Water conservancy construction pipeline and water conservancy construction steel structure

By adopting lifting mechanism and fixed structure in water conservancy construction, the problems of inaccurate and unstable pipeline installation height in the prior art are solved, and accurate adjustment and fixation of pipeline height is achieved, manpower and material resources are saved, and installation stability is improved. Recycling rate.

CN222277678UInactive Publication Date: 2024-12-31GANSU SANWEI HYDROPOWER ENGINEERING CONSTRUCTION SUPERVISION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420974069.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-08
Publication Date
2024-12-31
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the installation of existing water conservancy construction pipelines, the height is inaccurate, the manpower and material resources are wasted, and the fixing method is not solid, which can easily lead to the pipe falling off and damage.

Method used

A water conservancy construction steel structure is designed, including base, motor, lifting mechanism, transverse transmission gear, vertical transmission gear, support steel plate, lifting plate and fixed structure. The precise adjustment of pipeline height is achieved through the cooperation of the lifting mechanism and lifting plate. Fix it to prevent the pipe from falling off.

Benefits of technology

It realizes accurate adjustment and fixation of pipeline height, saves manpower and material resources, improves the stability and recycling rate of pipeline installation, and avoids pipeline damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222277678U_ABST
    Figure CN222277678U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy projects, and discloses a water conservancy construction pipeline water conservancy construction steel structure which comprises a base and a motor installed above one side of the base, and further comprises output shafts installed on the two sides of the motor, lifting mechanisms are arranged on the two sides of each output shaft, transverse transmission gears are installed above the periphery of the base, and the transverse transmission gears are connected with the lifting mechanisms. One side of the transverse transmission gear is engaged with a vertical transmission gear; through cooperation of the lifting mechanism and the lifting plate, pipelines can be supported, the height of the pipelines can be adjusted according to the needed height, the pipelines can be accurately located at the same height, connection of the pipelines is facilitated, the pipelines can be separated from the pipelines after being installed, the pipelines which are not installed are supported and recycled, a large amount of manpower and material resources are saved, and the working efficiency is improved. And through cooperation of the fixing structure and the fixing plate, the pipeline can be fixed, and the situation that in the pipeline connecting process, due to movement, the pipeline falls off, and the pipeline is damaged is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy projects, in particular to a water conservancy construction pipeline and a water conservancy construction steel structure. Background Art

[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. Water resources are indispensable to human production and life, but their natural state does not fully meet human needs. Water conservancy projects are needed to regulate water resources to meet people's production and living water needs. The installation of pipelines is essential for the construction of water conservancy projects.

[0003] Pipeline installation has requirements for the height of pipeline installation. At present, the height is raised by manually using wood under the pipeline. This is not only inaccurate, but also easily causes different heights of the pipelines. The back-and-forth adjustment wastes a lot of manpower and material resources. The wood will be damaged during use and has a low recycling rate. In addition, the existing fixing method is through wooden boards, which are not strong enough and easily cause the pipeline to fall off and cause damage to the pipeline. Utility Model Content

[0004] The utility model aims to provide a hydraulic construction pipeline hydraulic construction steel structure to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above purpose, the utility model provides the following technical solutions: a hydraulic construction pipeline hydraulic construction steel structure, including a base and a motor installed on one side thereof, and also including:

[0006] Output shafts are installed on both sides of the motor, and lifting mechanisms are provided on both sides of the output shafts. Horizontal transmission gears are installed above the four sides of the base, and one side of the horizontal transmission gear is meshed with a vertical transmission gear;

[0007] A transmission shaft installed on one side of the vertical transmission gear, support steel plates are fixed on both sides of the base, and the transmission shaft penetrates the support steel plate and is rotatably connected to the inner wall of the penetration point;

[0008] A protective plate is installed around the base, a lifting plate is installed above the base, and sliding grooves are opened on both sides of the lifting plate, and a slider is slidably connected inside the sliding groove;

[0009] A connecting block is fixed above the sliding block, a fixing plate is fixed above the connecting block, a supporting plate is fixed below the fixing plate, a fixing structure is arranged above the lifting plate, and a supporting block is installed above the lifting plate.

[0010] Preferably, the lifting mechanism includes a vertical bevel gear, one side of the vertical bevel gear is fixedly connected to the output shaft, one side of the vertical bevel gear is meshed with a transverse bevel gear, a vertical threaded rod is fixed in the middle of the transverse bevel gear, the vertical threaded rod is fixedly connected to the transverse transmission gear, the middle part of the vertical threaded rod is threadedly connected to a vertical sleeve, and the vertical sleeve is bolted to the lifting plate.

[0011] Preferably, the fixing structure comprises a handle, a bidirectional threaded rod is installed on one side of the handle, transverse sleeves are installed on both sides of the bidirectional threaded rod, and the transverse sleeves are fixedly connected to the support plate.

