Bridge pier column bearing hoop operation platform
By hanging a bracket and a connecting pedal outside the clamp of the bridge pier column and plugging a protective net on the top of the pedal, the problems of complex structure, slow construction speed and insufficient safety in the prior art are solved, and the structure is simple, A bridge pier column load-bearing hoop operation platform with high construction efficiency and sufficient safety.
Patent Information
- Application Number
- CN202421220494.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-05-31
AI Technical Summary
The existing bridge pier column load-bearing hoop operation platform has complex structure, slow construction speed, insufficient safety, inconvenient transportation, and unfavorable for mass production.
By hanging a bracket on the outside of the clamp of the bridge pier column, a continuous pedal is placed on the bracket, and a protective net is inserted on the top of the pedal, and a bolt and nut are connected to a simple structure installation.
The structure of the bridge pier column load-bearing hoop operation platform is simplified, with short installation time, high construction efficiency, stable structure, sufficient safety, low transportation cost, and suitable for mass production.
Smart Images

Figure CN222455843U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge pier column load-bearing clamps, in particular to a bridge pier column load-bearing clamp operating platform. Background Art
[0002] During the construction of bridge piers, it is necessary to set up an operating platform to construct the bridge piers. The traditional method is to use the method of setting up scaffolding to construct the bridge piers, but there are technical difficulties such as long erection time, low efficiency, and high safety risks. For example, if the bridge piers are located in water or in an environment with poor foundation conditions, the construction costs and construction period will be greatly increased. Later, in order to facilitate construction, the load-bearing clamp method was used to set up the operating platform, but the existing bridge pier load-bearing clamp operating platform has a complex structure, slow construction speed, insufficient safety, inconvenient transportation, and is not conducive to mass production. Therefore, in order to avoid the shortcomings of the prior art, it is necessary to improve the prior art. Utility Model Content
[0003] The utility model aims to overcome the shortcomings and deficiencies in the prior art and to provide a bridge pier load-bearing clamp operating platform with a simple structure and high construction efficiency.
[0004] The utility model is realized by the following technical solutions:
[0005] The bridge pier load-bearing clamp operating platform comprises a clamp installed on the bridge pier, a plurality of brackets are hung on the outer side of the clamp, a plurality of connected pedals are placed on the brackets, the pedals are connected by first bolts and first nuts, and a protective net is inserted on the outer side of the top of the pedal.
[0006] Furthermore, a connecting plate is welded on one side of the protective net, and corresponding bolt mounting holes are provided on the connecting plate and the other side of the protective net. The protective nets are connected by a second bolt and a second nut.
[0007] Furthermore, an anti-dropping stopper is provided on the outer side of the bracket.
[0008] Furthermore, a plurality of hooks are provided on the inner side of the bracket, and a hanging piece corresponding to the hooks is provided on the outer side of the clamp.
[0009] Furthermore, the hook and the hanging piece are both plugged with anti-dropping wedges.
[0010] Furthermore, the pedal is hinged with a movable plate via a hinge.
[0011] Furthermore, a handle is provided on the top of the pedal.
[0012] Furthermore, the protective net is provided with a plug-in support tube, and the outer side of the top of the pedal is provided with a plug-in sleeve for the plug-in support tube to be plugged in, and the plug-in sleeve is welded with a skirting board.
[0013] Furthermore, the plug-in sleeve is threadedly connected with a locking screw that presses against the plug-in support tube, and the plug-in sleeve and the plug-in support tube are connected via a third bolt and a third nut.
[0014] Furthermore, the bracket is a triangular bracket.
[0015] Compared with the prior art, the utility model has a plurality of brackets hung on the outside of the clamp, and a plurality of connected pedals are placed on the brackets, and a protective net is inserted on the outside of the top of the pedal, so that the structure of the bridge pier load-bearing clamp operating platform is simple. During installation, the brackets are first hung on the outside of the clamp, and then the pedals are placed on the brackets and connected with bolts and nuts, and then the protective net is inserted into the top of the pedal, and the installation is completed. The erection time is short, the construction efficiency is high, the structure is stable, the safety is sufficient, the packaging and transportation volume is small, the packaging and transportation cost is low, the transportation is convenient, and it is conducive to mass production. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 This is a structural schematic diagram of the bridge pier load-bearing clamp operating platform of the utility model;
[0018] Figure 2 This is a structural exploded view of the bridge pier load-bearing clamp operating platform of the utility model.
