Three-roller grinding machine with efficient heat dissipation structure

By designing the efficient heat dissipation structure in the three roller grinders, the heat produced by the use of sprinkler components and cooling components to absorb the grinding roller, solve the problem of heat accumulation during the grinding process, realize the protection of epoxy resin ingredients and the stability of the grinding process. promote.

CN222384896UActive Publication Date: 2025-01-24HESHAN OUKETE ELECTRONIC TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420881967.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2025-01-24
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

The existing three-roll grinder generates a lot of heat during the grinding process, which easily destroys the epoxy resin raw material components.

Method used

A three -roller grinding machine with an efficient heat dissipation structure is designed to absorb the heat generated by the sprinkler component and cooling component to reduce the temperature and avoid damage to the composition of epoxy resin ingredients.

Benefits of technology

Effectively reduce the temperature of the grinding part, avoid the destruction of epoxy resin ingredients caused by high temperature, and improve the stability of the grinding process and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222384896U_ABST
    Figure CN222384896U_ABST
Patent Text Reader

Abstract

The utility model discloses a three-roller grinder with an efficient heat dissipation structure, and relates to the technical field of grinders, the three-roller grinder comprises a machine base, the upper end of the machine base is rotatably connected with a first grinding roller, a second grinding roller and a third grinding roller, the top of the right end of the machine base is provided with a motor cover, the motor cover is internally provided with three motors, and the three motors are arranged on the machine base. The output ends of the three motors are fixedly connected with a first grinding roller, a second grinding roller and a third grinding roller correspondingly, a feeding hopper is fixedly installed at the upper end of the machine base, and a flow guide plate is fixedly installed at the front end of the machine base. A heat dissipation structure is arranged at the left end of the machine base and used for reducing the temperature of the first grinding roller, the second grinding roller and the third grinding roller during operation. Heat generated during grinding of the first grinding roller, the second grinding roller and the third grinding roller is absorbed through the water spraying assembly; heat of cooling liquid in the cooling box is taken away through the cooling assembly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of grinders, in particular to a three-roll grinder with a high-efficiency heat dissipation structure. Background Art

[0002] In the preparation process of liquid epoxy resin, a three-roll grinder is often used to grind it to homogenize the liquid epoxy resin. A grinder described in the patent with the existing patent announcement number CN218189855U, when grinding liquid epoxy resin, pour the liquid epoxy resin from the feed port. The inverted trapezoidal feed port is convenient for feeding and forms a flow limiter for the liquid epoxy resin; since the first guide plate and the second guide plate are both magnetic, they can absorb the metal debris carried in the liquid epoxy resin. After the grinding of the liquid epoxy resin is completed, the third guide plate guides the liquid epoxy resin to flow to the designated location; the liquid epoxy resin flows through the magnet rod, and the magnet rod absorbs the metal debris carried in the liquid epoxy resin to improve the quality of the production of liquid epoxy resin. When the magnet rod absorbs more metal debris, the magnet rod can be replaced. During the grinding process, the grinding roller rotates at high speed and rubs against another grinding roller to generate high temperature, which causes a large amount of heat to be generated in the grinding part, which can easily destroy the raw material components of the epoxy resin. Therefore, the grinding roller of the three-roll mill needs to be cooled.

[0003] Based on this, a three-roller mill with a high-efficiency heat dissipation structure is now provided, which can eliminate the disadvantages of the existing device. Utility Model Content

[0004] The utility model aims to provide a three-roller grinder with an efficient heat dissipation structure to solve the problem in the background art that various parts inside the grinder will generate a lot of heat when working, which is easy to destroy the epoxy resin raw material components.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A three-roller grinding machine with an efficient heat dissipation structure comprises a machine base, the upper end of the machine base is rotatably connected to a first grinding roller, a second grinding roller and a third grinding roller, a motor cover is installed on the top of the right end of the machine base, three motors are installed inside the motor cover, the output ends of the three motors are respectively fixedly connected to the first grinding roller, the second grinding roller and the third grinding roller, the axes of the first grinding roller, the second grinding roller and the third grinding roller are parallel and there is a gap between every two rollers for raw materials to pass through, a feed hopper is fixedly installed on the upper end of the machine base, the feed hopper is located above the gap between the first grinding roller and the second grinding roller, and a guide plate is fixedly installed on the front end of the machine base; a heat dissipation structure is arranged on the left end of the machine base to reduce the temperature of the first grinding roller, the second grinding roller and the third grinding roller during operation.

