Gateway equipment with cable collecting function
By introducing a harvesting bin and elastic connection block system into the gateway equipment, the cable winding and management problems of gateway equipment are solved, and the automatic cable collection and fixation is realized, the installation and maintenance process is simplified, and efficiency is improved.
Patent Information
- Application Number
- CN202421170240.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-05-27
AI Technical Summary
In a data center or server room, the port connection lines of multiple gateway devices are easily wrapped around the narrow cabinet, making it difficult to distinguish and maintain, resulting in difficulty in installation and replacement.
A gateway device with cable bundling function was designed, using a detachable bundling bin and elastic connecting block system. By controlling the coordination of the tie rod and spring, the cable is automatically bundled and fixed, simplifying cable management. and installation and removal of gateway components.
It effectively reduces the complexity of cable winding, simplifies cable management and maintenance, improves installation and maintenance efficiency, and reduces work burden.
Smart Images

Figure CN222320745U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of gateway devices, and more specifically, to a gateway device with a cable bundling function. Background Art
[0002] A gateway device refers to an interface device between two networks with different communication protocols, or an interface device between two networks with the same communication protocol. It acts as a bridge between networks, making communication between different networks more convenient and efficient.
[0003] At present, in scenarios such as data centers or server rooms where multiple gateway devices need to be centrally managed, in order to ensure the confidentiality of data during transmission, it is usually necessary to use gateway devices to encrypt the data, and multiple gateway devices will be centrally installed in a cabinet or rack for easy management. Among them, multiple groups of gateway devices need to connect multiple groups of ports before operation, and the internal space of the cabinet is small. The connection cables of multiple groups of ports will be entangled with each other in the narrow box, making it difficult to distinguish. As a result, when maintaining the ports of the gateway device or replacing the cables, the connection cables are difficult to remove smoothly, making the work more difficult, so it needs to be improved and optimized. Utility Model Content
[0004] In order to overcome the deficiencies of the prior art, the present application provides a gateway device with a cable bundling function, which has the advantages of being dustproof and anti-falling.
[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a gateway device with a cable bundling function, comprising a body shell, a gateway component is detachably installed inside the body shell, a support foot is fixedly provided at the bottom of the body shell, and heat dissipation ports are fixedly provided on the left and right sides of the body shell;
[0006] A collecting bin is fixedly installed on the back of the shell, a fixed cylinder is fixedly installed inside one end of the collecting bin, a collecting ring is fixedly installed inside the fixed cylinder, four groups of pressing blocks are rotatably connected to one side of the collecting ring close to the port of the collecting bin, and the other ends of the four groups of pressing blocks are rotatably connected to connecting blocks respectively, the four groups of connecting blocks are fixedly installed on one side of the rotating ring, the rotating ring is rotatably installed inside the fixed cylinder, and four groups of first fixed blocks are fixedly installed on the other side of the rotating ring;
[0007] An inlet ring is fixedly installed on the outer wall of one end of the collecting bin, and an annular groove is arranged on the inner wall of the inlet ring. Four groups of second fixed blocks are fixedly arranged in the annular groove, and the four groups of second fixed blocks are distributed in a circle. The first fixed blocks and the second fixed blocks correspond to each other one by one and are elastically connected by a first spring. A control pull rod is fixedly connected to one of the first fixed blocks, and one end of the control pull rod passes through the inlet ring and extends to the outside of the inlet ring.
[0008] As a preferred technical solution of the present application, a fixed shell is fixedly installed on both the left and right sides of the body shell, and the fixed shell is connected to the body shell;
[0009] A mounting head is movably installed inside the fixed shell, one end of the mounting head is located inside the body shell and is tilted toward the inside of the body shell, the other end of the mounting head penetrates the outer wall of the fixed shell and is fixedly connected to the connecting rod, and the mounting head and the inner wall of the fixed shell are elastically connected by a second spring;
[0010] The left and right side walls of the gateway assembly are provided with grooves matching the mounting head.
[0011] As a preferred technical solution of the present application, the shape of the horizontal cross-section of the mounting head is a right-angled trapezoid, and the right-angled waist of the mounting head is fixedly connected to the connecting rod.