[0019] In the figure: 1-bridge pier; 2-hoop; 3-bracket; 4-pedal; 5-protective net; 6-connecting plate; 7-bolt mounting hole; 8-anti-slip block; 9-hook; 10-hanging plate; 11-anti-slip wedge; 12-hinge; 13-movable plate; 14-handle; 15-plug-in support tube; 16-plug-in sleeve; 17-skirting board; 18-locking screw. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] like Figure 1 and Figure 2 The bridge pier column load-bearing clamp operating platform of the utility model shown in the figure comprises a clamp 2 installed on the bridge pier column 1, a plurality of brackets 3 are hung on the outer side of the clamp 2, a plurality of pedals 4 are placed on the brackets 3, the pedals 4 are connected by first bolts and first nuts, and a protective net 5 is inserted on the outer side of the top of the pedal 4. A plurality of brackets 3 are hung on the outer side of the clamp 2, a plurality of pedals 4 are placed on the brackets 3, and a protective net 5 is inserted on the outer side of the top of the pedal 4, so that the structure of the bridge pier column load-bearing clamp operating platform is simple. When installing, the bracket 3 is first hung on the outer side of the clamp 2, and the pedal 4 is placed on the bracket 3 and connected with the bolt and nut, and then the protective net 5 is inserted into the top of the pedal 4, and the installation is completed, the erection time is short, the construction efficiency is high, the structure is stable, the safety is sufficient, the packaging and transportation volume is small, the packaging and transportation cost is low, the transportation is convenient, and it is conducive to mass production.
[0022] A connecting plate 6 is welded to one side of the protective net 5, and corresponding bolt mounting holes 7 are provided on the other side of the connecting plate 6 and the protective net 5. The protective nets 5 are connected by a second bolt and a second nut, which improves the safety of use and facilitates the connection and disassembly of the protective nets 5.
[0023] An anti-dropout block 11 is provided on the outer side of the bracket 3 to prevent the pedal 4 from falling out after being placed, thereby improving the safety of use.
[0024] A plurality of hooks 9 are provided on the inner side of the bracket 3 , and a hanging piece 10 corresponding to the hooks 9 is provided on the outer side of the clamp 2 , so that the bracket 3 can be conveniently hung on the outer side of the clamp 2 .
[0025] The hook 9 and the hanging piece 10 are both plugged with an anti-dropping wedge 11, the hook 9 gradually becomes larger from top to bottom, and the anti-dropping wedge 11 gradually becomes smaller from top to bottom, so as to prevent the bracket 3 from falling out after being hooked on the clamp 2.
[0026] The pedal 4 is hinged with a movable plate 13 through a hinge 12, and the movable plate 13 can be opened to facilitate the upward and downward transmission of materials.
[0027] A handle 14 is provided on the top of the pedal 4 to facilitate carrying of the pedal 4 and to facilitate installation.
[0028] The protective net 5 is provided with a plug-in support tube 15, and the outer side of the top of the pedal 4 is provided with a plug-in sleeve 16 for plugging the plug-in support tube 15, which facilitates the rapid plug-in installation of the protective net 5. The plug-in sleeve 16 is welded with a skirting board 17 to prevent materials from falling from the outer side of the pedal 4.
[0029] The plug-in sleeve 16 is threaded with a locking screw 18 that presses against the plug-in support tube 15, which facilitates the quick locking and installation of the protection net 5. The plug-in sleeve 16 and the plug-in support tube 18 are connected by a third bolt and a third nut, making the installation of the protection net 5 more stable and more convenient to disassemble and assemble.
[0030] As a specific implementation, the bracket 3 is a triangular bracket, which has stable support and low manufacturing cost. In specific implementations, the bracket 3 can also be a bracket of other shapes.
[0031] In a specific implementation, the clamp 2 is a round clamp or a square clamp or a clamp of other shapes.
[0032] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. Bridge pier load-bearing hoop operating platform, characterized by: It comprises a clamp installed on a bridge pier, a plurality of brackets are hung on the outer side of the clamp, a plurality of connected pedals are placed on the brackets, the pedals are connected with each other through a first bolt and a first nut, and a protective net is inserted on the outer side of the top of the pedal.
2. The bridge pier load-bearing clamp operating platform according to claim 1 is characterized by: A connecting piece is welded on one side of the protective net, and corresponding bolt mounting holes are provided on the connecting piece and the other side of the protective net. The protective nets are connected by a second bolt and a second nut.
3. The bridge pier load-bearing clamp operating platform according to claim 1 is characterized by: An anti-dropping stopper is arranged on the outer side of the bracket.
4. The bridge pier load-bearing clamp operating platform according to claim 1 is characterized by: A plurality of hooks are arranged on the inner side of the bracket, and a hanging piece corresponding to the hooks is arranged on the outer side of the clamp.
5. The bridge pier load-bearing clamp operating platform according to claim 4 is characterized in that: The hook and the hanging piece are both plugged with anti-dropping wedges.
6. The bridge pier load-bearing clamp operating platform according to claim 1 is characterized by: The pedal is hinged with a movable plate through a hinge.
7. The bridge pier load-bearing clamp operating platform according to claim 1 is characterized by: A handle is provided on the top of the pedal.
8. The bridge pier load-bearing clamp operating platform according to claim 1 is characterized by: The protective net is provided with a plug-in support pipe, and the outer side of the top of the pedal is provided with a plug-in sleeve for the plug-in support pipe to be plugged in, and the plug-in sleeve is welded with a skirting board.
9. The bridge pier load-bearing hoop operating platform according to claim 8, characterized in that: The plug-in sleeve is threadedly connected with a locking screw that presses against the plug-in support tube, and the plug-in sleeve and the plug-in support tube are connected through a third bolt and a third nut.
10. The bridge pier load-bearing clamp operating platform according to claim 1, characterized in that: The bracket is a triangular bracket.