Pit digging device for green planting

By designing a green planting and pitting device including a vertical frame, a first telescopic component, a drive motor and a drill rod, the existing equipment has been solved inefficient and complex structure in large-scale planting, and efficient and flexible pitting operations and fertilizer delivery are achieved.

CN222532196UActive Publication Date: 2025-02-28WUHAN QIANHU WATER ECOLOGICAL ENVIRONMENT ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421279180.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2025-02-28
Estimated Expiration
2034-06-05

AI Technical Summary

Technical Problem

The existing greening planting and pit-punching equipment is inefficient in large-scale planting, has high labor intensity, and is complex in equipment structure and is not suitable for mobile use.

Method used

A pit punching device including a vertical frame, a first telescopic assembly, a driving motor and a drill rod are designed. The driving motor drives the drill rod and the blades to rotate through the movable end of the first telescopic assembly to realize pit punching, and the precise quantitative delivery of fertilizer is achieved through the electric telescopic rod and the feeding barrel.

Benefits of technology

It improves the efficiency and flexibility of greening planting and pit drilling, is suitable for one person to operate, is convenient to move, and reduces labor intensity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model discloses a pit digging device for green planting, and relates to the technical field of green planting. The first telescopic assembly comprises a fixed end and a movable end which extend up and down, and the fixed end is fixed to the front side of the vertical frame; the driving motor is fixed on the movable end; the drill rod is fixed to the lower end of the driving motor, and spirally-distributed blades are installed on the outer side wall of the drill rod. When the device is used, the device only needs to be erected beside the position needing to be dug, the vertical frame is held, the driving motor drives the drill rod and the blades to rotate when the movable end in the first telescopic assembly moves up and down, digging is achieved, after digging is completed, the vertical frame is lifted again, the device is moved to the next digging point, and the device is convenient to use, flexible to start and high in practicability. The pit digging efficiency of green planting can be improved, and the pit digging device is more suitable for one person to operate and is flexible and convenient to move.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of greening planting, in particular to a hole-digging device for greening planting. Background Art

[0002] Greening planting is an indispensable project for urban and rural construction. It not only adds color to the landscape, but also has great benefits for the soil and environment. In greening planting, many tools are needed, among which pit digging equipment is one of them. However, most greening planting is done manually using shovels and other digging tools, but this method is only suitable for small-scale planting. For large-scale greening planting, it is labor-intensive and costly, and the efficiency is very low.

[0003] The patent with announcement number CN218649218U discloses a pit-digging device for garden greening planting, including a placement plate, two support plates are fixedly installed on the lower surface of the placement plate, and a storage box and a protective cover are fixedly installed on the upper surface of the placement plate; in the utility model, a rotating rod is rotated by a threaded sleeve, so that the ratchet drives the turntable to rotate in the storage box through the ratchet gear, and when the discharge port is aligned with the discharge pipe, the fertilizer in the storage box will flow into the dug pit through the discharge pipe, realizing the automatic spreading function of the garden greening planting pit-digging device, reducing the labor intensity of workers and improving work efficiency. The above patent realizes the mechanization of greening planting pit digging, but the equipment is obviously large, which is more troublesome in the process of moving and carrying, and the equipment structure is complex, not suitable for walking on the land, and lacks flexibility in use. Utility Model Content

[0004] The purpose of the utility model is to provide a hole-digging device for greening planting to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above-mentioned purpose, the utility model provides a pit digging device for greening planting, comprising:

[0006] Stand;

[0007] A first telescopic assembly includes a fixed end and a movable end extending up and down, wherein the fixed end is fixed to the front side of the stand;

[0008] a driving motor, fixed on the movable end; and

[0009] The drill rod is fixed at the lower end of the driving motor, and the outer side wall of the drill rod is provided with blades distributed in a spiral shape.

[0010] Furthermore, the frame includes a vertical pole, a fixed plate and a balance pole, the fixed plate and the balance pole are arranged in parallel and spaced apart on the front side of the vertical pole in the up-down direction, the front end of the fixed plate is fixed to the fixed end of the first telescopic component, the rear end of the fixed plate is fixed to the vertical pole, the front end of the balance pole is fixed to the movable end of the first telescopic component, and the rear end of the balance pole is slidably connected to the vertical pole.

[0011] Furthermore, an electric telescopic rod is installed between the fixing plate and the balancing rod.

[0012] Furthermore, the first telescopic assembly includes:

[0013] A fixed cylinder, wherein a movable groove is formed at the lower end of the fixed cylinder, and a through hole is formed at the upper end of the fixed cylinder, wherein the through hole is connected to the movable groove;

[0014] A movable rod is slidably disposed in the movable groove in an up-down direction; and

[0015] A material receiving cylinder is arranged at the upper end of the fixed cylinder, the upper end of the material receiving cylinder is opened, and the lower end of the material receiving cylinder is connected to the through hole;

[0016] Wherein, the fixed tube constitutes the fixed end, and the movable rod constitutes the movable end.