[0007] On the basis of the above technical solutions, the present invention also provides the following optional technical solutions:

[0008] In an optional scheme: the heat dissipation structure includes three fixed tubes, which are respectively fixedly installed on the left ends of the first grinding roller, the second grinding roller and the third grinding roller, the right end of the fixed tube is rotatably connected to the connecting tube, the right end of the connecting tube is fixedly connected to a water distribution tank, a water distribution pump is installed inside the water distribution tank, the output end of the water distribution pump is fixedly connected to a sprinkler assembly, a through hole is provided at the lower end of the connecting tube, the through hole is fixedly connected to a recovery pipe, the other end of the recovery pipe is connected to a filter assembly, the interior of the filter assembly is connected to a first post-filter pipe, the left end of the first post-filter pipe is fixedly connected to the input end of the first water pump, the output end of the first water pump is connected to the interior of the cooling assembly through the second post-filter pipe, the water distribution tank is fixedly connected to the second cold water pipe, the other end of the second cold water pipe is fixedly connected to the output end of the second water pump, and the input end of the second water pump is connected to the interior of the cooling assembly through the first cold water pipe.

[0009] In an optional scheme: the sprinkler assembly includes a sprinkler pipe, which is installed inside the first grinding roller, the second grinding roller and the third grinding roller. One end of the sprinkler pipe is fixedly connected to the output end of the water pump in the water distribution tank, and the other end of the sprinkler pipe is rotatably connected to the inner wall of the first grinding roller, the second grinding roller and the third grinding roller. A plurality of sprinkler ports are opened at the upper end of the sprinkler pipe.

[0010] In an optional scheme: the filter assembly includes a filter box, which is installed below the water distribution tank. The interior of the filter box is connected to the interior of the connecting pipe through a recovery pipe. The interior of the filter box is provided with a first filter layer, a second filter layer and a third filter layer in sequence. The left end of the filter box is fixedly connected to the first post-filter pipe, the interior of the filter box is connected to the first post-filter pipe, the left end of the first post-filter pipe is fixedly connected to the input end of the first water pump, the output end of the first water pump is fixedly connected to the second post-filter pipe, and the other end of the second post-filter pipe is connected to the interior of the cooling assembly.

[0011] In an optional scheme: the cooling component includes a cooling box, which is arranged on the left side of the water distribution tank, a cooling box is installed inside the cooling box, the interior of the cooling box is connected with the second post-filter pipe, a heat dissipation grid is fixedly installed on the left end of the cooling box, two fans are symmetrically installed on the right end of the cooling box, the upper end of the cooling box is fixedly connected to the first cold water pipe, the first cold water pipe is fixedly connected to the input end of the second water pump, the output end of the second water pump is fixedly connected to the second cold water pipe, and the other end of the second cold water pipe is connected with the interior of the water distribution tank.

[0012] In an optional solution: a magnet column is arranged above the guide plate, and there is a gap between the magnet column and the guide plate to facilitate the passage of raw materials.

[0013] In an optional solution: the feed hopper is magnetic.

[0014] In an optional solution: the first filter layer is an activated carbon filter layer, the second filter layer is a stainless steel filter mesh, and the third filter layer is an impurity collection filter mesh.

[0015] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0016] 1. The utility model uses a water sprinkling assembly and a water distribution pump inside a water distribution tank to discharge the coolant into a water sprinkling pipe, and then the coolant is sprinkled out through a plurality of water sprinkling ports opened at the upper end of the water sprinkling pipe, thereby absorbing the heat generated by the first grinding roller, the second grinding roller and the third grinding roller during grinding, reducing the temperature of the grinding part, and avoiding excessive temperature, thereby causing damage to the epoxy resin raw material components.

[0017] 2. The utility model uses a cooling component. After the coolant is filtered by the filter component, the first water pump discharges the coolant into the cooling box. The fan rotates to blow air, thereby taking away the heat of the coolant in the cooling box. The hot air is discharged through the heat dissipation grid to complete the cooling of the coolant. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the utility model.

[0019] Figure 2 It is a structural schematic diagram of the upper end of the utility model.

[0020] Figure 3 It is a structural schematic diagram of the rear end position of the utility model.

[0021] Figure 4 It is a structural schematic diagram of the heat dissipation structure position of the utility model.

[0022] Figure 5 It is a structural schematic diagram of the location of the filter component of the utility model.

[0023] Figure 6 This is a structural schematic diagram of the location of the cooling component of the utility model.

