Construction pay-off device
By designing a construction line laying device including plug rods, top plates, bottom plates and rubber heads, the deep buried plug rods are easily pulled out from the ground by hammering, and the problem of difficulty in pulling out the deep buried plug rods is solved, and the problem of realizing the problem of pulling out the deep buried plug rods is realized. It saves time and effort.
Patent Information
- Application Number
- CN202421761651.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-07-24
AI Technical Summary
During construction, due to the lack of suitable tools during the extraction of deep buried plug rods, the labor intensity and resistance are high when pulling out the deep buried plug rods, making it difficult to pull out the plug rods from the ground easily.
A construction line laying device is designed, including insertion rod, top plate, bottom plate, plug groove, bottom block, column rod and tube sleeve. The top block drives the insertion rod to move by hammering the bottom block, combining rubber head and protection. The disc prevents the hammer from hitting directly, achieving convenient pull-out of the rod.
The device makes the insertion rod conveniently pull out from the ground by hammering, which saves time and effort compared to manpower extraction, and solves the problem of difficulty in pulling out the deep buried insertion rod.
Smart Images

Figure CN222348382U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a construction laying-out device, belonging to the technical field of building construction. Background Art
[0002] During the construction process, it is necessary to excavate a foundation pit. Before excavating the foundation pit, a thin rope needs to be laid on the ground, and then white lime is sprinkled along the thin rope to provide instructions for excavating the foundation pit. The thin rope needs to be supported by a rod at the bend. A pointed head is processed at one end of the rod. The rod is knocked into the ground with a hammer to limit the position of the rod. In the process of pulling out the rod, due to the lack of suitable tools, manpower is required to pull out the rod and recycle the rod. For the rod with a deeper insertion depth, the resistance to pulling out is relatively large, and the labor intensity of manual pulling out is high. Therefore, it is necessary to design a construction layout device that can conveniently pull out the rod from the ground. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model aims to provide a construction laying-out device to solve the problems raised in the above-mentioned background technology. The utility model can conveniently pull out the insertion rod from the ground.
[0004] In order to achieve the above-mentioned purpose, the utility model is realized through the following technical scheme: a construction line-laying device, including a plug rod, a pointed head is connected and fixed at the lower end of the plug rod, a top plate is connected and fixed at the upper end of the plug rod, an annular groove for limiting the position of the thin rope is opened on the annular side surface of the top plate, the plug rod passes through a vertical hole, the vertical hole is opened on the upper surface of the bottom plate, a plug-in groove is opened on the side of the upper surface of the bottom plate away from the vertical hole, the plug-in groove is arranged along the length direction of the bottom plate, a plug-in strip is inserted in the plug-in groove, a bottom block is provided on the upper side of the plug-in groove, a plug-in strip is connected and fixed to the bottom of the bottom block, a lower inclined surface is processed on the upper surface of the bottom block, a top block matching with the bottom block is connected and fixed to the outer surface of the plug rod, and an upper inclined surface matching with the lower inclined surface is processed on the lower surface of the top block.
[0005] Furthermore, the middle position of the upper surface of the top plate is recessed downward to form a plug hole, a pin rod is inserted in the plug hole, and a protective plate is connected and fixed to the upper end of the pin rod.
[0006] Furthermore, a rubber head is adhered to the lower end of the pin rod, and the rubber head is inserted into the socket, and the outer diameter of the rubber head is the same as the inner diameter of the socket.
[0007] Furthermore, a detachable column rod is installed on one side of the bottom block, and a disc is connected and fixed to one end of the column rod away from the bottom block.
[0008] Furthermore, the outer surface of one end of the column away from the disc is processed with external threads, and the side of the bottom block facing the column is provided with a threaded hole, and one end of the column processed with external threads is threadedly connected in the threaded hole.
[0009] Furthermore, a pipe sleeve is provided on one side of the top block, a plurality of connecting columns are connected and fixed to the outer surface of the pipe sleeve, an end of the connecting column away from the pipe sleeve is connected and fixed to the top block, and the pipe sleeve is provided on the insertion rod and connected and fixed to the insertion rod.
[0010] Furthermore, a plurality of first blind holes are formed on the outer surface of the pipe sleeve, a plurality of second blind holes are formed on a side of the top block facing the pipe sleeve, and two ends of the connecting column are respectively fixed in the first blind holes and the second blind holes.
[0011] Beneficial effects of the utility model:
[0012] 1. Insert the pin on the protective plate into the socket. At this time, the rubber head fits against the inner wall of the socket, which prevents the pin from escaping from the socket at will. The hammer hits the protective plate, and the protective plate prevents the hammer from directly contacting the top plate, which protects the top plate. The thin rope is wound in the annular groove, and the rod and top plate inserted in the ground support the thin rope, which is convenient for the line-releasing operation.