[0012] As a preferred technical solution of the present application, a rotating door is rotatably provided on the bunker.
[0013] As a preferred technical solution of the present application, a first magnetic block is fixedly installed above the left and right inner walls of the collection bin near the rotating door, and a second magnetic block is fixedly installed on the left and right sides of the inner wall of the rotating door, and the first magnetic block and the second magnetic block attract each other.
[0014] As a preferred technical solution of the present application, a buffer pad is provided at the bottom of each of the supporting legs.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] 1. The present application drives the rotating ring to rotate through the first fixed block by pulling the control rod. When the rotating ring rotates, the connecting block rotates, and the rotation of the connecting block will open the four groups of pressure blocks outward, making it easier for the cables to enter the interior of the bundling bin. After the cables are installed, the elastic potential energy of the first spring will reset the rotating ring, and the four groups of pressure blocks will clamp the cables. Compared with the traditional device, the device collects the cables into the bundling bin, wherein the excess length of the cables can be collected into the bundling bin, so that the length of the cables outside the bundling bin just meets the connection requirements, thereby reducing the winding complexity of the cables outside the bundling bin and making it easier to distinguish. In addition, by setting the pressure block and the first spring, the connected cables are bundled and fixed, which reduces the difficulty of cable distribution and reduces the workload.
[0017] 2. The present application squeezes the gateway component so that the installation head is stored inside the fixed shell, and then uses the elastic potential energy provided by the second spring to enable the installation head to install the gateway component. Compared with traditional devices, the device uses the setting of the installation head so that the gateway component can be firmly installed by just pushing it, which effectively improves the installation efficiency. The gateway component is also quick to disassemble, effectively improving the maintenance efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0019] Figure 1 This is a schematic diagram of the structure of this application;
[0020] Figure 2 This is a schematic diagram of the back structure of this application;
[0021] Figure 3 This is a schematic diagram of the fixed cylinder structure of this application;
[0022] Figure 4 This is a schematic diagram of the connection structure between the bundling compartment and the rotating door of this application;
[0023] Figure 5 This is a schematic diagram of the partial internal structure of the bunker in this application;
[0024] Figure 6 This is a schematic diagram of the explosion structure inside the bunker of this application;
[0025] Figure 7 This is a schematic diagram of the connection structure between the rotating ring and the incoming line ring of this application;
[0026] Figure 8 This is a schematic diagram of the structure of the body shell and the fixed shell of this application.
[0027] In the figure: 1. body shell; 2. gateway assembly; 3. support foot; 4. heat dissipation port; 5. closing chamber; 6. first magnetic block; 7. rotating door; 8. second magnetic block; 9. fixed cylinder; 10. closing ring; 11. pressure block; 12. connecting block; 13. rotating ring; 14. first fixed block; 15. incoming line ring; 16. second fixed block; 17. control pull rod; 18. first spring; 19. fixed shell; 20. mounting head; 21. connecting rod; 22. second spring; 23. buffer pad. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application is clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work also fall within the scope of protection of the present application.
[0029] like Figures 1 to 8 As shown, a gateway device with a cable bundling function provided by the present application includes a body shell 1, a gateway component 2 is detachably installed inside the body shell 1, a support leg 3 is fixedly provided at the bottom of the body shell 1, and a heat dissipation port 4 is fixedly provided on the left and right sides of the body shell 1;
[0030] A collecting bin 5 is fixedly installed on the back of the shell 1, a fixed cylinder 9 is fixedly installed inside one end of the collecting bin 5, a collecting ring 10 is fixedly installed inside the fixed cylinder 9, and four groups of pressure blocks 11 are rotatably connected to one side of the collecting bin 5 port of the collecting ring 10, and the other ends of the four groups of pressure blocks 11 are rotatably connected to connecting blocks 12 respectively, and the four groups of connecting blocks 12 are all fixedly installed on one side of a rotating ring 13, the rotating ring 13 is rotatably installed inside the fixed cylinder 9, and four groups of first fixed blocks 14 are fixedly installed on the other side of the rotating ring 13.
