Clamp holder for hydrogeological hole casing pipe

The pipe clamp for hydrogeological borehole walls addresses the inefficiencies of conventional methods by providing automated and flexible clamping, enhancing installation speed and safety in hydrogeological drilling.

CN222184697UActive Publication Date: 2024-12-17CHINA GEOLOGICAL SURVEY HARBIN NATURAL RESOURCES COMPREHENSIVE SURVEY CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420589726.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-12-17
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The conventional method for lowering wellbore pipes in hydrogeological drilling is cumbersome, time-consuming, and prone to misalignment, leading to potential construction accidents due to the need for repeated welding and manual handling.

Method used

A pipe clamp for hydrogeological borehole walls featuring a rectangular frame with hinged clamping plates and handles, allowing for automated and flexible clamping and fixing of wellbore pipes using rotatable sleeves and pins, enabling quick and efficient installation and adjustment to different pipe diameters.

Benefits of technology

The pipe clamp simplifies and accelerates the installation process, saving time, manpower, and costs while ensuring accurate alignment, reducing the risk of accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222184697U_ABST
    Figure CN222184697U_ABST
Patent Text Reader

Abstract

The utility model discloses a clamp holder for a hydrogeological hole casing pipe, which comprises a rectangular frame, two symmetrically arranged first clamping plates are hinged to the top of the rectangular frame, a semicircular first bayonet is formed in each first clamping plate, a second clamping plate is rotatably mounted on each first clamping plate, and the second clamping plate is hinged to the top of the rectangular frame. And a semicircular second bayonet is formed in the second clamping plate. The casing pipe fixing device can conveniently fix the casing pipe, is simple, convenient and fast, saves time, manpower and oil compared with a common method, and achieves cost saving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hydrogeological drilling, in particular to a pipe clamper for a hydrogeological hole wall. Background Art

[0002] In mud hydrogeological drilling operations, after the drilling construction is completed, it often takes a lot of time to lower the wellbore pipe. The conventional method is to cut two circular holes at the wellbore pipe welding point, insert the steel bars horizontally into the wellbore pipe, use wire rope to connect the steel bars to the power head, and then the power head will lift the wellbore pipe and drop it at the hole mouth for welding. Finally, the wire rope and steel bars are removed, and the cut circular holes are welded and sealed. The wellbore pipe is welded repeatedly in sequence. The operation is very cumbersome and takes a lot of time. The operation requires the operator to have rich practical experience. Often, because the wellbore pipe connection cannot be completely vertical, the wellbore pipe is offset after accumulation one by one, which causes the wellbore pipe to fail to reach the bottom of the well, resulting in a hydrological hole construction accident. Utility Model Content

[0003] The utility model aims to solve the shortcomings in the prior art and proposes a pipe clamp for the wall of a hydrogeological hole.

[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0005] A pipe clamp for a hydrogeological borehole wall comprises a rectangular frame, the top of which is hinged with two symmetrically arranged first clamping plates, the first clamping plates are provided with a semicircular first clamping opening, a second clamping plate is rotatably mounted on the first clamping plate, and the second clamping plate is provided with a semicircular second clamping opening.

[0006] Preferably, a first handle is fixed on the first card plate, and a second handle is fixed on the second card plate.

[0007] Preferably, third handles are fixed to the four corners of the rectangular frame.

[0008] Preferably, a second sleeve is fixed to one end of the second clamping plate, a first sleeve is fixed to the first clamping plate, a same pin is rotatably sleeved between the second sleeve and the first sleeve, and the first clamping plate and the second clamping plate are rotatably connected via the first sleeve, the second sleeve and the pin.

[0009] Preferably, the diameter of the first bayonet is greater than the diameter of the second bayonet.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] 1. In the utility model, the first handle is used to drive the first card plate to rotate, the second handle is used to drive the second card plate to rotate, and the second handle is used to drive the second card plate to rotate;

[0012] 2. In the utility model, the well wall pipe is clamped by the second clamping openings on the two second clamping plates. At this time, the lifting ring welded on the well wall pipe plays a role in preventing the well wall pipe from falling, thereby achieving the role of fixing the well wall pipe in disguise. When the well wall pipe is put on, it is only necessary to open the second clamping plate. The overall operation is automated, simple, convenient and fast, saving time, manpower and fuel compared with the commonly used methods, and achieving cost savings;

[0013] 3. In the utility model, by pulling out the pin from the first sleeve and the second sleeve, the second clamping plate can be easily replaced according to the diameter of the well wall pipe, so that the second clamping port on the second clamping plate matches the well wall pipe, which is very flexible to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A top view of a pipe clamp for a hydrogeological borehole wall proposed by the utility model;

[0015] Figure 2 This is a front view of a pipe clamp for a hydrogeological borehole wall proposed by the utility model;

[0016] Figure 3 This is a structural schematic diagram of a first clamping plate for a hydrogeological borehole wall pipe clamp proposed by the utility model;

[0017] Figure 4 This is a structural schematic diagram of a second clamping plate for a hydrogeological borehole wall pipe clamp proposed by the utility model;

[0018] Figure 5 Schematic diagram of the structure of the well wall pipe.

