Wall building auxiliary device for house building construction
By designing an adjustable support mechanism, the problem of difficulty in adjusting the plumb line position is solved, the construction process is convenient and flexible, adapted to the needs of walls of different thicknesses, and provided wall stability support.
Patent Information
- Application Number
- CN202421061097.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-05-15
AI Technical Summary
During the construction of the house, as the wall height increases, the fixed position of the plumb line is difficult to adjust, causing inconvenience to the construction personnel.
Design a wall-building auxiliary device for building construction, including multiple groups of support mechanisms, the support mechanism includes a support frame, mounting seat, slide chute, adjusting part and pulling board on the ground. The adjusting part can slide along the slide chute and bend The line moves with it, and the construction worker controls the position of the adjusting parts by holding the pull plate.
It realizes flexible adjustment of the vertical line position of the high-altitude, ensures smooth construction, is convenient and fast adjustment process, adapts to walls of different thicknesses, and reduces the risk of construction collapse.
Smart Images

Figure CN222276239U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction equipment, and in particular to a wall-building auxiliary device for building construction. Background Art
[0002] At present, in the process of building construction, bricks are usually used to build walls with cement. As the bricks are continuously stacked, the height of the wall will continue to rise. In order to make the wall perpendicular to the ground, a plumb line needs to be hung first, that is, a heavy hammer is hung with a thin wire. Due to the gravity of the earth, the heavy hammer is drooped in a state perpendicular to the horizontal line of the ground. At this time, the plumb line will be perpendicular to the horizontal line, and the construction workers can ensure the verticality of the wall according to the plumb line.
[0003] During the wall-building process, construction workers need to adjust the position of the plumb line according to their own construction position. As the wall height continues to increase, the fixed position of the plumb line will also increase accordingly. When the fixed position of the plumb line reaches a certain height, it will be difficult for construction workers to adjust the position of the plumb line, which brings great inconvenience to the construction workers. Utility Model Content
[0004] The present application provides a wall-building auxiliary device for building construction, which facilitates construction workers to adjust the position of a plumb line at a high place, thereby facilitating construction.
[0005] The present application provides a wall-building auxiliary device for building construction using the following technical solution:
[0006] A wall-building auxiliary device for building construction comprises a plurality of groups of supporting mechanisms, wherein the supporting mechanisms are symmetrically arranged on the left and right sides of a wall; the supporting mechanisms comprise supporting frames for erecting on the ground, and the supporting frames in the same group are symmetrically arranged on the front and rear sides of the wall; a mounting seat is horizontally arranged between adjacent supporting frames on the same side of the wall, a slide groove extending in the horizontal direction is penetrated through the mounting seat, an adjusting member is slidably arranged in the slide groove, a plumb line is arranged at one end of the adjusting member, and a traction plate extending downward is arranged at the other end of the adjusting member, and the traction plate is used for being held by construction personnel.
[0007] By adopting the above technical solution: when it is necessary to adjust the position of the plumb line at a high place, the construction workers only need to control the adjustment part to slide along the length direction of the slide groove by holding the traction plate, and the plumb line can move synchronously with the adjustment part; by moving the plumb line to the specified position, the smooth progress of subsequent construction can be ensured, and the whole adjustment process is convenient, fast and flexible to use.
[0008] Preferably, a roller is rotatably provided on the adjusting member, the bottom of the roller is placed in a mounting seat, and the roller is rotatably provided in the mounting seat along the length direction of the slide groove.
[0009] Preferably, the diameter of the roller is greater than the width of the slide groove, a slideway is provided on the inner side wall of the mounting seat, the length of the slideway extends along the length direction of the slide groove, and the roller is limited in the slideway.
[0010] Preferably, a hook is provided at one end of the plumb line, a hanging ring is provided on the adjusting member, and the plumb line is hung on the hanging ring through the hook.
[0011] Preferably, the support mechanism also includes a connecting frame, which has a plurality of threaded holes extending therethrough, and the threaded holes are arranged in sequence and at intervals along the length direction of the connecting frame; the support frame located on the same group of the support mechanisms is slidably mounted on the outside of the connecting frame along the length direction of the connecting frame; the connecting frame is provided with fasteners, which are used to be inserted into and threadedly connected to the threaded holes.
[0012] Preferably, the support frame is provided with an installation groove on the side wall facing the wall, and the installation grooves are arranged in sequence at intervals along the length direction of the support frame; a limit baffle is detachably installed between adjacent support frames located on the same side of the wall through the installation groove, and the two ends of the limit baffle are respectively inserted and limited in their respective relative installation grooves.
[0013] Preferably, an insertion rod is provided on the inner side wall of the installation groove, and an insertion hole for inserting the insertion rod is penetrated through the limit baffle.
