Preparation device for environment-friendly concrete by using building solid waste
By designing detachable crushing rollers and disassembly components, combined with motor drive and funnel-shaped material collection box, the problem that existing equipment is difficult to meet the crushing needs of construction waste of different sizes is improved, and the applicability and reliability of the equipment are improved.
Patent Information
- Application Number
- CN202420556660.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-03-21
AI Technical Summary
In existing environmentally friendly concrete preparation equipment that utilizes construction solid waste, the first gear roller and the second gear roller are not convenient to disassemble and replace, and it is difficult to meet the crushing needs of construction waste of different sizes, which reduces the applicability of the equipment.
A device including a crushing box, a detachable crushing roller and a disassembly assembly is designed. The rotating shaft and the inserting rod structure are driven by the motor, so that the crushing roller can be easily replaced and adjusted, and the funnel-shaped material collection box and the dredging shaft are used to prevent blockage. Ensure that construction waste of different sizes is broken.
It realizes flexible crushing of construction waste, avoids the problem of reduced equipment applicability, and improves the reliability and safety of equipment through solenoid valves and metal adsorption plates.
Smart Images

Figure CN222174196U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction engineering, and in particular to a device for preparing environmentally friendly concrete using construction solid waste. Background Art
[0002] Construction waste refers to the general term for slag, waste concrete, waste bricks and other wastes generated by people in the production activities of the construction industry such as demolition, construction, decoration, and repair. According to the source of generation, construction waste can be divided into engineering slag, decoration waste, demolition waste, engineering mud, etc.; according to the composition, construction waste can be divided into slag, concrete blocks, broken stones, brick and tile fragments, waste mortar, mud, asphalt blocks, waste plastics, waste metals, waste bamboo and wood, etc.
[0003] The invention patent with announcement number CN114210437A proposes a method and equipment for preparing environmentally friendly concrete using construction solid waste, including a base, columns, beams, an extrusion box, an extrusion assembly, a feed hopper, a crushing box, a bracket, a crushing assembly, a pipeline and a collection box.
[0004] The above-mentioned method and equipment for preparing environmentally friendly concrete using construction solid waste, uses a first gear roller and a second gear roller to crush the squeezed construction debris, but the first gear roller and the second gear roller are not convenient to disassemble and replace, making it difficult to crush the construction debris according to different size requirements, resulting in a problem of reduced applicability of the equipment. Utility Model Content
[0005] The purpose of the utility model is to solve or at least alleviate the existing method and equipment for preparing environmentally friendly concrete using construction solid waste. The squeezed construction waste is crushed by a first gear roller and a second gear roller. However, the first gear roller and the second gear roller are not convenient to disassemble and replace, making it difficult to crush the construction waste to different sizes, which reduces the applicability of the equipment.
[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0007] A preparation device for environmentally friendly concrete using construction solid waste comprises a crushing box, two crushing rollers installed in the crushing box for crushing concrete, and a disassembly assembly for disassembling and replacing the specifications of the crushing rollers, wherein the disassembly assembly comprises a fixing plate fixedly connected to a side wall of one side of the crushing box, two first motors are arranged on the upper surface of the fixing plate, two rotating shafts are arranged on the side walls on both sides of the crushing box, opposite ends of the rotating shafts penetrate the crushing box and are fixedly connected to square plug rods, square slots are arranged at both ends of the crushing rollers, and the square plug rods are plugged into the square slots, wherein the ends of the two rotating shafts away from the crushing rollers are respectively fixedly connected to the output ends of the first motor, and the ends of the other two rotating shafts away from the crushing rollers are rotatably connected to fixing blocks, a plurality of first fixing bolts are arranged on the fixing block, the first fixing bolts all penetrate the fixing block and are threadedly connected to the crushing box, a plurality of second fixing bolts are arranged on the first motor, the second fixing bolts all penetrate the first motor and are threadedly connected to the fixing plate.
[0008] By adopting the above technical scheme, when in use, pour the construction debris from the top of the crushing box, and start the two first motors to make the crushing rollers rotate forward and backward to crush the construction debris. When the crushing size of the construction debris needs to be changed, the first fixing bolt and the second fixing bolt are removed so that the fixing block and the first motor can be moved, and the square plug rod is pulled out of the square slot to remove the crushing roller from the crushing box, and then crushing rollers of different specifications are installed for crushing, thereby avoiding as much as possible the problem of difficulty in crushing construction debris of different sizes, which reduces the applicability of the equipment.