[0024] Notes on figure markings: 11. base; 12. feed hopper; 13. motor cover; 14. motor; 15. first grinding roller; 16. second grinding roller; 17. third grinding roller; 18. fixed pipe; 19. connecting pipe; 20. sprinkler pipe; 21. sprinkler port; 22. through hole; 23. recovery pipe; 24. filter box; 25. first filter layer; 26. second filter layer; 27. third filter layer; 28. first post-filter pipe; 29. ​​first water pump; 30. second post-filter pipe; 31. cooling box; 32. fan; 33. cooling box; 34. heat dissipation grid; 35. first cold water pipe; 36. second water pump; 37. second cold water pipe; 38. water distribution box; 39. guide plate. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0026] Example 1

[0027] In one embodiment, Figure 1-Figure 6 As shown, a three-roller grinding machine with an efficient heat dissipation structure includes a machine base 11, the upper end of the machine base 11 is rotatably connected to a first grinding roller 15, a second grinding roller 16 and a third grinding roller 17, a motor cover 13 is installed on the top of the right end of the machine base 11, and three motors 14 are installed inside the motor cover 13, and the output ends of the three motors 14 are respectively fixedly connected to the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17, the axes of the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17 are parallel, and there is a gap between every two rollers for raw materials to pass through, a feed hopper 12 is fixedly installed on the upper end of the machine base 11, and the feed hopper 12 is located above the gap between the first grinding roller 15 and the second grinding roller 16, and a guide plate 39 is fixedly installed at the front end of the machine base 11; a heat dissipation structure is arranged on the left end of the machine base 11 for reducing the operating temperature of the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17.

[0028] In this embodiment, the staff pours the raw material into the feed hopper 12 and then starts the motor 14. The motor 14 drives the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17. The first grinding roller 15, the second grinding roller 16 and the third grinding roller 17 rotate to grind the raw material. A large amount of heat is generated during grinding by the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17. The staff uses the heat dissipation structure to dissipate the heat generated during grinding by the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17, thereby reducing the operating temperature of the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17.

[0029] In one embodiment, Figure 1 and Figure 4 As shown, the heat dissipation structure includes three fixed tubes 18, which are respectively fixedly mounted on the left ends of the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17, and the right ends of the fixed tubes 18 are rotatably connected to the connecting tube 19, and the right end of the connecting tube 19 is fixedly connected to the water distribution tank 38, and a water distribution pump is installed inside the water distribution tank 38, and the output end of the water distribution pump is fixedly connected to the sprinkler assembly, and a through hole 22 is provided at the lower end of the connecting tube 19, and the through hole 22 is fixedly connected to the recovery pipe 23, and the recovery pipe 23 is fixedly connected to the recovery pipe 23. The other end of the receiving tube 23 is connected to the filter assembly, and the interior of the filter assembly is connected to the first post-filter tube 28. The left end of the first post-filter tube 28 is fixedly connected to the input end of the first water pump 29, and the output end of the first water pump 29 is connected to the interior of the cooling assembly through the second post-filter tube 30. The water distribution tank 38 is fixedly connected to the second cold water pipe 37, and the other end of the second cold water pipe 37 is fixedly connected to the output end of the second water pump 36, and the input end of the second water pump 36 is connected to the interior of the cooling assembly through the first cold water pipe 35.

[0030] The staff starts the water distribution pump inside the water distribution tank 38, and the water distribution pump discharges the coolant inside the water distribution tank 38 into the sprinkler assembly, and the sprinkler assembly cools the grinding part. The excess coolant enters the filter assembly through the recovery pipe 23, and the filter assembly filters the coolant. Then the first water pump 29 is started, and the coolant is discharged into the cooling assembly through the first post-filter pipe 28 and the second post-filter pipe 30, and the cooling assembly cools the coolant.

[0031] In one embodiment, Figure 4 As shown, the watering assembly includes a watering pipe 20, which is installed inside the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17. One end of the watering pipe 20 is fixedly connected to the output end of the water distribution pump in the water distribution box 38, and the other end of the watering pipe 20 is rotatably connected to the inner wall of the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17. A plurality of watering ports 21 are opened at the upper end of the watering pipe 20.

[0032] The water distribution pump discharges the coolant in the water distribution tank 38 into the sprinkler pipe 20, and the coolant is discharged through a plurality of sprinkler ports 21 provided at the upper end of the sprinkler pipe 20. The coolant accumulates inside the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17. The coolant absorbs the heat generated by the grinding parts of the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17, thereby reducing the temperature of the grinding parts and avoiding damage to the epoxy resin raw material components due to excessive temperature.