[0014] In summary, the present application includes at least one of the following beneficial technical effects:
[0015] 1. It is convenient to adjust the position of the plumb line at a high place. By moving the plumb line to the designated position, the smooth progress of subsequent construction can be ensured. The whole adjustment process is convenient, fast and flexible to use;
[0016] 2. The setting of the roller can ensure that the adjusting part slides more smoothly along the length direction of the slide groove on the mounting seat;
[0017] 3. The spacing between the support frames in the same group can be adjusted according to the wall thickness, so as to adapt to the construction of walls with different thicknesses;
[0018] 4. The limit baffle can support the wall and ensure that the wall is not prone to collapse during the construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the overall structure of the embodiment of the present application installed on a wall;
[0020] Figure 2 It is a schematic diagram of the overall structure of an embodiment of the present application;
[0021] Figure 3 yes Figure 2 Schematic diagram of the local structure explosion;
[0022] Figure 4 yes Figure 3 Schematic diagram of the local structure explosion.
[0023] Explanation of the accompanying drawings: 1. Support mechanism; 10. Support frame; 11. Connecting frame; 110. Fastener; 12. Threaded hole; 13. Mounting groove; 130. Insert rod; 2. Mounting seat; 20. Slide groove; 21. Adjustment member; 22. Traction plate; 23. Roller; 24. Slideway; 25. Hanging ring; 3. Plumb line; 30. Hook; 4. Limit baffle; 40. Plug hole. DETAILED DESCRIPTION
[0024] The present application is further described in detail below in conjunction with the accompanying drawings.
[0025] The present application embodiment discloses a wall-building auxiliary device for building construction, referring to Figure 1 , Figure 2 , including multiple groups of support mechanisms 1. In this embodiment, there are two groups of support mechanisms 1, and the two groups of support mechanisms 1 are used to be symmetrically arranged on the left and right sides of the wall. Each group of support mechanisms 1 includes two support frames 10 for erecting on the ground, and the two support frames 10 in the same group are used to be symmetrically arranged on the front and back sides of the wall.
[0026] Reference Figure 2 , Figure 3 A mounting seat 2 is detachably installed horizontally between two adjacent support frames 10 on the same side of the wall, and a slide groove 20 extending in the horizontal direction is passed through the mounting seat 2. An adjusting member 21 is slidably arranged in the slide groove 20, and a plumb line 3 located outside the mounting seat 2 is arranged at one end of the adjusting member 21. The plumb line 3 includes a thin rope and a plumb bob fixedly hung at the lower end of the thin rope. A traction plate 22 extending downward to the outside of the mounting seat 2 is fixedly installed at the other end of the adjusting member 21, and the traction plate 22 is used for construction workers to hold.
[0027] like Figure 2 , Figure 3As shown, a slideway 24 is provided on the inner side wall of the mounting seat 2, and the length of the slideway 24 extends along the length direction of the slide slot 20. A roller 23 located in the slideway 24 is rotatably provided on the adjusting member 21, and the diameter of the roller 23 is greater than the width of the slide slot 20, so the roller 23 is limited in the slideway 24. The bottom of the roller 23 is placed on the bottom wall of the slideway 24, and the roller 23 is rotatably provided in the mounting seat 2 along the length direction of the slideway 24. The provision of the roller 23 can ensure that the adjusting member 21 on the mounting seat 2 slides more smoothly along the length direction of the slide slot 20.
[0028] like Figure 2 , Figure 3 As shown, a hook 30 is fixedly connected to the upper end of the plumb line 3 , a hanging ring 25 extending to the outside of the mounting seat 2 is fixedly installed on the adjusting member 21 , and the upper end of the plumb line 3 is suspended on the hanging ring 25 through the hook 30 .
[0029] like Figure 3 , Figure 4 As shown, the support mechanism 1 also includes a connecting frame 11, and a plurality of threaded holes 12 are penetrated on the connecting frame 11, and the threaded holes 12 are arranged in sequence along the length direction of the connecting frame 11. Two support frames 10 located on the same group of support mechanisms 1 are slidably sleeved on the outside of the same connecting frame 11 along the length direction of the connecting frame 11. Fasteners 110 are movably penetrated on the connecting frame 11. In this embodiment, the fasteners 110 are bolts, and the fasteners 110 are inserted and threadedly connected in the respective relative threaded holes 12. The support frame 10 is fixed at a designated position of the connecting frame 11 by the threaded connection between the fasteners 110 and the threaded holes 12. When the fasteners 110 are released from locking the support frame 10, the support frame 10 can be slid forward and backward along the length direction of the connecting frame 11. By adjusting the spacing between the two support frames 10 to an appropriate position, it can be better adapted to the construction of walls of different thicknesses, and the use is more flexible.
