Large-area concrete timing curing device

By designing a large-area concrete timing maintenance device, using intelligent switch valves and movable water pipe system, timely and timely concrete maintenance is achieved, solving the problem of untimely and inadequate maintenance caused by manual watering, reducing costs and reducing costs The occurrence of concrete shrinkage cracks.

CN222478211UActive Publication Date: 2025-02-14SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420206620.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2025-02-14
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

The existing manual watering and maintenance methods have problems such as negligent missed watering, untimely maintenance, and insufficient maintenance time. When setting up scaffolding, the water pipes are prone to blockage, resulting in insufficient maintenance and may cause concrete shrinkage cracks.

Method used

A large-area concrete timing maintenance device is designed, including a water connection pipe, an intelligent switch valve, a first water access pipe and a second water access pipe. It is connected by a movable connector and multiple water outlet holes are set up. The intelligent switch valve has remote control and The timing switch function realizes timing maintenance.

Benefits of technology

This device can effectively solve the problems of untimely and inadequate maintenance caused by manual watering, reduce labor costs, ensure the timeliness and timeliness of concrete curing, and reduce the occurrence of concrete shrinkage cracks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222478211U_ABST
    Figure CN222478211U_ABST
Patent Text Reader

Abstract

The utility model discloses a large-area concrete timing curing device which comprises a water receiving connecting pipe, one end of the water receiving connecting pipe is connected with the first end of a first water passing pipe through an intelligent switch valve, and the second end of the first water passing pipe is sequentially and axially connected with at least one second water passing pipe in an end-to-end mode. The second water passing pipes are connected through movable connecting pieces, the second water passing pipes and the first water passing pipes are connected through movable connecting pieces, the second water passing pipes can rotate relative to each other, the second water passing pipes and the first water passing pipes can rotate relative to each other, and a plurality of water outlet holes are formed in the outer side walls of the second water passing pipes and the outer side walls of the first water passing pipes. According to the utility model, various problems of the existing manual watering maintenance mode can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a large-area concrete timing curing device. Background Art

[0002] During the construction of a building project, after the concrete is poured, most of the time, manual watering and curing is used, which is easy to implement and has low cost. However, manual watering and curing may cause negligence, missed pouring, untimely curing, and insufficient curing time. In addition, when setting up scaffolding, due to obstacles such as formwork, water pipes may be inserted, detoured, and blocked, making the water pipes too long, which brings inconvenience to workers and makes the curing work difficult, resulting in inadequate curing and, in severe cases, shrinkage cracks in the concrete. Utility Model Content

[0003] The utility model provides a large-area concrete timed curing device, which can solve various problems of the existing artificial watering curing method.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a large-area concrete timed maintenance device, comprising a water connection pipe, one end of the water connection pipe is connected to the first end of a first water pipe through an intelligent switch valve, the second end of the first water pipe is axially connected to at least one second water pipe in sequence, the second water pipes and the second water pipe and the first water pipe are connected by movable connecting parts, so that the second water pipes and the second water pipe and the first water pipe can rotate relative to each other, the outer side walls of the second water pipe and the first water pipe are each provided with a plurality of water outlet holes, the second water pipe and the first water pipe are both movably connected, the second water pipe can be increased or decreased as needed to increase the maintenance area of ​​the concrete, and the intelligent switch valve can be remotely controlled to achieve timed maintenance.

[0005] Preferably, the water outlet holes are evenly arranged on both sides along the axial direction of the second water pipe and the first water pipe, so that water columns can be sprayed over a wide range.

[0006] Preferably, the spacing between the water outlet holes is not less than 20 cm, ensuring that the water sprayed from each water outlet hole can cover all places within the range.

[0007] Preferably, a main water inlet switch is also installed on the water inlet connecting pipe.

[0008] Preferably, a signal receiving module and a timing switch module are provided in the intelligent switch valve, and the signal receiving module can receive remote signals to ensure the timeliness and timing of maintenance.