[0009] Optionally, the bottom end of the crushing box is fixedly connected to a communicating pipe, the bottom end of the pipe is fixedly connected to a material receiving box, the bottom end of the material receiving box is fixedly connected to a discharge pipe, and a solenoid valve is installed on the discharge pipe.
[0010] By adopting the above technical solution, the crushed construction debris can be transported to the receiving box for collection through the pipeline, and the construction debris in the receiving box can be discharged from the discharge pipe by starting the solenoid valve, which is convenient for use.
[0011] Optionally, the inner bottom ends of the crushing box and the material receiving box are both configured to be funnel-shaped.
[0012] By adopting the above technical solution, the funnel-shaped crushing box and the collecting box can prevent construction debris from remaining in the crushing box or the collecting box and being difficult to discharge.
[0013] Optionally, an operating box is provided inside the crushing box below the crushing roller, support rods are fixedly connected to four sides of the operating box, and one end of the support rods away from the operating box is fixedly connected to the inner wall of the crushing box. A second motor is provided in the operating box, and an output end of the second motor passes through the bottom end of the operating box and is fixedly connected to a dredging shaft, and one end of the dredging shaft away from the second motor passes through the pipeline and the material receiving box and is located inside the discharge pipe.
[0014] By adopting the above technical solution, the second motor is started to rotate the dredging shaft in the pipeline and the discharge pipe, so that the pipeline and the discharge pipe can be dredged to prevent construction debris from clogging the pipeline or the discharge pipe.
[0015] Optionally, the top end of the operation box is arranged to be inclined.
[0016] By adopting the above technical solution, it is possible to prevent the crushed construction debris from falling and accumulating on top of the operating box, making it difficult to remove.
[0017] Optionally, a feed hopper is fixedly connected to the top of the crushing box, and a metal adsorption plate is fixedly connected to one side of the inner wall of the feed hopper.
[0018] By adopting the above technical solution, the construction debris can be conveniently poured into the crushing box through the feed hopper. At the same time, some metal in the construction debris can be adsorbed by the metal adsorption plate to prevent the metal from falling onto the crushing roller and causing damage to the crushing roller.
[0019] Optionally, the length of the square insertion rod does not exceed the depth of the square slot.
[0020] By adopting the above technical solution, it is possible to prevent the square rod from partially extending out of the two ends of the crushing roller when inserted into the square slot, causing the square rod to be embedded in the inner wall of the crushing box. The gap between the square rod and the crushing box may cause construction debris to be stuck and filled, making it difficult for the crushing roller to rotate.
[0021] In summary, the beneficial effects of this application are as follows:
[0022] 1. The present application adopts the coordinated arrangement between the rotating shaft, the square plug rod and the square slot. When in use, the construction debris is poured from the top of the crushing box, and the crushing roller is rotated forward and reversely by starting the two first motors to crush the construction debris. When the crushing size of the construction debris needs to be changed, the fixing block and the first motor can be moved by removing the first fixing bolt and the second fixing bolt, and the square plug rod is pulled out of the square slot, and the crushing roller can be taken out of the crushing box, and then crushing rollers of different specifications can be installed for crushing, thereby avoiding the problem of difficulty in crushing construction debris of different sizes, which reduces the applicability of the equipment.
[0023] 2. By starting the second motor to rotate the dredging shaft in the pipeline and the discharge pipe, the pipeline and the discharge pipe can be dredged to prevent the construction debris from clogging the pipeline or the discharge pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0025] Figure 2 This is a schematic diagram of the internal structure of the crushing box and the material receiving box of the utility model;
[0026] Figure 3 It is an exploded schematic diagram of the connection structure between the square plug rod and the square slot of the utility model.
[0027] Explanation of the accompanying drawings: 1. Crushing box; 2. Crushing roller; 3. Fixed plate; 4. First motor; 5. Rotating shaft; 6. Square plug rod; 7. Square slot; 8. Fixed block; 9. First fixing bolt; 10. Second fixing bolt; 11. Pipeline; 12. Material receiving box; 13. Discharge pipe; 14. Solenoid valve; 15. Operation box; 16. Support rod; 17. Second motor; 18. Clearing shaft; 19. Feed hopper; 20. Metal adsorption plate. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1-3 This application is described in further detail.