[0019] In the figure: 1 rectangular frame, 2 first clamping plate, 21 first clamping port, 3 second clamping plate, 31 second clamping port, 4 third handle, 5 first shaft sleeve, 6 second shaft sleeve, 7 pin shaft, 8 second handle, 9 first handle. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0021] Reference Figure 1-5A pipe clamp for a hydrogeological borehole wall, comprising a rectangular frame 1, the top of which is hinged with two symmetrically arranged first clamping plates 2, a semicircular first clamping opening 21 being provided on the first clamping plate 2, a second clamping plate 3 being rotatably mounted on the first clamping plate 2, a semicircular second clamping opening 31 being provided on the second clamping plate 3, the diameter of the first clamping opening 21 being greater than the diameter of the second clamping opening 31, the well wall pipe being clamped by the second clamping openings 31 on the two second clamping plates 3, at which time the lifting ring welded on the well wall pipe plays a role in preventing the well wall pipe from falling, a first handle 9 being fixed on the first clamping plate 2, the first handle 9 being used to facilitate the first clamping plate 2 to rotate, a second handle 9 being fixed on the second clamping plate 3 A second handle 8 is used to drive the second clamping plate 3 to rotate. The four corners of the rectangular frame 1 are fixed with a third handle 4, and the rectangular frame 1 can be moved easily through the third handle 4. A second shaft sleeve 6 is fixed to one end of the second clamping plate 3. A first shaft sleeve 5 is fixed to the first clamping plate 2. The second shaft sleeve 6 and the first shaft sleeve 5 are rotatably sleeved with the same pin shaft 7. The first clamping plate 2 and the second clamping plate 3 are rotatably connected through the first shaft sleeve 5, the second shaft sleeve 6, and the pin shaft 7. By pulling the pin shaft 7 out of the first shaft sleeve 5 and the second shaft sleeve 6, the second clamping plate 3 can be easily replaced according to the diameter of the well wall pipe, so that the second bayonet 31 on the second clamping plate 3 matches the well wall pipe, which is very flexible to use.

[0022] Working principle: when in use, the first handle 9 is used to drive the first clamping plate 2 to rotate, and the second handle 8 is used to drive the second clamping plate 3 to rotate. The second handle 8 is used to drive the second clamping plate 3 to rotate, and the well wall pipe is clamped by the second clamping openings 31 on the two second clamping plates 3. At this time, the lifting ring welded on the well wall pipe plays a role in preventing the well wall pipe from falling, thereby achieving the role of fixing the well wall pipe in disguise. When installing the well wall pipe, it is only necessary to open the second clamping plate 3. The overall operation is automated, simple, convenient and fast. It saves time, manpower, fuel and cost compared with the commonly used methods. By pulling the pin shaft 7 out of the first sleeve 5 and the second sleeve 6, the second clamping plate 3 can be easily replaced according to the diameter of the well wall pipe, so that the second clamping opening 31 on the second clamping plate 3 matches the well wall pipe, which is very flexible to use.

[0023] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A pipe clamp for a hydrogeological borehole wall, comprising a rectangular frame (1), characterized in that: The top of the rectangular frame (1) is hinged with two symmetrically arranged first clamping plates (2), the first clamping plates (2) are provided with a semicircular first clamping opening (21), the first clamping plates (2) are rotatably mounted with a second clamping plate (3), and the second clamping plates (3) are provided with a semicircular second clamping opening (31).

2. A pipe clamp for hydrogeological borehole wall according to claim 1, characterized in that: A first handle (9) is fixed on the first clamping plate (2), and a second handle (8) is fixed on the second clamping plate (3).

3. The pipe clamp for hydrogeological borehole wall according to claim 1, characterized in that: Third handles (4) are fixed to the four corners of the rectangular frame (1).

4. The pipe clamp for hydrogeological borehole wall according to claim 1, characterized in that: A second shaft sleeve (6) is fixed to one end of the second clamping plate (3); a first shaft sleeve (5) is fixed to the first clamping plate (2); a same pin shaft (7) is rotatably sleeved between the second shaft sleeve (6) and the first shaft sleeve (5); the first clamping plate (2) and the second clamping plate (3) are rotatably connected via the first shaft sleeve (5), the second shaft sleeve (6) and the pin shaft (7).

5. The pipe clamp for hydrogeological borehole wall according to claim 1, characterized in that: The diameter of the first bayonet (21) is greater than the diameter of the second bayonet (31).