[0031] An inlet ring 15 is fixedly installed on the outer wall of one end of the collection chamber 5, and an annular groove is provided on the inner wall of the inlet ring 15. Four groups of second fixed blocks 16 are fixedly provided in the annular groove. The four groups of second fixed blocks 16 are distributed in a circle. The first fixed blocks 14 and the second fixed blocks 16 correspond to each other one by one and are elastically connected by a first spring 18. A control rod 17 is fixedly connected to one of the first fixed blocks 14, and one end of the control rod 17 passes through the inlet ring 15 and extends to the outside of the inlet ring 15.
[0032] Specifically, an arc-shaped through hole is provided on the end surface of the wire inlet ring 15 , wherein the arc-shaped through hole is, for example, approximately a quarter of a circular arc, so as to facilitate the control of the movement of the pull rod 17 .
[0033] A sliding groove for sliding the connecting block 12 is arranged on the end face of the pressing block 11 close to the connecting block 12, wherein one end of the sliding groove is located at a position of the end face of the pressing block 11 close to the outer edge, and the other end is located at a position of the end face of the pressing block 11 close to the inner edge. When the connecting block 12 moves, from one end of the sliding groove to the other end, it drives the pressing block 11 to move outward, thereby making the four groups of pressing blocks 11 open outward.
[0034] When connecting the cable to the gateway component 2, the staff pulls the control rod 17 to make the control rod 17 drive the first fixed block 14 to rotate, and the rotation of the first fixed block 14 drives the rotating ring 13 to rotate, and stretches the first spring 18. At the same time, since one side of the connection block 12 is fixedly connected to the rotating ring 13, and the other side of the connection block 12 is rotatably connected to the pressure block 11, the rotation of the rotating ring 13 drives the connection block 12 to rotate, and the rotation of the connection block 12 causes the four groups of pressure blocks 11 to open outward. At this time, the staff passes one end of the cable through the incoming ring 15, the rotating ring 13, the pressure block 11, the closing ring 10 and the fixed tube 9 in sequence, enters the interior of the closing chamber 5, and then connects to the port of the gateway component 2.
[0035] After the cable is installed, the staff releases the control rod 17. At this time, the elastic potential energy of the first spring 18 will pull the first fixed block 14 to reset. The reset of the first fixed block 14 drives the rotating ring 13 to reset. The reset of the rotating ring 13 resets the four groups of pressure blocks 11 through the connecting block 12, thereby clamping the cable.
[0036] In this embodiment, the control rod 17 is pulled to drive the rotating ring 13 to rotate through the first fixed block 14. When the rotating ring 13 rotates, it drives the connecting block 12 to rotate. The rotation of the connecting block 12 will open the four groups of pressure blocks 11 outward, which is convenient for the cables to enter the interior of the bundling chamber 5. After the cable is installed, the rotating ring 13 is reset by the elastic potential energy of the first spring 18, so that the four groups of pressure blocks 11 clamp the cables. Compared with the traditional device, the device collects the cables into the bundling chamber 5, wherein the excess length of the cables can be collected into the bundling chamber 5, so that the length of the cables outside the bundling chamber 5 just meets the connection requirements, thereby reducing the winding complexity of the cables outside the bundling chamber 5 and making it easier to distinguish. In addition, by setting the pressure block 11 and the first spring 18, the connected cables are bundled and fixed, which reduces the difficulty of cable distribution and reduces the workload.
[0037] Among them, optional, such as Figure 1-Figure 3 ,as well as Figure 8 As shown, a fixed shell 19 is fixedly installed on both the left and right sides of the body shell 1, and the fixed shell 19 is connected to the body shell 1;
[0038] A mounting head 20 is movably mounted inside the fixed shell 19. One end of the mounting head 20 is located inside the machine body shell 1 and is tilted toward the inside of the machine body shell 1. The other end of the mounting head 20 penetrates the outer wall of the fixed shell 19 and is fixedly connected to the connecting rod 21. The mounting head 20 and the inner wall of the fixed shell 19 are elastically connected by a second spring 22.
[0039] Grooves matching the mounting head 20 are provided on the left and right side walls of the gateway assembly 2 .