[0029] See also Figure 1-3 A preparation device for environmentally friendly concrete using construction solid waste includes a crushing box 1 fixedly connected to a bottom plate by a bracket, two crushing rollers 2 installed in the crushing box 1 for crushing concrete, and a disassembly assembly for disassembling and replacing the crushing rollers 2 of different sizes. The disassembly assembly includes a fixing plate 3 fixedly connected to a side wall of one side of the crushing box 1, and two first motors 4 for providing power are arranged on the upper surface of the fixing plate 3. Two rotating shafts 5 for driving the crushing rollers 2 to rotate are arranged on both side walls of the crushing box 1. The opposite ends of the rotating shafts 5 penetrate the crushing box 1 and are fixedly connected with square plug rods 6 for detachable connection with the crushing rollers 2. Square slots 7 are provided at both ends of the crushing roller 2, and square plug rods 6 are plugged into the square slots 7. The ends of the two rotating shafts 5 away from the crushing roller 2 are fixedly connected to the output ends of the first motor 4 respectively, and the other two rotating shafts 5 are rotatably connected to the fixed blocks 8 at the ends away from the crushing roller 2. The fixed blocks 8 are provided with a plurality of first fixing bolts 9 for fixing the fixed blocks 8. The first fixing bolts 9 all penetrate the fixed blocks 8 and are threadedly connected to the crushing box 1. The first motor 4 is provided with a plurality of second fixing bolts 10 for fixing the first motor 4. The second fixing bolts 10 all penetrate the first motor 4 and are threadedly connected to the fixing plate 3.
[0030] When in use, pour the construction debris from the top of the crushing box 1, and start the two first motors 4 to make the crushing roller 2 rotate forward and backward to crush the construction debris. When the crushing size of the construction debris needs to be changed, the first fixing bolt 9 and the second fixing bolt 10 are removed to make the fixing block 8 and the first motor 4 movable, and the square plug rod 6 is pulled out of the square slot 7 to remove the crushing roller 2 from the crushing box 1, and then crushing rollers 2 of different specifications are installed for crushing, thereby avoiding as much as possible the problem of difficulty in crushing construction debris of different sizes, which reduces the applicability of the equipment.
[0031] Reference Figure 2 The bottom end of the crushing box 1 is fixedly connected with a communicating pipe 11, the bottom end of the pipe 11 is fixedly connected with a collecting box 12, the bottom end of the collecting box 12 is fixedly connected with a discharging pipe 13, and a solenoid valve 14 is installed on the discharging pipe 13. The crushed construction debris can be transported to the collecting box 12 for collection through the pipe 11, and the construction debris in the collecting box 12 can be discharged from the discharging pipe 13 by starting the solenoid valve 14, which is convenient for use.
[0032] Reference Figure 2 The bottom ends of the crushing box 1 and the collecting box 12 are both funnel-shaped. The funnel-shaped crushing box 1 and the collecting box 12 can prevent construction debris from remaining in the crushing box 1 or the collecting box 12 and being difficult to discharge.
[0033] Reference Figure 2 An operation box 15 is provided inside the crushing box 1 below the crushing roller 2. Support rods 16 are fixedly connected to the four sides of the operation box 15. The ends of the support rods 16 away from the operation box 15 are fixedly connected to the inner wall of the crushing box 1. A second motor 17 is provided in the operation box 15. The output end of the second motor 17 passes through the bottom end of the operation box 15 and is fixedly connected to a dredging shaft 18. The end of the dredging shaft 18 away from the second motor 17 passes through the pipeline 11 and the material receiving box 12 and is located inside the discharge pipe 13. By starting the second motor 17 to make the dredging shaft 18 rotate in the pipeline 11 and the discharge pipe 13, the pipeline 11 and the discharge pipe 13 can be dredged to prevent construction debris from being blocked in the pipeline 11 or the discharge pipe 13.
[0034] Reference Figure 2 The top of the operation box 15 is set to be inclined to prevent the crushed construction debris from falling and accumulating on the top of the operation box 15, making it difficult to take out.
[0035] Reference Figure 1 A feed hopper 19 is fixedly connected to the top of the crushing box 1, and a metal adsorption plate 20 is fixedly connected to one side of the inner wall of the feed hopper 19. The feed hopper 19 is used to conveniently pour construction debris into the crushing box 1. At the same time, the metal adsorption plate 20 can adsorb some metal in the construction debris to prevent the metal from falling onto the crushing roller 2 and causing damage to the crushing roller 2.
