Heat energy and pure water recycling system

By designing a thermal energy and pure water recycling system, the problem of high-temperature condensate waste is solved, the water source and heat recycling is realized, and the system safety is ensured through real-time monitoring and warning systems.

CN222298598UActive Publication Date: 2025-01-03ANHUI YUNYAN FOOD TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421156756.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-25
Publication Date
2025-01-03
Estimated Expiration
2034-05-25

AI Technical Summary

Technical Problem

In the prior art, the high-temperature condensate generated by the gas storage tank is discharged directly into the trench, resulting in waste of water and heat.

Method used

A thermal energy and pure water recycling system was designed to realize the recycling and heat exchange of high-temperature condensate water through the combination of gas storage tank, connecting pipe, OPC water tank and pure water tank, and use the combination of detection tube and electrode sheet for real-time use. Airtightness monitoring, timely warning and maintenance.

Benefits of technology

It effectively reduces the waste of water sources and heat, realizes the recycling and utilization of high-temperature condensate, and ensures the safety and reliability of the system through real-time monitoring and warning systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222298598U_ABST
    Figure CN222298598U_ABST
Patent Text Reader

Abstract

The utility model discloses a heat energy and pure water recycling system, and belongs to the technical field of heat energy recovery, the heat energy and pure water recycling system comprises a first gas storage tank, a second gas storage tank, a third gas storage tank and a trench, the outer edges of the first gas storage tank, the second gas storage tank and the third gas storage tank are fixedly connected with gas pipes; the ends, away from the first air storage tank, the second air storage tank and the third air storage tank, of the air pipes are fixedly connected with the connecting pipe, the outer edge of the connecting pipe is fixedly connected with a guide pipe, the end, away from the connecting pipe, of the guide pipe is fixedly connected with an OPC water tank, the outer edge of the guide pipe is fixedly provided with a second valve, and the outer edge of the connecting pipe is fixedly provided with a third valve. High-temperature condensate water generated by the first gas storage tank, the second gas storage tank and the third gas storage tank is introduced into the pure water tank to be recycled, and waste of water sources is reduced; and in the process that the high-temperature condensate water is introduced into the pure water tank, a guide pipe of the high-temperature condensate water is soaked in the OPC water tank and exchanges heat with cold water in the OPC water tank, so that heat waste is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of heat energy recovery technology, and in particular to a heat energy and pure water recovery and utilization system. Background Art

[0002] With the advancement of science and technology and the development of society, people's lives have also undergone tremendous changes. Pure water needs to be recycled after actual use to reduce energy loss.

[0003] In the prior art, the high-temperature condensed water produced by the three gas storage tanks is directly discharged into the ditch, wasting water resources and heat. Therefore, the present application proposes a heat energy and pure water recycling system to solve the above problem. Utility Model Content

[0004] In view of the deficiencies of the prior art, the present application provides a heat energy and pure water recovery and utilization system, which overcomes the deficiencies of the prior art and aims to solve the problems in the prior art.

[0005] To achieve the above-mentioned objectives, the present application provides the following technical solutions: a heat energy and pure water recovery and utilization system, comprising a gas tank one, a gas tank two, a gas tank three and a ditch, the outer edges of the gas tank one, the gas tank two and the gas tank three are all fixedly connected with an air pipe, the ends of the air pipes away from the gas tank one, the gas tank two and the gas tank three are all fixedly connected to the connecting pipe, the outer edge of the connecting pipe is fixedly connected with a conduit, the end of the conduit away from the connecting pipe is fixedly connected with an OPC water tank, the outer edge of the conduit is fixedly equipped with a valve two, the outer edge of the connecting pipe is fixedly equipped with a valve three, the outer edge of the OPC water tank is fixedly connected with one end of a water pipe, the other end of the water pipe is fixedly connected with a pure water tank, the outer edge of the connecting pipe is fixedly equipped with a detection tube, the top of the detection tube is fixedly equipped with a warning light, the inner wall of the detection tube is fixedly equipped with a positioning plate, the bottom of the positioning plate is fixedly equipped with an electrode sheet one, the inner wall of the detection tube is fixedly equipped with a tympanic membrane, and the outer edge of the tympanic membrane is fixedly equipped with an electrode sheet two.