[0033] In one embodiment, Figure 2 , Figure 4 and Figure 5As shown, the filter assembly includes a filter box 24, which is installed below the water distribution box 38. The interior of the filter box 24 is connected to the interior of the connecting pipe 19 through the recovery pipe 23. The interior of the filter box 24 is provided with a first filter layer 25, a second filter layer 26 and a third filter layer 27 in sequence. The left end of the filter box 24 is fixedly connected to the first post-filter pipe 28, and the interior of the filter box 24 is connected to the first post-filter pipe 28. The left end of the first post-filter pipe 28 is fixedly connected to the input end of the first water pump 29, and the output end of the first water pump 29 is fixedly connected to the second post-filter pipe 30. The other end of the second post-filter pipe 30 is connected to the interior of the cooling assembly.

[0034] The coolant enters the filter box 24 and is filtered in sequence through the first filter layer 25 , the second filter layer 26 and the third filter layer 27 , thereby recycling the coolant and avoiding waste of resources.

[0035] In one embodiment, Figure 3 , Figure 4 and Figure 6 As shown, the cooling component includes a cooling box 31, which is arranged on the left side of the water distribution tank 38. A cooling box 33 is installed inside the cooling box 31, and the interior of the cooling box 33 is connected to the second post-filter pipe 30. A heat dissipation grid 34 is fixedly installed on the left end of the cooling box 33, and two fans 32 are symmetrically installed on the right end of the cooling box 31. The upper end of the cooling box 33 is fixedly connected to a first cold water pipe 35, and the first cold water pipe 35 is fixedly connected to the input end of the second water pump 36. The output end of the second water pump 36 is fixedly connected to the second cold water pipe 37, and the other end of the second cold water pipe 37 is connected to the inside of the water distribution tank 38.

[0036] The coolant enters the cooling box 33, and the cooling box 31 supports the fan 32 to rotate and blow air to take away the heat of the coolant in the cooling box 33, thereby completing the cooling of the coolant.

[0037] In one embodiment, Figure 1 and Figure 2 As shown, a magnet column is arranged above the guide plate 39, and there is a gap between the magnet column and the guide plate 39 for the raw materials to pass through.

[0038] The liquid epoxy resin flows through the magnet rod, and the magnet rod absorbs the metal debris carried in the liquid epoxy resin, thereby improving the quality of the produced liquid epoxy resin.

[0039] Example 2

[0040] In one embodiment, Figure 1 and Figure 2 As shown, the feed hopper 12 has magnetic properties.

[0041] The liquid epoxy resin will carry a portion of metal debris, and the portion of metal debris in the liquid epoxy resin flowing through the feed hopper 12 will be adsorbed by the magnetic feed hopper 12, thereby improving the quality of the epoxy resin.

[0042] In one embodiment, Figure 5 As shown, the first filter layer 25 is an activated carbon filter layer, the second filter layer 26 is a stainless steel filter screen, and the third filter layer 27 is an impurity collection filter screen.

[0043] The activated carbon filter layer, stainless steel filter and impurity collection filter adsorb impurities in the recovered coolant, thereby preventing the impurities from affecting the subsequent cooling of the coolant.

[0044] The above embodiment discloses a three-roller grinder with an efficient heat dissipation structure, wherein a staff member pours the raw material into the feed hopper 12, and then starts the motor 14, the motor 14 drives the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17, the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17 rotate to grind the raw material, a large amount of heat is generated when the first grinding roller 15, the second grinding roller 16 and the third grinding roller 17 are ground, the staff member starts the water distribution pump inside the water distribution tank 38, the water distribution pump discharges the coolant inside the water distribution tank 38 into the sprinkler assembly, the sprinkler assembly cools the grinding part, the excess coolant enters the filter assembly through the recovery pipe 23, the filter assembly filters the coolant, and then starts the first water pump 29, and discharges it into the cooling assembly through the first post-filter pipe 28 and the second post-filter pipe 30, the cooling assembly cools the coolant.