[0013] 2. When inserting the plug rod into the ground, make the plug rod pass through the vertical hole on the bottom plate. When the plug rod needs to be pulled out, insert the plug strip into the plug slot to complete the plug connection between the bottom block and the bottom plate, so that the lower inclined surface is parallel to the upper inclined surface, and then use a hammer to knock the bottom block to make the bottom block push the top block upward, and the top block drives the plug rod to move upward, so that the plug rod is pulled out of the ground by hammering. Compared with the method of manually holding the plug rod and pulling it upward, it saves time and effort and can conveniently pull the plug rod out of the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0015] Figure 1 This is a structural schematic diagram of a construction laying-out device of the utility model;
[0016] Figure 2 This is a three-dimensional diagram of a bottom plate in a construction setting-out device of the utility model;
[0017] Figure 3 It is a schematic diagram of the assembly of a disc, a column rod and a bottom block in a construction setting-out device of the utility model;
[0018] Figure 4 It is a schematic diagram of the assembly of a pipe sleeve and a top block in a construction laying-out device of the utility model;
[0019] Figure 5 It is a schematic diagram of the assembly of the top plate and the insertion rod in a construction laying-out device of the utility model;
[0020] Figure 6 It is a schematic diagram of the assembly of a rubber head, a pin rod and a protective plate in a construction line-laying device of the utility model;
[0021] In the figure: 1-insertion rod, 2-pointed head, 3-bottom plate, 4-disc, 5-column rod, 6-bottom block, 7-lower inclined surface, 8-top block, 9-top plate, 10-annular groove, 11-protective plate, 12-pipe sleeve, 13-plug-in groove, 14-vertical hole, 15-plug-in strip, 16-upper inclined surface, 17-connecting column, 18-jack, 19-pin rod, 20-rubber head. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0023] See also Figure 1 and Figure 5 The utility model provides a technical solution: a construction laying-out device, comprising an insertion rod 1, a pointed head 2 is connected and fixed to the lower end of the insertion rod 1, and the design of the pointed head 2 reduces the resistance of the insertion rod 1 in the ground.
[0024] See also Figure 1 , Figure 5 and Figure 6 The upper end of the plug rod 1 is connected and fixed with a top plate 9, and an annular groove 10 for limiting the position of the thin rope is opened on the annular side surface of the top plate 9. The middle position of the upper surface of the top plate 9 is recessed downward to form an insertion hole 18, and a pin rod 19 is inserted in the insertion hole 18. The upper end of the pin rod 19 is connected and fixed with a protective plate 11, and a rubber head 20 is adhered to the lower end of the pin rod 19. The rubber head 20 is inserted in the insertion hole 18, and the outer diameter of the rubber head 20 is the same as the inner diameter of the insertion hole 18, so that the pin rod 19 on the protective plate 11 is inserted in the insertion hole 18. At this time, the rubber head 20 fits with the inner wall of the insertion hole 18, which prevents the pin rod 19 from arbitrarily detaching from the insertion hole 18, so that the hammer hits the protective plate 11, and then under the action of the protective plate 11, the hammer is prevented from directly contacting the top plate 9, which protects the top plate 9, so that the thin rope is wound in the annular groove 10, and then the plug rod 1 and the top plate 9 inserted in the ground can support the thin rope, which is convenient for the line-releasing operation.
[0025] See also Figure 1-Figure 2The plug rod 1 passes through the vertical hole 14, and the vertical hole 14 is provided on the upper surface of the bottom plate 3. A plug groove 13 with a T-shaped cross section is provided on the side of the upper surface of the bottom plate 3 away from the vertical hole 14. The plug groove 13 is arranged along the length direction of the bottom plate 3. A plug strip 15 with a T-shaped cross section is inserted in the plug groove 13. A bottom block 6 is provided on the upper side of the plug groove 13. The plug strip 15 is connected and fixed to the bottom of the bottom block 6. The upper surface of the bottom block 6 is processed with a lower inclined surface 7. The outer surface of the plug rod 1 is connected and fixed with a top block 8 that matches the bottom block 6. The lower surface of the top block 8 is processed with a The upper inclined surface 16, when the insertion rod 1 is inserted into the ground, the insertion rod 1 is passed through the vertical hole 14 on the bottom plate 3. When the insertion rod 1 needs to be pulled out, the connecting strip 15 is inserted into the connecting groove 13 to complete the connection between the bottom block 6 and the bottom plate 3, so that the lower inclined surface 7 is parallel to the upper inclined surface 16, and then the bottom block 6 is hit with a hammer to make the bottom block 6 push the top block 8 upward, and the top block 8 drives the insertion rod 1 to move upward, so that the insertion rod 1 is pulled out of the ground by hammering. Compared with the method of manually holding the insertion rod 1 to pull it upward, it saves time and effort, and can conveniently pull the insertion rod 1 out of the ground.
