Concrete structure formwork positioning device

By using positioning devices on concrete structural formwork, the dimensional deviation problem caused by inaccurate formwork positioning is solved, and the accuracy control and standardized compliance of structural installation are achieved, and it is low cost and widely applicable.

CN222362763UActive Publication Date: 2025-01-17BEIJING SHOUGANG CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420939591.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2025-01-17
Estimated Expiration
2034-04-30

AI Technical Summary

Technical Problem

In construction, inaccurate positioning of the bottom of the concrete structure formwork leads to dimensional deviation of the concrete structure and bottom displacement problems, affecting the structural quality.

Method used

A concrete structure formwork positioning device is designed, which cuts and bends through 200mm long 40mm angle steel and installs fixing holes. The positioning device is fixed to the outside of the four-angle positioning line of the formwork to ensure the installation accuracy of the formwork.

Benefits of technology

Effectively control the installation accuracy of concrete structural formwork to ensure that the appearance dimensions and position comply with design specifications, are low in cost and can be used in turnover, and are suitable for cast-in-place square concrete components of any size.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222362763U_ABST
    Figure CN222362763U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete structure formwork positioning device and belongs to the technical field of building construction. Comprising angle steel, a positioning device (1) and a template (4), the angle steel is 40 mm angle steel with the length of 200 mm, a kerf (3) with the length of 100 mm is cut along the right angle position of the angle steel, the two edges of the kerf with the length of 100 mm are bent outwards by 90 degrees, fixing holes (2) are drilled in the upper portions of the two edges, the fixing holes (2) are long holes or two round holes are formed in each edge, and the positioning device (1) is formed. The positioning device (1) is fixed on the outer side of four corner positioning lines of the concrete structure formwork (4) through cement nails, and the concrete structure four-side formwork (4) is installed on the outer side of the positioning device (1). The device has the advantages that the mounting precision of the concrete structure template is effectively controlled, so that the appearance size and position of the concrete structure are ensured to meet the design and specification requirements; the device is low in manufacturing cost and has the characteristic of being capable of being recycled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model patent belongs to the field of building construction technology, and in particular provides a concrete structure template positioning device. Background Art

[0002] At present, in construction, most concrete structure formworks are positioned by wooden planks or positioning cards. The disadvantage is that when pouring column concrete, it is easy to cause quality problems such as bottom displacement, resulting in problems such as excessive dimensional deviation of the concrete structure and bottom displacement. Utility Model Content

[0003] The utility model aims to provide a concrete structure formwork positioning device, which solves the quality problem of the concrete structure caused by bottom displacement due to inaccurate bottom formwork positioning.

[0004] The utility model comprises an angle steel, a positioning device 1, and a template 4; the angle steel is a 40mm angle steel with a length of 200mm, a 100mm long slit 3 is cut along the right angle of the angle steel, two sides along the 100mm slit are bent outwards by 90 degrees, and fixing holes 2 are drilled on the upper parts of the two sides, and the fixing holes 2 are long holes or two round holes on each side, forming a positioning device 1; cement nails are used to fix the positioning device 1 on the outside of the four corner positioning lines of the concrete structure template 4, and the four-side templates 4 of the concrete structure are installed on the outside of the positioning device 1. It is made in the following way:

[0005] Use 200mm long 40 angle steel to cut a 100mm long slit 3 along the right angle. Then bend the cut 100mm angle steel 90 degrees outward along the two sides of the angle steel, and drill fixing holes 2 on its upper part after bending. The fixing holes are long holes or two round holes on each side, which are processed into concrete positioning devices 1. Before installing the template, use cement nails to fix the positioning device 1 to the outside of the four corner positioning lines of the concrete structure template along the template positioning line. Install the four-side template 4 of the concrete structure on the outside of the template positioning device 1 to ensure that the template joints are tight and the template is reinforced.

[0006] The advantage of the utility model is that the installation accuracy of the concrete structure formwork can be effectively controlled by the device, thereby ensuring that the appearance size and position of the concrete structure meet the design and specification requirements; the device has low manufacturing cost and the characteristic of being recyclable, and also has the characteristic of being widely used, and can be used at the right angles at the bottom of cast-in-place square concrete components of any size. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 This is the processing drawing of the concrete structure formwork positioning device.

[0008] Figure 2 Structural drawing of the positioning device for the concrete structure formwork

[0009] Figure 3 This is the installation drawing of the concrete structure formwork positioning device.

[0010] In the figure, there are template positioning device 1, fixing hole 2, slit 3, and template 4. DETAILED DESCRIPTION

[0011] The utility model comprises an angle steel, a positioning device 1, and a template 4; the angle steel is a 40mm angle steel with a length of 200mm, a 100mm long slit 3 is cut along the right angle of the angle steel, two sides along the 100mm slit are bent outwards by 90 degrees, and fixing holes 2 are drilled on the upper parts of the two sides, and the fixing holes 2 are long holes or two round holes on each side, forming a positioning device 1; cement nails are used to fix the positioning device 1 on the outside of the four corner positioning lines of the concrete structure template 4, and the four-side templates 4 of the concrete structure are installed on the outside of the positioning device 1. It is made in the following way:

[0012] 1. Cut a 100mm long slit 3 along the right angle of the 200mm long 40 angle steel, then bend the cut 100mm angle steel 90 degrees outward along the two sides of the angle steel, and drill a fixing hole 2 on its upper part after bending. The fixing holes are long holes or two round holes on each side, and are processed into a concrete structure template positioning device 1.

[0013] 2. 40 angle steels are processed in batches at the processing site, and transported to the site for installation after anti-corrosion and rust removal. Before the concrete structure formwork is installed, cement nails are used to fix the concrete structure formwork positioning device 1 at the four corners of the concrete structure formwork along the concrete structure formwork line, and then the formwork 4 is installed on the outside of the fixing part.

[0014] 3. After the concrete pouring is completed, the concrete structure formwork fixings are removed with a small crowbar after the formwork is removed.

[0015] The construction steps of this utility model are as follows

[0016] 1. Before installing the concrete structure formwork, fix the concrete structure formwork positioning device 1 along the formwork line along the installation hole 2 with cement nails to the outside of the positioning line of the four corners of the formwork.

[0017] 2. Install the four-side formwork 4 of the concrete structure on the outside of the formwork positioning device 1 to ensure that the formwork joints are tight.

[0018] 3. After the concrete structure is demolded, use a small crowbar to remove the fixings for rotational use.

Claims

1. A concrete structure formwork positioning device, characterized in that: The invention comprises an angle steel, a positioning device (1) and a template (4); the angle steel is a 40 mm angle steel with a length of 200 mm, a 100 mm long slit (3) is cut along the right angle of the angle steel, two sides along the 100 mm slit are bent outwards by 90 degrees, fixing holes (2) are drilled on the upper parts of the two sides, and the fixing holes (2) are long holes or two round holes on each side, forming the positioning device (1); cement nails are used to fix the positioning device (1) on the outside of the four corner positioning lines of the concrete structure template (4), and the four sides of the concrete structure template (4) are installed on the outside of the positioning device (1).