[0012] Preferably, the protection plate is L-shaped and is made of steel.

[0013] Preferably, the surface of the slider is slidably connected to the inner wall of the slide groove, the slider is T-shaped, and the shape of the inner wall of the slide groove is the same as that of the slider.

[0014] Preferably, the support block is located in the middle part of the bidirectional threaded rod, and the threads on the surface of the bidirectional threaded rod are symmetrically designed with the support block as the center.

[0015] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0016] The utility model can support the pipeline through the cooperation of the lifting mechanism and the lifting plate, and the height of the pipeline can be adjusted according to the required height, so that the pipelines can be accurately placed at the same height, which is convenient for the connection of the pipelines. After the pipelines are installed, they can be detached from the pipelines to support the pipelines that are not installed, and they can be recycled, saving a lot of manpower and material resources. The pipelines can be fixed through the cooperation of the fixing structure and the fixing plate, avoiding the situation where the pipelines fall off due to movement during the pipeline connection process, causing damage to the pipelines. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0018] Figure 2 It is a schematic diagram of a partial three-dimensional structure in the utility model;

[0019] Figure 3 It is a schematic diagram of a partial three-dimensional structure in the utility model;

[0020] Figure 4 It is a schematic diagram of the cross-sectional three-dimensional structure of the lifting plate in the utility model.

[0021] In the figure: 1. base; 2. motor; 3. output shaft; 4. lifting mechanism; 41. vertical bevel gear; 42. transverse bevel gear; 43. vertical threaded rod; 44. vertical sleeve; 5. transverse transmission gear; 6. vertical transmission gear; 7. transmission shaft; 8. support steel plate; 9. protection plate; 10. lifting plate; 11. slide groove; 12. slider; 13. connecting block; 14. fixing plate; 15. support plate; 16. fixing structure; 161. handle; 162. two-way threaded rod; 163. transverse sleeve; 17. support block. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-4 As shown, a steel structure for water conservancy construction pipelines includes a base 1, a motor 2 is installed above one side of the base 1, output shafts 3 are installed on both sides of the motor 2, and lifting mechanisms 4 are arranged on both sides of the output shaft 3. Horizontal transmission gears 5 are installed above the four sides of the base 1, and a vertical transmission gear 6 is meshed on one side of the horizontal transmission gear 5. A transmission shaft 7 is installed on one side of the vertical transmission gear 6. Support steel plates 8 are fixed on both sides of the base 1. The transmission shaft 7 penetrates the support steel plate 8 and is rotatably connected to the inner wall of the penetration point. Under this action, the transmission shaft 7 can be supported. The base 1 Protective plates 9 are installed all around, a lifting plate 10 is installed above the base 1, and slide grooves 11 are provided on both sides of the lifting plate 10. A slider 12 is slidably connected inside the slide groove 11, and is limited under this action to prevent a large position shift during movement. A connecting block 13 is fixed above the slider 12, and a fixing plate 14 is fixed above the connecting block 13. Under this action, the fixing plate 14 is supported to prevent it from falling off, a supporting plate 15 is fixed below the fixing plate 14, a fixing structure 16 is provided above the lifting plate 10, and a supporting block 17 is installed above the lifting plate 10.

[0024] The lifting mechanism 4 includes a vertical bevel gear 41, one side of the vertical bevel gear 41 is fixedly connected to the output shaft 3, one side of the vertical bevel gear 41 is meshed with a transverse bevel gear 42, a vertical threaded rod 43 is fixed in the middle of the transverse bevel gear 42, the vertical threaded rod 43 is fixedly connected to the transverse transmission gear 5, the middle part of the vertical threaded rod 43 is threadedly connected with a vertical sleeve 44, and the vertical sleeve 44 is bolted to the lifting plate 10, under this action, the motor 2 is started, and the output shaft 3 is driven to rotate under the action of the motor 2, and the vertical bevel gear 41 is driven to rotate under the action of the output shaft 3, and the transverse bevel gear 42 is driven to rotate under the action of the vertical bevel gear 41, and the vertical threaded rod 43 is driven to rotate under the action of the transverse bevel gear 42, and the vertical sleeve 44 is driven to move up and down under the action of the vertical threaded rod 43, and the lifting plate 10 is driven up and down under the action of the vertical sleeve 44 to support the pipeline to be installed.