[0026] See also Figure 1 and Figure 3 A detachable column rod 5 is installed on one side of the bottom block 6, wherein the outer surface of one end of the column rod 5 away from the disc 4 is processed with an external thread, and a threaded hole is opened on the side of the bottom block 6 facing the column rod 5, so that the end of the column rod 5 processed with the external thread is threadedly connected in the threaded hole, and the assembly of the column rod 5 and the bottom block 6 is completed. The disc 4 is connected and fixed to the end of the column rod 5 away from the bottom block 6. When the bottom block 6 is struck with a hammer, the hammer strikes the disc 4, so that the hammer is kept away from the bottom plate 3 during the striking process, preventing the hammer from directly striking the bottom plate 3.
[0027] See also Figure 1 and Figure 4 A pipe sleeve 12 is provided on one side of the top block 8, and a plurality of connecting columns 17 are connected and fixed to the outer surface of the pipe sleeve 12. The end of the connecting column 17 away from the pipe sleeve 12 is connected and fixed to the top block 8. A plurality of first blind holes are provided on the outer surface of the pipe sleeve 12, and a plurality of second blind holes are provided on the side of the top block 8 facing the pipe sleeve 12, so that the two ends of the connecting column 17 are respectively fixed in the first blind hole and the second blind hole, thereby improving the stability of the connection between the connecting column 17 and the top block 8 and the pipe sleeve 12, so that the pipe sleeve 12 is sleeved on the plug rod 1 and connected and fixed to the plug rod 1, thereby realizing the connection and fixation of the top block 8 and the plug rod 1.
[0028] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A construction laying-out device, comprising an insertion rod (1), characterized in that: The lower end of the insertion rod (1) is connected and fixed with a pointed head (2), the upper end of the insertion rod (1) is connected and fixed with a top plate (9), the annular side surface of the top plate (9) is provided with an annular groove (10) for limiting the position of the thin rope, the insertion rod (1) passes through a vertical hole (14), the vertical hole (14) is provided on the upper surface of the bottom plate (3), a plug-in groove (13) is provided on the side of the upper surface of the bottom plate (3) away from the vertical hole (14), and the plug-in groove (13) is arranged along the bottom plate ( 3), a plug-in strip (15) is inserted in the plug-in slot (13), a bottom block (6) is provided on the upper side of the plug-in slot (13), the plug-in strip (15) is connected and fixed to the bottom of the bottom block (6), a lower inclined surface (7) is processed on the upper surface of the bottom block (6), a top block (8) matched with the bottom block (6) is connected and fixed on the outer surface of the plug-in rod (1), and an upper inclined surface (16) matched with the lower inclined surface (7) is processed on the lower surface of the top block (8).
2. A construction setting-out device according to claim 1, characterized in that: The middle portion of the upper surface of the top plate (9) is recessed downward to form an insertion hole (18), a pin rod (19) is inserted into the insertion hole (18), and the upper end of the pin rod (19) is connected and fixed to a protective plate (11).
3. A construction setting-out device according to claim 2, characterized in that: A rubber head (20) is adhered to the lower end of the pin rod (19), and the rubber head (20) is inserted into the insertion hole (18). The outer diameter of the rubber head (20) is the same as the inner diameter of the insertion hole (18).
4. A construction setting-out device according to claim 1, characterized in that: A detachable column rod (5) is mounted on one side of the bottom block (6), and a disc (4) is connected and fixed to one end of the column rod (5) away from the bottom block (6).
5. A construction setting-out device according to claim 4, characterized in that: The outer surface of one end of the column (5) away from the disc (4) is processed with an external thread, and a threaded hole is provided on a side of the bottom block (6) facing the column (5), and the end of the column (5) processed with the external thread is threadedly connected in the threaded hole.
6. A construction setting-out device according to claim 1, characterized in that: A pipe sleeve (12) is provided on one side of the top block (8); a plurality of connecting columns (17) are connected and fixed to the outer surface of the pipe sleeve (12); an end of the connecting column (17) away from the pipe sleeve (12) is connected and fixed to the top block (8); and the pipe sleeve (12) is sleeved on the insertion rod (1) and connected and fixed to the insertion rod (1).
7. A construction setting-out device according to claim 6, characterized in that: The outer surface of the pipe sleeve (12) is provided with a plurality of first blind holes, the side of the top block (8) facing the pipe sleeve (12) is provided with a plurality of second blind holes, and the two ends of the connecting column (17) are respectively fixed in the first blind holes and the second blind holes.