[0040] Specifically, the shape of the horizontal cross section of the mounting head 20 is a right-angled trapezoid, and the right-angle waist of the mounting head 20 is fixedly connected to the connecting rod 21 .
[0041] When installing the gateway component 2, the staff first aligns the gateway component 2 with the front of the body shell 1, and then pushes the gateway component 2 into the body shell 1. At this time, the gateway component 2 moves along the inside of the body shell 1, and one end of the gateway component 2 presses the installation head 20, so that the inclined surface of the installation head 20 is stressed, so that the installation head 20 is stored in the fixed shell 19. At this time, the other end of the installation head 20 drives the connecting rod 21 to extend out of the fixed shell 19, and the second spring 22 is compressed.
[0042] When the gateway component 2 is completely inserted into the body shell 1, the installation head 20 is inserted into the groove under the action of the elastic potential energy of the second spring 22, and it is now indicated that the gateway component 2 is completely installed and fixed.
[0043] When the gateway assembly 2 needs to be maintained, the staff pulls out the connecting rod 21 to drive the installation head 20 to leave the groove and enter the fixed shell 19, thereby releasing the fixation of the gateway assembly 2 and disassembling the gateway assembly 2.
[0044] In this embodiment, the installation head 20 is accommodated in the fixing shell 19 by squeezing the gateway component 2, and the installation head 20 is installed and fixed to the gateway component 2 by the elastic potential energy provided by the second spring 22. Compared with the traditional device, the device can effectively improve the installation efficiency by setting the installation head 20, so that the gateway component 2 can be firmly installed by just pushing, and the gateway component 2 can be quickly disassembled, which effectively improves the maintenance efficiency.
[0045] Among them, optional, such as Figure 2 and Figure 4 As shown, a rotating door 7 is rotatably provided on the bundling chamber 5 .
[0046] Specifically, after the cables are connected, the staff turns on the power of the gateway component 2, and the gateway component 2 starts to operate. Then the staff flips the rotating door 7, closes the rotating door 7, and performs dust prevention operations on the port of the gateway component 2 through the rotating door 7, which effectively ensures the stability of the operation of the gateway component 2.
[0047] Among them, optional, such as Figure 4 As shown, a first magnetic block 6 is fixedly installed above the left and right inner walls of the collection chamber 5 near the rotating door 7, and a second magnetic block 8 is fixedly installed on the left and right ends of the inner wall of the rotating door 7. The first magnetic block 6 and the second magnetic block 8 attract each other.
[0048] Specifically, since the rotating door 7 and the collection chamber 5 are fixed by the first magnetic block 6 and the second magnetic block 8, the problem of the rotating door 7 not being tightly closed when the rotating door 7 is flipped downward is avoided.
[0049] Among them, optional, such as Figure 1-Figure 3 As shown, a buffer pad 23 is provided at the bottom of each support leg 3 .
[0050] Specifically, the provision of the buffer pad 23 can effectively reduce the vibration of the housing 1 and prevent the cable from falling off.
[0051] Working principle and usage process of this application:
[0052] During installation, the staff first aligns the gateway component 2 and the body shell 1, and then pushes the gateway component 2 into the body shell 1. At this time, the gateway component 2 moves along the inside of the body shell 1, and one end of the gateway component 2 will squeeze the installation head 20, so that the inclined surface of the installation head 20 is subjected to force, so that the installation head 20 is received in the fixed shell 19, and the second spring 2 is compressed at this time. When the gateway component 2 completely enters the inside of the body shell 1, the installation head 20 is stuck in the groove, which means that the installation head 20 has completed fixing the gateway component 2.
[0053] When the gateway assembly 2 is installed, the staff pulls the control rod 17 to drive the rotating ring 13 to rotate through the first fixed block 14. When the rotating ring 13 rotates, the first fixed block 14 will stretch the first spring 18. At the same time, the rotation of the rotating ring 13 also drives the connecting block 12 to rotate, and the rotation of the connecting block 12 drives the four groups of pressing blocks 11 to move outward. At this time, the staff passes one end of the cable through the incoming ring 15, the rotating ring 13, the pressing block 11, the closing ring 10 and the fixed cylinder 9 in sequence, so that it enters the interior of the closing chamber 5 and connects with the port on the gateway assembly 2.