[0025] The fixing structure 16 includes a handle 161, a bidirectional threaded rod 162 is installed on one side of the handle 161, and transverse sleeves 163 are installed on both sides of the bidirectional threaded rod 162. The transverse sleeve 163 is fixedly connected to the support plate 15, and the support block 17 is located in the middle of the bidirectional threaded rod 162. Under this action, the bidirectional threaded rod 162 is supported. Under this action, the handle 161 is rotated, and the bidirectional threaded rod 162 is driven to rotate under the action of the handle 161. The transverse sleeve 163 is driven to move relatively under the action of the bidirectional threaded rod 162. The support plate 15 is driven to move under the action of the transverse sleeve 163. The fixed plate 14 is driven to move under the action of the support plate 15. Under this action, the pipeline is fixed to prevent the position from shifting during installation.

[0026] Working principle: when it is necessary to install the pipeline, start the motor 2, and the output shaft 3 is driven to rotate under the action of the motor 2, and the vertical bevel gear 41 is driven to rotate under the action of the output shaft 3, and the horizontal bevel gear 42 is driven to rotate under the action of the vertical bevel gear 41, and the vertical threaded rod 43 is driven to rotate under the action of the horizontal bevel gear 42, and the horizontal transmission gear 5 is driven to rotate under the action of the vertical threaded rod 43, and the vertical transmission gear 6 is driven to rotate under the action of the horizontal transmission gear 5, and the transmission shaft 7 is driven to rotate under the action of the vertical transmission gear 6, and the vertical threaded rods 43 around are driven to rotate under this action. , the vertical sleeve 44 is driven to move up and down under the action of the vertical threaded rod 43, and the lifting plate 10 is driven to move up and down under the action of the vertical sleeve 44 to support the pipe to be installed. When the pipe needs to be fixed, the handle 161 is turned, and the bidirectional threaded rod 162 is driven to rotate under the action of the handle 161, and the transverse sleeve 163 is driven to move relatively under the action of the bidirectional threaded rod 162, and the support plate 15 is driven to move under the action of the transverse sleeve 163, and the fixing plate 14 is driven to move under the action of the support plate 15. Under this action, the pipe is fixed to prevent the position from shifting during installation.

[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A hydraulic construction pipeline hydraulic construction steel structure, comprising a base (1) and a motor (2) installed above one side thereof, characterized in that: Also includes: Output shafts (3) are installed on both sides of the motor (2), and lifting mechanisms (4) are provided on both sides of the output shafts (3). Transverse transmission gears (5) are installed above the four sides of the base (1), and one side of the transverse transmission gear (5) is meshed with a vertical transmission gear (6); A transmission shaft (7) is installed on one side of the vertical transmission gear (6), and support steel plates (8) are fixed on both sides of the base (1). The transmission shaft (7) passes through the support steel plate (8) and is rotatably connected to the inner wall of the passing point; A protective plate (9) is installed around the base (1), a lifting plate (10) is installed above the base (1), both sides of the lifting plate (10) are provided with a slide groove (11), and a slider (12) is slidably connected inside the slide groove (11); A connecting block (13) is fixed above the slider (12), a fixing plate (14) is fixed above the connecting block (13), a supporting plate (15) is fixed below the fixing plate (14), a fixing structure (16) is arranged above the lifting plate (10), and a supporting block (17) is installed above the lifting plate (10).

2. A hydraulic construction pipeline hydraulic construction steel structure according to claim 1, characterized in that: The lifting mechanism (4) comprises a vertical bevel gear (41), one side of the vertical bevel gear (41) is fixedly connected to the output shaft (3), one side of the vertical bevel gear (41) is meshed with a transverse bevel gear (42), a vertical threaded rod (43) is fixed in the middle of the transverse bevel gear (42), the vertical threaded rod (43) is fixedly connected to the transverse transmission gear (5), a middle part of the vertical threaded rod (43) is threadedly connected to a vertical sleeve (44), and the vertical sleeve (44) is bolted to the lifting plate (10).

3. A hydraulic construction pipeline hydraulic construction steel structure according to claim 1, characterized in that: The fixing structure (16) comprises a handle (161), a bidirectional threaded rod (162) is installed on one side of the handle (161), transverse sleeves (163) are installed on both sides of the bidirectional threaded rod (162), and the transverse sleeves (163) are fixedly connected to the support plate (15).

4. A hydraulic construction pipeline hydraulic construction steel structure according to claim 1, characterized in that: The protection plate (9) is L-shaped and made of steel.

5. The hydraulic construction pipeline hydraulic construction steel structure according to claim 1 is characterized by: The surface of the slider (12) is slidably connected to the inner wall of the slide groove (11); the slider (12) is T-shaped, and the shape of the inner wall of the slide groove (11) is the same as that of the slider (12).

6. A hydraulic construction pipeline hydraulic construction steel structure according to claim 3, characterized in that: The support block (17) is located in the middle part of the bidirectional threaded rod (162), and the threads on the surface of the bidirectional threaded rod (162) are symmetrically designed with the support block (17) as the center.