Building eave eagle beak type water drip construction formwork
By introducing drive mechanism and sealing components into the construction formwork of the eagle-beak drip line of the building eaves, the time-consuming and labor-intensive and slurry leakage during baffle position adjustment and formwork splicing is solved, and the effect of rapid adjustment and efficient splicing is achieved.
Patent Information
- Application Number
- CN202420168097.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-01-24
AI Technical Summary
The existing building eaves eaves drip line construction formwork needs to loosen the screw, move the baffle and tighten the screw when adjusting the baffle position. The process is time-consuming and labor-intensive, and it is easy to leak slurry when the template is spliced.
The drive mechanism is used to drive the slide to move the drive connecting plate to adjust the baffle position, and the lead screw is rotated by bevel gears and handwheels to facilitate the adjustment of the baffle position; when splicing the template, use gaskets and fixing components to reduce the risk of slurry leakage.
It realizes rapid adjustment of baffle position and efficient formwork splicing, reduces time and effort consumption during construction, and effectively reduces the possibility of slurry leakage.
Smart Images

Figure CN222184109U_ABST