[0030] like Figure 3 , Figure 4 As shown, the side wall of the support frame 10 facing the wall is provided with mounting grooves 13, and the mounting grooves 13 are arranged in sequence along the length direction of the support frame 10. A limit baffle 4 is detachably mounted between two adjacent support frames 10 on the same side of the wall through the mounting grooves 13, and the length of the limit baffle 4 extends in the horizontal direction. The left and right ends of the limit baffle 4 are respectively inserted and limited in the respective opposite mounting grooves 13.
[0031] like Figure 3 , Figure 4As shown, an insertion rod 130 is fixedly installed on the bottom inner wall of the installation groove 13, and a plug hole 40 is passed through the limit baffle 4 for the respective opposite insertion rods 130 to be inserted from bottom to top into the limit baffle 4. A gap is left between the top wall of the insertion rod 130 and the top wall of the installation groove 13 for the limit baffle 4 to enter and exit the installation groove 13. By placing the limit baffle 4 into the installation groove 13 from the top gap of the installation groove 13, and then aligning the plug hole 40 with the lower insertion rod 130 and inserting it, the limit baffle 4 can be limited and fixed in the installation groove 13 through the mutual plug-in cooperation of the insertion rod 130 and the plug hole 40.
[0032] The implementation principle is: when the position of the plumb line 3 at a high place needs to be adjusted, the construction personnel only need to control the adjustment member 21 to slide along the length direction of the slide groove 20 by holding the traction plate 22, and the plumb line 3 can move synchronously with the adjustment member 21. By moving the plumb line 3 to the specified position, the subsequent construction can be smoothly carried out, and the whole adjustment process is convenient, fast and flexible to use.
[0033] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A wall-building auxiliary device for building construction, characterized in that: The invention comprises a plurality of groups of support mechanisms (1), wherein the support mechanisms (1) are symmetrically arranged on the left and right sides of a wall; the support mechanisms (1) comprise support frames (10) for being erected on the ground, wherein the support frames (10) in the same group are symmetrically arranged on the front and rear sides of the wall; a mounting seat (2) is horizontally arranged between adjacent support frames (10) on the same side of the wall, wherein a slide groove (20) extending in a horizontal direction is passed through the mounting seat (2), wherein an adjusting member (21) is slidably arranged in the slide groove (20), wherein one end of the adjusting member (21) is provided with a plumb line (3), and the other end of the adjusting member (21) is provided with a traction plate (22) extending downwardly, wherein the traction plate (22) is used for being held by construction personnel.
2. The wall-building auxiliary device for building construction according to claim 1 is characterized in that: A roller (23) is rotatably arranged on the adjusting member (21), the bottom of the roller (23) is placed in the mounting seat (2), and the roller (23) is rotatably arranged in the mounting seat (2) along the length direction of the slide groove (20).
3. The wall-building auxiliary device for building construction according to claim 2 is characterized in that: The diameter of the roller (23) is greater than the width of the slide groove (20); a slideway (24) is provided on the inner side wall of the mounting seat (2); the length of the slideway (24) extends along the length direction of the slide groove (20); and the roller (23) is limited in the slideway (24).
4. The wall-building auxiliary device for building construction according to claim 3 is characterized in that: A hook (30) is provided at one end of the plumb line (3), a hanging ring (25) is provided on the adjusting member (21), and the plumb line (3) is hung on the hanging ring (25) via the hook (30).
5. The wall-building auxiliary device for building construction according to claim 1 is characterized in that: The support mechanism (1) further comprises a connecting frame (11), the connecting frame (11) having a plurality of threaded holes (12) extending therethrough, the threaded holes (12) being arranged in sequence and spaced apart along the length direction of the connecting frame (11); the supporting frame (10) located on the same group of the support mechanisms (1) is slidably sleeved on the outside of the connecting frame (11) along the length direction of the connecting frame (11); the connecting frame (11) is provided with a fastener (110), the fastener (110) being used to be inserted into and threadedly connected to the threaded hole (12).
6. The wall-building auxiliary device for building construction according to claim 1 is characterized in that: The support frame (10) is provided with a mounting groove (13) on the side wall facing the wall, and the mounting grooves (13) are arranged in sequence and at intervals along the length direction of the support frame (10); a limit baffle (4) is detachably mounted between adjacent support frames (10) located on the same side of the wall through the mounting groove (13), and the two ends of the limit baffle (4) are respectively inserted into and limited in the respective opposite mounting grooves (13).
7. The wall-building auxiliary device for building construction according to claim 6 is characterized in that: An insertion rod (130) is provided on the inner side wall of the installation groove (13), and an insertion hole (40) for inserting the insertion rod (130) is formed through the limit baffle (4).