope surface (300).
2. The slag-sliding prevention device according to claim 1, characterized in that: The areas and shapes of the plurality of buffer holes (210) on a single temporary interception net (200) are all the same.
3. The slag-sliding prevention device according to claim 2, characterized in that: The buffer holes (210) of the plurality of temporary interception nets (200) are all of the same shape.
4. The slag-sliding prevention device according to claim 3, characterized in that: The buffer hole (210) is configured in a square shape.
5. The slag-sliding prevention device according to claim 4, characterized in that: The plurality of temporary interception nets (200) include a first temporary interception net (220), a second temporary interception net (230) and a third temporary interception net (240), wherein the first temporary interception net (220), the second temporary interception net (230) and the third temporary interception net (240) are arranged in sequence from top to bottom along the slope surface (300); The buffer hole (210) of the first temporary interception net (220) is set to 30 cm×30 cm; The buffer hole (210) of the second temporary interception net (230) is set to 15 cm×15 cm; The buffer hole (210) of the third temporary interception net (240) is set to 5cm×5cm.
6. The slag-sliding prevention device according to claim 5, characterized in that: The distance between the second temporary interception net (230) and the first temporary interception net (220) is equal to the distance between the second temporary interception net (230) and the third temporary interception net (240).
7. The slag-sliding prevention device according to claim 1, characterized in that: The temporary interception net (200) comprises a protective fence (250); The protective fence (250) has the buffer hole (210).
8. The slag-sliding prevention device according to claim 7, characterized in that: The temporary interception net (200) comprises a plurality of support rods (260), and the plurality of support rods (260) are arranged at intervals along the extension direction of the groove (100); One end of the support rod (260) extends into the slope surface (300), and the other end protrudes from the slope surface (300) and is installed with the protective fence (250).
9. The slag slide prevention device according to any one of claims 1 to 8, characterized in that: The cross section of the groove (100) is arranged to be a trapezoidal shape that is wide at the top and narrow at the bottom.
10. The slag sliding prevention device according to claim 9, characterized in that: The slope ratio of the side wall of the groove (100) is set to 1:0.5.