[0017] Furthermore, a metering cylinder is fixed on the top of the material receiving cylinder, a blocking block is clamped on the inner side of the material receiving cylinder, the blocking block is adapted to the inner size of the material receiving cylinder, and the blocking block is connected to the movable rod via a connecting rod.

[0018] Furthermore, the inner diameter of the material receiving barrel gradually decreases from top to bottom, and the blocking block is clamped in the middle position of the material receiving barrel and fits with the inner wall of the material receiving barrel.

[0019] Furthermore, the diameter of the movable rod is smaller than the inner diameter of the movable groove, at least two sliding blocks are fixed at intervals on the outer side wall of the movable rod, and the sliding blocks are slidably connected to the inner side wall of the movable groove.

[0020] Furthermore, the driving motor and the blades are both located directly below the movable groove, and the inner diameter of the movable groove is larger than the outer diameter of the driving motor.

[0021] Furthermore, a bottom plate is fixed to the bottom of the vertical pole, and the bottom plate is extended to the left and right sides of the vertical pole, and positioning holes are respectively provided on both sides of the bottom plate.

[0022] Compared with the prior art, the beneficial effects of the utility model are:

[0023] When the device is in use, it is only necessary to place the equipment next to the location where a hole needs to be dug, hold the stand, and drive the motor to drive the drill rod and the blades to rotate when the movable end of the first telescopic component moves up and down to achieve hole digging. After the hole digging is completed, lift the stand again and move the equipment to the next hole digging point. The device is easy to use and flexible to start, which helps to improve the efficiency of hole digging for greening planting. It is more suitable for one-person operation and is flexible and convenient to move. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 A schematic diagram of the structure of the pit digging device for greening planting provided by the utility model;

[0025] Figure 2 For this utility model Figure 1 Schematic diagram of the internal structure of the first telescopic component.

[0026] In the figure: 1. stand; 11. pole; 12. fixed plate; 13. balance pole; 14. bottom plate; 141. positioning hole; 2. first telescopic component; 21. fixed cylinder; 211. movable groove; 212. through hole; 22. movable rod; 23. receiving cylinder; 24. blocking block; 25. connecting rod; 26. sliding block; 27. metering cylinder; 3. driving motor; 4. drill rod; 41. blade; 5. electric telescopic rod. DETAILED DESCRIPTION

[0027] See also Figure 1-Figure 2 As shown, the utility model provides a hole-drilling device for greening planting, comprising a stand 1, a first telescopic assembly 2, a drive motor 3 and a drill rod 4. The first telescopic assembly 2 comprises a fixed end and a movable end extending up and down, the fixed end being fixed to the front side of the stand 1; the drive motor 3 being fixed to the movable end; the drill rod 4 being fixed to the lower end of the drive motor 3, and the outer side wall of the drill rod 4 being provided with blades 41 distributed in a spiral shape.

[0028] When the device is in use, it is only necessary to place the device next to the location where a hole needs to be dug, hold the stand 1, and drive the motor 3 to drive the drill rod 4 and the blade 41 to rotate when the movable end of the first telescopic component 2 moves up and down to achieve hole digging. After the hole digging is completed, lift the stand 1 again and move the device to the next hole digging point. The device is easy to use and flexible to start, which helps to improve the efficiency of green planting hole digging. It is more suitable for one-person operation and is flexible and convenient to move.

[0029] Here, the first telescopic assembly 2 may be an electric push rod or a hydraulic telescopic rod.

[0030] Specifically, the stand 1 includes a vertical pole 11, a fixed plate 12 and a balance pole 13. The fixed plate 12 and the balance pole 13 are arranged in parallel and spaced apart in the upper and lower directions on the front side of the vertical pole 11. The front end of the fixed plate 12 is fixed to the fixed end of the first telescopic component 2, the rear end of the fixed plate 12 is fixed to the vertical pole 11, the front end of the balance pole 13 is fixed to the movable end of the first telescopic component 2, and the rear end of the balance pole 13 is slidably connected to the vertical pole 11. The stand 1 has a simple structure and is small and easy to hold.

[0031] Furthermore, an electric telescopic rod 5 is installed between the fixed plate 12 and the balancing rod 13. The electric telescopic rod 5 drives the balancing rod 13 to move up and down, thereby driving the movable end of the first telescopic assembly 2 to move up and down along the fixed end.

[0032] In this embodiment, the first telescopic assembly 2 includes a fixed cylinder 21, a movable rod 22 and a material receiving cylinder 23. A movable groove 211 is provided at the lower end of the fixed cylinder 21, a through hole 212 is provided at the upper end of the fixed cylinder 21, and the through hole 212 is connected with the movable groove 211; the movable rod 22 is slidably arranged in the movable groove 211 along the up-down direction; the material receiving cylinder 23 is arranged at the upper end of the fixed cylinder 21, the upper end of the material receiving cylinder 23 is opened, and the lower end of the material receiving cylinder 23 is connected with the through hole 212; wherein, the fixed cylinder 21 constitutes the fixed end, and the movable rod 22 constitutes the movable end.