[0036] Reference Figure 3 The length of the square rod 6 does not exceed the depth of the square slot 7, which can prevent the square rod 6 from partially extending out of the two ends of the crushing roller 2 when inserted into the square slot 7, so that the square rod 6 is embedded in the inner wall of the crushing box 1. The gap between the square rod 6 and the crushing box 1 may cause construction debris to be stuck and filled, making it difficult for the crushing roller 2 to rotate.
[0037] The implementation principle of the present application is as follows: when in use, pour the construction debris from the top of the crushing box 1, and start the two first motors 4 to make the crushing roller 2 rotate forward and reverse to crush the construction debris. When the crushing size of the construction debris needs to be changed, the first fixing bolt 9 and the second fixing bolt 10 are removed so that the fixing block 8 and the first motor 4 can be moved, and the square plug rod 6 is pulled out of the square slot 7, and the crushing roller 2 can be taken out of the crushing box 1, and then crushing rollers 2 of different specifications are installed for crushing, thereby avoiding as much as possible the problem of difficulty in crushing construction debris of different sizes, which reduces the applicability of the equipment.
[0038] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A device for preparing environmentally friendly concrete using construction solid waste, comprising a crushing box (1), two crushing rollers (2) installed in the crushing box (1) for crushing concrete, and a disassembly assembly for disassembling and replacing the crushing rollers (2) in different sizes, characterized in that: The disassembly assembly comprises a fixing plate (3) fixedly connected to a side wall of one side of the crushing box (1); two first motors (4) are arranged on the upper surface of the fixing plate (3); two rotating shafts (5) are arranged on the side walls of both sides of the crushing box (1); opposite ends of the rotating shafts (5) penetrate the crushing box (1) and are fixedly connected to square plug rods (6); square slots (7) are provided at both ends of the crushing roller (2); the square plug rods (6) are plugged into the square slots (7); ends of two rotating shafts (5) away from the crushing roller (2) are respectively fixedly connected to output ends of the first motor (4); ends of the other two rotating shafts (5) away from the crushing roller (2) are rotatably connected to fixing blocks (8); a plurality of first fixing bolts (9) are arranged on the fixing block (8); the first fixing bolts (9) penetrate the fixing block (8) and are threadedly connected to the crushing box (1); a plurality of second fixing bolts (10) are arranged on the first motor (4); the second fixing bolts (10) penetrate the first motor (4) and are threadedly connected to the fixing plate (3).
2. The device for preparing environmentally friendly concrete using construction solid waste according to claim 1, characterized in that: The bottom end of the crushing box (1) is fixedly connected to a communicating pipe (11), the bottom end of the pipe (11) is fixedly connected to a material receiving box (12), the bottom end of the material receiving box (12) is fixedly connected to a material discharge pipe (13), and a solenoid valve (14) is installed on the material discharge pipe (13).
3. The device for preparing environmentally friendly concrete using construction solid waste according to claim 2, characterized in that: The inner bottom ends of the crushing box (1) and the material receiving box (12) are both designed to be funnel-shaped.
4. The device for preparing environmentally friendly concrete using construction solid waste according to claim 3, characterized in that: An operating box (15) is provided inside the pulverizing box (1) and below the pulverizing roller (2). Support rods (16) are fixedly connected to four sides of the operating box (15). One end of the support rod (16) away from the operating box (15) is fixedly connected to the inner wall of the pulverizing box (1). A second motor (17) is provided inside the operating box (15). The output end of the second motor (17) passes through the bottom end of the operating box (15) and is fixedly connected to a dredging shaft (18). One end of the dredging shaft (18) away from the second motor (17) passes through the pipeline (11) and the material receiving box (12) and is located inside the material discharging pipe (13).
5. The device for preparing environmentally friendly concrete using construction solid waste according to claim 4, characterized in that: The top end of the operation box (15) is arranged in an inclined shape.
6. The device for preparing environmentally friendly concrete using construction solid waste according to claim 1, characterized in that: A feed hopper (19) is fixedly connected to the top of the crushing box (1), and a metal adsorption plate (20) is fixedly connected to one side of the inner wall of the feed hopper (19).
7. The device for preparing environmentally friendly concrete using construction solid waste according to claim 1, characterized in that: The length of the square insertion rod (6) does not exceed the depth of the square slot (7).