[0045] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A three-roller grinding machine with an efficient heat dissipation structure, comprising a machine base (11), wherein the upper end of the machine base (11) is rotatably connected to a first grinding roller (15), a second grinding roller (16) and a third grinding roller (17), a motor cover (13) is installed at the top of the right end of the machine base (11), and three motors (14) are installed inside the motor cover (13), and the output ends of the three motors (14) are respectively fixedly connected to the first grinding roller (15), the second grinding roller (16) and the third grinding roller (17), the axes of the first grinding roller (15), the second grinding roller (16) and the third grinding roller (17) are parallel, and there is a gap between each two rollers for raw materials to pass through, a feed hopper (12) is fixedly installed at the upper end of the machine base (11), and the feed hopper (12) is located above the gap between the first grinding roller (15) and the second grinding roller (16), and a guide plate (39) is fixedly installed at the front end of the machine base (11); It is characterized in that It also includes a heat dissipation structure, which is arranged at the left end of the machine base (11) and is used to reduce the operating temperature of the first grinding roller (15), the second grinding roller (16) and the third grinding roller (17); The heat dissipation structure comprises three fixed tubes (18), the three fixed tubes (18) are respectively fixedly mounted on the left ends of the first grinding roller (15), the second grinding roller (16) and the third grinding roller (17), the right ends of the fixed tubes (18) are rotatably connected to the connecting tube (19), the right end of the connecting tube (19) is fixedly connected to the water distribution box (38), a water distribution pump is installed inside the water distribution box (38), the output end of the water distribution pump is fixedly connected to the sprinkler assembly, a through hole (22) is provided at the lower end of the connecting tube (19), the through hole (22) is fixedly connected to the recovery tube (23), and the The other end of the recovery pipe (23) is connected to the filter assembly, and the interior of the filter assembly is connected to the first post-filter pipe (28). The left end of the first post-filter pipe (28) is fixedly connected to the input end of the first water pump (29), and the output end of the first water pump (29) is connected to the interior of the cooling assembly through the second post-filter pipe (30). The water distribution tank (38) is fixedly connected to the second cold water pipe (37), and the other end of the second cold water pipe (37) is fixedly connected to the output end of the second water pump (36), and the input end of the second water pump (36) is connected to the interior of the cooling assembly through the first cold water pipe (35).

2. The three-roller mill with a high-efficiency heat dissipation structure according to claim 1, characterized in that: The watering assembly comprises a watering pipe (20), the watering pipe (20) being installed inside the first grinding roller (15), the second grinding roller (16) and the third grinding roller (17), one end of the watering pipe (20) being fixedly connected to the output end of the water distribution pump inside the water distribution box (38), the other end of the watering pipe (20) being rotatably connected to the inner wall of the first grinding roller (15), the second grinding roller (16) and the third grinding roller (17), and a plurality of watering ports (21) being provided at the upper end of the watering pipe (20).

3. The three-roller grinding machine with high-efficiency heat dissipation structure according to claim 2, characterized in that: The filter assembly comprises a filter box (24), the filter box (24) is installed below the water distribution box (38), the interior of the filter box (24) is connected to the interior of the connecting pipe (19) through a recovery pipe (23), the interior of the filter box (24) is provided with a first filter layer (25), a second filter layer (26) and a third filter layer (27) in sequence, the left end of the filter box (24) is fixedly connected to a first post-filter pipe (28), the interior of the filter box (24) is connected to the first post-filter pipe (28), the left end of the first post-filter pipe (28) is fixedly connected to an input end of a first water pump (29), the output end of the first water pump (29) is fixedly connected to a second post-filter pipe (30), and the other end of the second post-filter pipe (30) is connected to the interior of the cooling assembly.

4. The three-roller grinding machine with a high-efficiency heat dissipation structure according to claim 1, characterized in that: The cooling component comprises a cooling box (31), the cooling box (31) is arranged on the left side of the water distribution box (38), a cooling box (33) is installed inside the cooling box (31), the interior of the cooling box (33) is connected to the second post-filter pipe (30), a heat dissipation grid (34) is fixedly installed on the left end of the cooling box (33), two fans (32) are symmetrically installed on the right end of the cooling box (31), the upper end of the cooling box (33) is fixedly connected to a first cold water pipe (35), the first cold water pipe (35) is fixedly connected to the input end of a second water pump (36), the output end of the second water pump (36) is fixedly connected to a second cold water pipe (37), and the other end of the second cold water pipe (37) is connected to the interior of the water distribution box (38).

5. The three-roller grinding machine with a high-efficiency heat dissipation structure according to claim 1, characterized in that: A magnet column is arranged above the guide plate (39), and a gap for raw materials to pass through exists between the magnet column and the guide plate (39).

6. The three-roller mill with a high-efficiency heat dissipation structure according to claim 1, characterized in that: The feeding hopper (12) is magnetic.

7. The three-roller grinding machine with a high-efficiency heat dissipation structure according to claim 3, characterized in that: The first filter layer (25) is an activated carbon filter layer, the second filter layer (26) is a stainless steel filter screen, and the third filter layer (27) is an impurity collection filter screen.

Citation Information

Patent Citations

  • Grinding machine

    CN218189855U