[0006] As a preferred technical solution of the present application, valves 1 are fixedly installed on the outer edges of the air pipes, and the three valves 1 are in a normally open state.

[0007] By adopting the above technical solution, the gas on the inner walls of gas tank one, gas tank two and gas tank three can be controlled to be discharged to the inner wall position of the connecting pipe through the air pipe, ensuring that they can be sealed and opened in time.

[0008] As a preferred technical solution of the present application, one end of the connecting pipe away from the three air pipes is arranged above the trench.

[0009] By adopting the above technical solution, after opening valve three, the high-temperature condensed water on the inner wall of the connecting pipe can be discharged to the inner wall of the ditch.

[0010] As a preferred technical solution of the present application, the electrode sheet 1 and the electrode sheet 2 are fitted to each other, the outer edge of the eardrum is firmly connected to the inner side of the detection tube, and the middle position of the eardrum is elastic.

[0011] By adopting the above-mentioned technical solution, the gas on the inner wall of the connecting tube will enter the inner cavity of the detection tube during normal circulation, thereby giving pressure to the eardrum to push the electrode piece 2 to contact the electrode piece 1, thereby monitoring the air tightness of the inner wall of the connecting tube in real time. When a leak occurs, the pressure inside the connecting tube is not enough to push the eardrum to drive the electrode piece 2 to move and contact the electrode piece 1.

[0012] As a preferred technical solution of the present application, a controller is fixedly mounted on the outer edge of the gas storage tank 1, and the warning light, the controller, the electrode sheet 2 and the electrode sheet 1 are all electrically connected.

[0013] By adopting the above technical solution, when the electrode sheet 2 and the electrode sheet 1 are not in contact, a signal will be transmitted to the controller, and the controller will control the warning light to flash, thereby alerting the staff to inspect and maintain the connecting pipe in time.

[0014] As a preferred technical solution of the present application, the outer edge of the gas storage tank three is fixedly connected to one end of a circular tube, and the other end of the circular tube is fixedly connected to the workshop, the outer edge of the gas storage tank one is also fixedly connected to one end of a circular tube, and the other end of the circular tube is fixedly connected to the boiler, and the gas storage tanks one, two and three are fixedly connected via circular tubes.

[0015] By adopting the above technical solution, the gas during boiler operation can be discharged to the inner cavity of gas storage tank 1, and then discharged to the workshop through gas storage tank 3 for use in workshop production.

[0016] Beneficial effects of this application:

[0017] 1. The high-temperature condensed water generated by gas tank 1, gas tank 2 and gas tank 3 is recycled into the pure water tank to reduce water waste; and in the process of high-temperature condensed water passing into the pure water tank, the conduit of the high-temperature condensed water is immersed in the OPC water tank to exchange heat with the cold water in the OPC water tank to reduce heat waste.

[0018] 2. The gas through the inner wall of the connecting tube flows normally into the inner cavity of the detection tube, which can then give pressure to the eardrum to push the electrode piece 2 to contact the electrode piece 1, so as to monitor the air tightness of the inner wall of the connecting tube in real time. When a leak occurs, the pressure inside the connecting tube is not enough to push the eardrum to drive the electrode piece 2 to move and contact the electrode piece 1, so that when the electrode piece 2 and the electrode piece 1 are not in contact, a signal will be transmitted to the controller. At this time, the controller will control the warning light to flash, thereby alerting the staff to inspect and maintain the connecting tube in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the overall structure of this application;

[0020] Figure 2 It is a schematic diagram of the local structure of this application;

[0021] Figure 3 This is a schematic diagram of the cross-sectional structure of the detection tube of the present application;

[0022] Figure 4 For this application Figure 3 Enlarged structural diagram at A in the middle.

