Preheating device for caterpillar band core metal forming die

By designing a preheating device for crawler core metal molding molds, using a preheating furnace and resistive wire heating device to uniformly preheat the mold, the problems of uneven preheating of molds and large workload in the prior art are solved, and the mold is improved resilience and safety.

CN222519889UActive Publication Date: 2025-02-25JIANGXI SAILITE MASCH TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420329751.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2025-02-25
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

The preheating method of existing track core gold molding molds increases the workload of workers, poses safety risks and the mold is unevenly heated.

Method used

A preheating device for track core gold molding mold is designed, including a preheating furnace, a wheeled vehicle body and a fixing component, and the mold is uniformly preheated by a resistive wire heating device.

Benefits of technology

It realizes uniform heating of the mold, improves the toughness of the mold, and reduces the workload and safety risks of workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222519889U_ABST
    Figure CN222519889U_ABST
Patent Text Reader

Abstract

The preheating device comprises a preheating furnace, the front side of the preheating furnace is provided with an opening, and a furnace door and a door lock assembly are arranged in front of the preheating furnace and used for sealing the opening; a resistance wire is arranged in a furnace wall lining of the preheating furnace and communicates with a resistance wire heating device arranged on the outer side of the preheating furnace. An exhaust port with a valve is formed in the top of the preheating furnace and communicates with the interior of the preheating furnace; two rails are arranged at the bottom in the preheating furnace and used for being in sliding connection with a belt wheel vehicle body for containing a mold. The preheating furnace is arranged to heat and preheat the forming die, so that the die is heated uniformly, the toughness of the die is improved, and the die is not easy to break; and the mold can be conveniently placed in the preheating furnace, so that the workload and the safety risk of workers are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of track core metal manufacturing, in particular to a preheating device for a track core metal forming die. Background Art

[0002] The core metal of rubber tracks is generally made by heating cylindrical steel and then sending it into forging equipment for forging. A forming mold is required for forging. The forming mold is brittle and easy to break at room temperature, so it needs to be preheated before use. The existing method generally uses the forging to be processed, that is, the cylindrical steel material heated at high temperature to fit the mold for preheating, but this method increases the workload of workers, has safety risks and uneven heating of the mold. Utility Model Content

[0003] In order to solve the problems that the above-mentioned existing forming mold preheating method increases workload, has safety risks and the mold is heated unevenly, the utility model provides a preheating device for a track core metal forming mold.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A preheating device for a track core metal forming mold comprises a preheating furnace, the front side of the preheating furnace is open, and a furnace door and a door lock assembly are arranged in front of the preheating furnace for closing the opening; a resistance wire is arranged in the inner lining of the furnace wall of the preheating furnace, and is connected with a resistance wire heating device arranged on the outer side of the preheating furnace; an exhaust port with a valve is arranged on the top of the preheating furnace and is connected with the interior thereof; two tracks are arranged at the bottom of the preheating furnace for sliding connection with a wheeled vehicle body on which the mold is placed; a handle is vertically arranged at the front end of the wheeled vehicle body, and slide grooves are arranged on the left and right sides of the handle, and a U-shaped rod is slidably connected through a slider, and support rods are arranged at the bottom of both ends of the U-shaped rod for supporting the front end of the wheeled vehicle body when it is moved out of the preheating furnace; a fixing assembly is arranged on the U-shaped rod for fixing the U-shaped rod in conjunction with the fixing sockets arranged on the upper and lower sides of the handle.

[0006] Preferably, the fixing assembly is mainly composed of a connecting rod, and both ends of the connecting rod are provided with pins that penetrate the U-shaped rod and are used to be plugged into the fixed socket on the handle; an elastic member is provided between the connecting rod and the U-shaped rod, and the elastic member is sleeved on the outside of the pin.

[0007] Preferably, an inner groove is provided at the opening of the preheating furnace, and a boss is provided on the inner side of the furnace door. When the furnace door is closed, the boss is embedded in the inner groove to improve the sealing effect.

[0008] Preferably, rollers are provided at the bottom of the support rod to facilitate moving the wheeled vehicle body out of the preheating furnace to transport the mold.

[0009] Preferably, the bottom of the wheeled vehicle body is grid-shaped, which is convenient for carrying the mold and ensures that the mold is heated evenly.

[0010] Compared with the prior art, the utility model has the following beneficial effects: the utility model preheats the forming mold by setting up a preheating furnace, so that the mold is heated evenly, which improves the toughness of the mold and makes it less likely to break; and the mold can be easily placed in the preheating furnace, reducing the workload and safety risks of workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 This is a schematic diagram of the internal main structure of an embodiment of the utility model;

[0012] Figure 2 This is a schematic diagram of the top view of the vehicle body of an embodiment of the utility model;

[0013] Figure 3 for Figure 2 A is an enlarged schematic diagram.