[0009] Preferably, the water inlet connecting pipe is connected to the main water pipe, and the expansion of the maintenance device is achieved by installing a large number of water inlet connecting pipes.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] It has a simple structure, with an intelligent switch valve and a second water pipe and a first water pipe that can be assembled in a variety of ways. It can meet the needs of large-area concrete maintenance. The intelligent switch valve has a timed switch function, which can open and close the valve to supply water and close the valve at the set time to achieve the purpose of intelligent maintenance. It solves the problem of untimely and inadequate concrete maintenance due to manual watering, reduces labor costs, and at the same time ensures the timeliness and timeliness of concrete maintenance, and plays a better control role in concrete shrinkage cracks. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 This is the main structural diagram of the utility model;

[0013] Figure 2 It is a top view of the structure of the utility model.

[0014] Figure numerals: 1. water connection pipe, 2. main water switch, 3. intelligent switch valve, 4. first water pipe, 5. movable connecting piece, 6. second water pipe, 7. water outlet. DETAILED DESCRIPTION

[0015] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0016] like Figure 1-2 As shown, in order to solve the problem of untimely and inadequate concrete curing due to manual watering, a large-area concrete timed curing device is provided in this embodiment, including a water connection pipe 1, one end of the water connection pipe 1 is connected to the first end of the first water pipe 4 through an intelligent switch valve 3, and the second end of the first water pipe 4 is axially connected to at least one second water pipe 6 in sequence, and the second water pipes 6 and the first water pipe 4 are connected by movable connecting parts 5, so that the second water pipes 6 and the second water pipes 6 and the first water pipes 4 can rotate relative to each other, and the outer walls of the second water pipes 6 and the first water pipes 4 are provided with a plurality of water outlet holes 7, the second water pipes 6 and the first water pipes 4 are both movably connected, the second water pipes 6 can be increased or decreased as needed to increase the curing area of ​​the concrete, and the intelligent switch valve 3 can be remotely controlled to achieve timed curing.

[0017] The movable connecting piece 5 and the second water pipe 6 and the first water pipe 4 are all detachably connected to each other. The second water pipe 6 can be removed to replace water pipes or elbows of different shapes, etc., which is very flexible to use.

[0018] The aperture of the water outlet 7 can be set as required to adjust the area range of spraying and curing.

[0019] In this embodiment, if Figure 1 As shown, the water outlet holes 7 are evenly arranged on both sides along the axial direction of the second water pipe 6 and the first water pipe 4, and water columns can be sprayed over a wide range. The spacing between the water outlet holes 7 is not less than 20 cm, ensuring that the water sprayed from each water outlet hole 7 can cover all places within the range.

[0020] The water connection pipe 1 is also provided with a main water connection switch 2, through which the entire water connection pipe 1 can be controlled to see whether water is flowing in, without the need for remote control using an intelligent switch valve 3.

[0021] In this embodiment, as a specific form of the intelligent switch valve 3, a signal receiving module and a timing switch module are provided in the intelligent switch valve 3. The signal receiving module can receive remote signals to ensure the timeliness and timing of maintenance.

[0022] The water connection pipe 1 is connected to the main water pipe, and the expansion of the maintenance device is achieved by installing a large number of water connection pipes 1.

[0023] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0024] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0025] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

Claims

1. A large area concrete timed curing device, characterized in that: include: A water connection pipe (1), one end of which is connected to a first end of a first water pipe (4) via an intelligent switch valve (3), and a second end of the first water pipe (4) is axially connected to at least one second water pipe (6) in sequence from end to end, and the second water pipes (6) and the first water pipe (4) are connected by movable connecting parts (5) so that the second water pipes (6) and the second water pipes (6) and the first water pipe (4) can rotate relative to each other, and a plurality of water outlet holes (7) are provided on the outer side walls of the second water pipe (6) and the first water pipe (4).

2. The large-area concrete timed curing device according to claim 1 is characterized in that: The water outlet holes (7) are evenly arranged on both sides along the axial direction of the second water pipe (6) and the first water pipe (4).

3. The large-area concrete timed curing device according to claim 2 is characterized in that: The distance between the water outlet holes (7) is not less than 20 cm.

4. The large-area concrete timed curing device according to claim 2 is characterized in that: A main water inlet switch (2) is also installed on the water inlet connecting pipe (1).

5. The large-area concrete timed curing device according to claim 2 is characterized in that: The intelligent switch valve (3) is provided with a signal receiving module and a timing switch module.

6. The large area concrete timed curing device according to claim 2 is characterized in that: The water connection pipe (1) is connected to the main water pipe.