[0023] In the figure: 1. Gas tank one; 2. Gas tank two; 3. Gas tank three; 4. Air pipe; 5. Valve one; 6. Connecting pipe; 7. Conduit; 8. OPC water tank; 9. Valve two; 10. Valve three; 11. Ditch; 12. Water pipe; 13. Pure water tank; 14. Detection tube; 15. Warning light; 16. Positioning plate; 17. Electrode one; 18. Tympanic membrane; 19. Electrode two. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0025] Reference Figure 1-4A heat energy and pure water recycling system comprises a gas storage tank 1, a gas storage tank 2, a gas storage tank 3 and a trench 11. The outer edges of the gas storage tanks 1, 2 and 3 are fixedly connected with air pipes 4. The ends of the air pipes 4 away from the gas storage tanks 1, 2 and 3 are fixedly connected with connecting pipes 6. The outer edge of the connecting pipe 6 is fixedly connected with a conduit 7. The end of the conduit 7 away from the connecting pipe 6 is fixedly connected with an OPC water tank 8. The outer edge of the conduit 7 is fixedly equipped with a valve 2 9. The connecting pipe The outer edge of 6 is fixedly equipped with a valve three 10, the outer edge of the OPC water tank 8 is fixedly connected to one end of a water pipe 12, the other end of the water pipe 12 is fixedly connected to a pure water tank 13, the outer edge of the connecting pipe 6 is fixedly equipped with a detection tube 14, the top of the detection tube 14 is fixedly equipped with a warning light 15, the inner wall of the detection tube 14 is fixedly equipped with a positioning plate 16, the bottom of the positioning plate 16 is fixedly equipped with an electrode piece one 17, the inner wall of the detection tube 14 is fixedly equipped with a tympanic membrane 18, and the outer edge of the tympanic membrane 18 is fixedly equipped with an electrode piece two 19.

[0026] Reference Figure 1 The outer edge of the air pipe 4 is fixedly equipped with a valve 5, and the three valves 5 are in a normally open state, so that the gas on the inner wall of the gas storage tank 1, the gas storage tank 2 and the gas storage tank 3 can be controlled to be discharged to the inner wall position of the connecting pipe 6 through the air pipe 4, ensuring that it can be sealed and opened in time.

[0027] Reference Figure 2 One end of the connecting pipe 6 away from the three air pipes 4 is arranged above the trench 11, so that after the valve three 10 is opened, the high-temperature condensed water on the inner wall of the connecting pipe 6 is discharged to the inner wall position of the trench 11.

[0028] Reference Figure 4 The electrode piece 1 17 and the electrode piece 2 19 fit each other, the outer edge of the eardrum 18 is firmly connected to the inner side of the detection tube 14, and the middle position of the eardrum 18 is elastic, so that the gas on the inner wall of the connecting tube 6 can enter the inner cavity of the detection tube 14 when it circulates normally, and then the eardrum 18 can be given pressure to push the electrode piece 2 19 to contact the electrode piece 1 17, so as to monitor the air tightness of the inner wall of the connecting tube 6 in real time. When a leak occurs, the pressure inside the connecting tube 6 is not enough to push the eardrum 18 to drive the electrode piece 2 19 to move and contact the electrode piece 1 17.

[0029] Reference Figure 4 A controller is fixedly mounted on the outer edge of the gas storage tank 1, and the warning light 15, the controller, the electrode sheet 2 19 and the electrode sheet 1 17 are all electrically connected, so that when the electrode sheet 2 19 and the electrode sheet 1 17 are not in contact, a signal will be transmitted to the controller. At this time, the controller will control the warning light 15 to flash, thereby alerting the staff to promptly inspect and maintain the connecting pipe 6.

[0030] Reference Figure 1and Figure 2 The outer edge of the gas tank three 3 is fixedly connected to one end of a circular tube, and the other end of the circular tube is fixedly connected to the workshop. The outer edge of the gas tank one 1 is also fixedly connected to one end of a circular tube, and the other end of the circular tube is fixedly connected to the boiler. The gas tank one 1, the gas tank two 2 and the gas tank three 3 are fixedly connected by circular tubes, so that the gas during boiler operation can be discharged to the inner cavity position of the gas tank one 1, and then discharged to the workshop through the gas tank three 3 for use in workshop production.