[0054] When the cable is installed, the staff releases the control rod 17. At this time, the elastic force of the first spring 18 pulls the first fixing block 14 to reset. The reset of the first fixing block 14 drives the rotating ring 13 to reset, so that the four groups of pressing blocks 11 are tightened to clamp the cable.
[0055] The staff turns on the power of the gateway component 2, and the gateway component 2 starts to operate. Then, the rotating door 7 is closed, and the rotating door 7 and the collection chamber 5 are fixed by the first magnetic block 6 and the second magnetic block 8 to complete the protection operation.
[0056] When the gateway assembly 2 needs to be maintained, the staff pulls out the connecting rod 21, and the mounting head 20 leaves the groove and enters the fixed shell 19, and then the gateway assembly 2 can be disassembled.
[0057] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A gateway device with a cable bundling function, comprising a housing (1), characterized in that: A gateway component (2) is detachably mounted inside the housing (1), a support foot (3) is fixedly provided at the bottom of the housing (1), and heat dissipation openings (4) are fixedly provided on the left and right sides of the housing (1); A collecting bin (5) is fixedly installed on the back of the shell (1), a fixed cylinder (9) is fixedly installed inside one end of the collecting bin (5), a collecting ring (10) is fixedly installed inside the fixed cylinder (9), and four groups of pressing blocks (11) are rotatably connected to one side of the collecting ring (10) close to the port of the collecting bin (5), and the other ends of the four groups of pressing blocks (11) are rotatably connected to connecting blocks (12), and the four groups of connecting blocks (12) are all fixedly installed on one side of a rotating ring (13), and the rotating ring (13) is rotatably installed inside the fixed cylinder (9), and four groups of first fixing blocks (14) are fixedly installed on the other side of the rotating ring (13); A wire feed ring (15) is fixedly installed on the outer wall of one end of the bundling bin (5), and an annular groove is arranged on the inner wall of the wire feed ring (15). Four groups of second fixed blocks (16) are fixedly arranged in the annular groove. The four groups of second fixed blocks (16) are distributed in a circle. The first fixed blocks (14) and the second fixed blocks (16) correspond to each other one by one and are elastically connected by a first spring (18). A control pull rod (17) is fixedly connected to one of the first fixed blocks (14), and one end of the control pull rod (17) passes through the wire feed ring (15) and then extends to the outside of the wire feed ring (15).
2. The gateway device with cable bundling function according to claim 1, characterized in that: A fixed shell (19) is fixedly mounted on both the left and right sides of the machine body shell (1), and the fixed shell (19) is in communication with the machine body shell (1); A mounting head (20) is movably mounted inside the fixed shell (19); one end of the mounting head (20) is located inside the machine body shell (1) and is tilted toward the inside of the machine body shell (1); the other end of the mounting head (20) penetrates the outer wall of the fixed shell (19) and is fixedly connected to a connecting rod (21); the mounting head (20) and the inner wall of the fixed shell (19) are elastically connected via a second spring (22); The left and right side walls of the gateway component (2) are provided with grooves matching the mounting head (20).
3. The gateway device with cable bundling function according to claim 2, characterized in that: The horizontal cross-section of the mounting head (20) is in the shape of a right-angled trapezoid, and the right-angled waist of the mounting head (20) is fixedly connected to the connecting rod (21).
4. The gateway device with cable bundling function according to claim 1, characterized in that: The bundling chamber (5) is rotatably provided with a rotating door (7).
5. The gateway device with cable bundling function according to claim 4, characterized in that: A first magnetic block (6) is fixedly mounted above the left and right inner walls of the bundling bin (5) at a position close to the rotating door (7), and a second magnetic block (8) is fixedly mounted on the left and right sides of the inner wall of the rotating door (7), and the first magnetic block (6) and the second magnetic block (8) attract each other.
6. The gateway device with cable bundling function according to any one of claims 1 to 5, characterized in that: The bottoms of the supporting legs (3) are each provided with a buffer pad (23).