[0014] In the figure: 1, preheating furnace, 101, inner groove, 2, furnace door, 201, boss, 3, door lock assembly, 4, resistance wire heating device, 5, exhaust port, 6, track, 7, wheeled body, 8, handle, 801, fixed socket, 9, U-shaped rod, 901, slider, 10, support rod, 11, roller, 12, fixed assembly, 1201, latch, 1202, elastic member, 1203, connecting rod. DETAILED DESCRIPTION

[0015] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", "vertical", "horizontal", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0017] like Figures 1 to 3As shown, the embodiment of the utility model includes a preheating furnace 1, which has an opening at the front side, and is provided with a furnace door 2 and a door lock assembly 3 in front for closing the opening; a resistance wire is provided in the furnace wall lining of the preheating furnace 1, and is connected with a resistance wire heating device 4 arranged on the outside of the preheating furnace 1; an exhaust port 5 with a valve is provided on the top of the preheating furnace 1 and is connected with the interior thereof; two tracks 6 are provided at the bottom of the preheating furnace 1 for slidingly connecting a wheeled vehicle body 7 for placing a mold; a handle 8 is vertically provided at the front end of the wheeled vehicle body 7, and slide grooves are provided on the left and right sides of the handle, and a U-shaped rod 9 is slidably connected through a slider 901, and support rods 10 are provided at the bottom of both ends of the U-shaped rod 9, which are used to support the front end of the wheeled vehicle body 7 when it is moved out of the preheating furnace 1; a fixing assembly 12 is provided on the U-shaped rod 9, which is used to fix the U-shaped rod 9 in conjunction with the fixing sockets 801 provided on the upper and lower sides of the handle 8.

[0018] Preferably, the fixing assembly 12 is composed of a connecting rod 1203 as the main body, and both ends of the connecting rod 1203 are provided with pins 1201 that penetrate the U-shaped rod 9 and are used to be plugged into the fixed socket 801 on the handle 8; an elastic member 1202 is provided between the connecting rod 1203 and the U-shaped rod 9, and the elastic member 1202 is sleeved on the outside of the pin 1201.

[0019] When it is necessary to preheat the track core metal forming mold, first open the furnace door 2, and then pull the wheeled vehicle body 7 to move out of the preheating furnace 1 through the handle 8. When the front end of the wheeled vehicle body 7 moves out of the preheating furnace 1, pull the connecting rod 1203 to make the pin 1201 disengage from the fixed socket 801 on the upper side of the handle 8, and the U-shaped rod 9 slides downward through the slider 901, so that the bottom end of the support rod 10 contacts the ground. A roller 11 can also be provided at the bottom of the support rod 10 to facilitate the subsequent pulling of the wheeled vehicle body 7. When the roller 7 contacts the ground, the pin 1201 corresponds to the fixed socket 801 on the upper and lower sides of the handle 8. Under the action of the elastic member 1202, the pin 1201 is inserted into the fixed socket 801, so that the U-shaped rod 9 can be fixed, which plays a supporting role for the front end of the wheeled vehicle body 7.

[0020] Next, place the forming mold on the wheeled vehicle body 7, pull the connecting rod 1203 to disengage the pin 1201 from the lower fixed socket 801, pull the U-shaped rod 9 upward so that the pin 1201 is inserted into the upper fixed socket 801, fix the U-shaped rod 9 and the support rod 10, and then push the wheeled vehicle body 7 and the forming mold thereon into the preheating furnace 1.

[0021] Then the furnace door 2 is closed. An inner groove 101 is provided at the opening of the preheating furnace 1, and a boss 201 is provided on the inner side of the furnace door 2. When the furnace door 2 is closed, the boss 201 is embedded in the inner groove 101 to improve the sealing effect. Then the resistance wire heating device 4 is started, and the resistance wire arranged in the lining of the preheating furnace 1 is energized to increase the temperature in the preheating furnace 1, and the forming mold is preheated to 250°C~300°C, so that the forming mold has more toughness and is not easy to break during the subsequent forging processing.

[0022] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A preheating device for a track core forming die, characterized in that: It comprises a preheating furnace, which has an opening at the front side and is provided with a furnace door and a door lock assembly at the front for closing the opening; a resistance wire is provided in the inner lining of the furnace wall of the preheating furnace, and is connected with a resistance wire heating device arranged on the outer side of the preheating furnace; an exhaust port with a valve is provided on the top of the preheating furnace and is connected with the interior thereof; two tracks are provided at the bottom of the preheating furnace for slidingly connecting a wheeled vehicle body on which a mold is placed; a handle is vertically provided at the front end of the wheeled vehicle body, and slide grooves are provided on the left and right sides of the handle, and a U-shaped rod is slidably connected thereto through a slider, and support rods are provided at the bottom of both ends of the U-shaped rod for supporting the front end of the wheeled vehicle body when it is moved out of the preheating furnace; a fixing assembly is provided on the U-shaped rod for fixing the U-shaped rod in cooperation with the fixing sockets provided on the upper and lower sides of the handle.

2. A preheating device for a track core forming die according to claim 1, characterized in that: The fixing assembly is mainly composed of a connecting rod, and both ends of the connecting rod are provided with pins that penetrate the U-shaped rod and are used to be plugged into the fixing socket on the handle; an elastic member is provided between the connecting rod and the U-shaped rod, and the elastic member is sleeved on the outside of the pin.

3. A preheating device for a track core forming die according to claim 1 or 2, characterized in that: An inner groove is arranged at the opening of the preheating furnace, and a boss is arranged on the inner side of the furnace door. When the furnace door is closed, the boss is embedded in the inner groove to improve the sealing effect.

4. A preheating device for a track core forming die according to claim 3, characterized in that: The bottom of the support rod is provided with a roller, which is convenient for moving the wheeled vehicle body out of the preheating furnace to transport the mold.

5. A preheating device for a track core forming die according to claim 4, characterized in that: The bottom of the wheeled vehicle body is in a grid shape, which is convenient for carrying the mold and allows the mold to be heated evenly.