[0031] Working principle: When using the device, the high-temperature condensed water generated by the gas tank 1, the gas tank 2 and the gas tank 3 is recycled into the pure water tank 13 to reduce water waste; and in the process of the high-temperature condensed water being passed into the pure water tank 13, the high-temperature condensed water conduit 7 is immersed in the OPC water tank 8, and heat is exchanged with the cold water in the OPC water tank 13 to reduce heat waste. At the same time, the valve 1 and the valve 3 can be closed, so that the connecting pipe 6 is not in a passage state. At this time, the water on the inner wall of the connecting pipe 6 will enter the detection The inner cavity position of the tube 14 can give pressure to the eardrum 18 to push the electrode piece 2 19 to contact the electrode piece 1 17, so as to monitor the air tightness of the inner wall of the connecting tube 6 in real time. When a leak occurs, the pressure inside the connecting tube 6 is not enough to push the eardrum 18 to drive the electrode piece 2 19 to move and contact the electrode piece 1 17, so that when the electrode piece 2 19 and the electrode piece 1 17 are not in contact, a signal will be transmitted to the controller. At this time, the controller will control the warning light 15 to flash, thereby alerting the staff to promptly inspect and maintain the connecting tube 6.

[0032] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. Although the present application is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.

Claims

1. A heat energy and pure water recovery and utilization system, comprising a gas storage tank 1 (1), a gas storage tank 2 (2), a gas storage tank 3 (3) and a trench (11), characterized in that: The outer edges of the gas storage tank 1 (1), the gas storage tank 2 (2) and the gas storage tank 3 (3) are all fixedly connected to the gas pipe (4); the ends of the gas pipe (4) away from the gas storage tank 1 (1), the gas storage tank 2 (2) and the gas storage tank 3 (3) are all fixedly connected to the connecting pipe (6); the outer edge of the connecting pipe (6) is fixedly connected to the conduit (7); the end of the conduit (7) away from the connecting pipe (6) is fixedly connected to the OPC water tank (8); the outer edge of the conduit (7) is fixedly equipped with the valve 2 (9); the outer edge of the connecting pipe (6) is fixedly equipped with the valve 3 (10); the OPC The outer edge of the water tank (8) is fixedly connected to one end of a water pipe (12), the other end of the water pipe (12) is fixedly connected to a pure water tank (13), the outer edge of the connecting pipe (6) is fixedly equipped with a detection tube (14), the top of the detection tube (14) is fixedly equipped with a warning light (15), the inner wall of the detection tube (14) is fixedly equipped with a positioning plate (16), the bottom of the positioning plate (16) is fixedly equipped with an electrode sheet 1 (17), the inner wall of the detection tube (14) is fixedly equipped with an eardrum (18), and the outer edge of the eardrum (18) is fixedly equipped with an electrode sheet 2 (19).

2. A heat energy and pure water recycling system according to claim 1, characterized in that: The outer edges of the air pipes (4) are all fixedly equipped with valves one (5), and the three valves one (5) are in a normally open state.

3. A heat energy and pure water recycling system according to claim 1, characterized in that: One end of the connecting pipe (6) away from the three air pipes (4) is arranged above the trench (11).

4. A heat energy and pure water recycling system according to claim 1, characterized in that: The electrode sheet 1 (17) and the electrode sheet 2 (19) are in contact with each other, the outer edge of the eardrum (18) is firmly connected to the inner side of the detection tube (14), and the middle position of the eardrum (18) is elastic.

5. A heat energy and pure water recycling system according to claim 1, characterized in that: A controller is fixedly mounted on the outer edge of the gas storage tank 1 (1), and the warning light (15), the controller, the electrode sheet 2 (19) and the electrode sheet 1 (17) are all electrically connected.

6. A heat energy and pure water recycling system according to claim 1, characterized in that: The outer edge of the gas storage tank three (3) is fixedly connected to one end of a circular tube, and the other end of the circular tube is fixedly connected to the workshop. The outer edge of the gas storage tank one (1) is also fixedly connected to one end of a circular tube, and the other end of the circular tube is fixedly connected to the boiler. The gas storage tank one (1), the gas storage tank two (2) and the gas storage tank three (3) are fixedly connected via circular tubes.