[0033] After the hole is dug, during the upward movement of the drill rod 4, by adding fertilizer into the material receiving barrel 23, the fertilizer can fall along the material receiving barrel 23 and through the through hole 212 and the movable groove 211 and fall into the hole.

[0034] Furthermore, a metering cylinder 27 is fixed to the top of the material receiving cylinder 23, a blocking block 24 is clamped on the inner side of the material receiving cylinder 23, the blocking block 24 is adapted to the inner size of the material receiving cylinder 23, and the blocking block 24 is connected to the movable rod 22 via a connecting rod 25.

[0035] When the drill rod 4 digs the hole to the lowest point, the blocking block 24 fits against the inner wall of the material receiving tube 23. At this time, fertilizer is added to the metering tube 27. After the hole is dug, the electric telescopic rod 5 contracts, driving the movable rod 22 to move upward, and then drives the blocking block 24 to move upward through the connecting rod 25. At this time, the blocking block 24 moves upward to open the opening at the upper end of the material receiving tube 23, and the fertilizer will flow down and fall into the pit when the drill rod 4 and the blade 41 are separated from the pit, thereby realizing accurate and quantitative delivery of fertilizer.

[0036] Preferably, the inner diameter of the receiving barrel 23 gradually decreases from top to bottom, and the blocking block 24 is clamped in the middle position of the receiving barrel 23 and fits with the inner wall of the receiving barrel 23. The side walls of the receiving barrel 23 and the blocking block 24 are arranged at an angle to ensure that the blocking block 24 can fit with the inner wall of the receiving barrel 23 only when the drill rod 4 is drilled to the lowest point. At this time, fertilizer is added to the quantitative barrel 27, so that the fertilizer can be added in an orderly and quantitative manner.

[0037] Specifically, the diameter of the movable rod 22 is smaller than the inner diameter of the movable groove 211, and at least two sliding blocks 26 are fixed at intervals on the outer wall of the movable rod 22. The sliding blocks 26 are slidably connected to the inner wall of the movable groove 211, which helps to ensure the stability of the movable rod 22 during the up and down movement, and also ensures that the waste passes through the movable groove 211 smoothly and falls into the prepared pit to avoid being blocked by the movable rod 22 or the sliding blocks 26.

[0038] Specifically, the drive motor 3 and the blade 41 are both located directly below the movable groove 211, and the inner diameter of the movable groove 211 is larger than the outer diameter of the drive motor 3, which helps to ensure that the fertilizer can accurately fall into the prepared pit when falling along the through hole 212 and the movable groove 211.

[0039] Furthermore, a bottom plate 14 is fixed to the bottom of the vertical pole 11 . The bottom plate 14 is extended to the left and right sides of the vertical pole 11 . Positioning holes 141 are respectively provided on both sides of the bottom plate 14 .

[0040] In places where the land environment is uneven, an external fixing cone can be used to pass through the positioning hole 141 and nailed into the soil to fix the base plate 14 next to the pit point, thereby ensuring that the vertical pole 11 remains vertical, thereby improving the stability of the equipment during the pit digging process.

[0041] The above are only preferred specific implementation methods of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, who makes equivalent replacements or changes based on the technical scheme and utility model concept of the utility model, should be covered by the protection scope of the utility model.

Claims

1. A pit digging device for greening planting, characterized in that: include: Stand; A first telescopic assembly includes a fixed end and a movable end extending up and down, wherein the fixed end is fixed to the front side of the stand; a driving motor, fixed on the movable end; and The drill rod is fixed at the lower end of the driving motor, and the outer side wall of the drill rod is provided with blades distributed in a spiral shape.

2. A hole-digging device for greening planting according to claim 1, characterized in that: The frame includes a vertical pole, a fixed plate and a balance pole. The fixed plate and the balance pole are arranged in parallel and spaced apart on the front side of the vertical pole in the up-down direction. The front end of the fixed plate is fixed to the fixed end of the first telescopic component, the rear end of the fixed plate is fixed to the vertical pole, the front end of the balance pole is fixed to the movable end of the first telescopic component, and the rear end of the balance pole is slidably connected to the vertical pole.

3. A hole-digging device for greening planting according to claim 2, characterized in that: An electric telescopic rod is installed between the fixing plate and the balancing rod.

4. A hole-digging device for greening planting according to claim 3, characterized in that: The first telescopic component comprises: A fixed cylinder, wherein a movable groove is formed at the lower end of the fixed cylinder, and a through hole is formed at the upper end of the fixed cylinder, wherein the through hole is connected to the movable groove; A movable rod is slidably disposed in the movable groove in an up-down direction; and A material receiving cylinder is arranged at the upper end of the fixed cylinder, the upper end of the material receiving cylinder is opened, and the lower end of the material receiving cylinder is connected to the through hole; Wherein, the fixed tube constitutes the fixed end, and the movable rod constitutes the movable end.

5. A hole-digging device for greening planting according to claim 4, characterized in that: A quantitative cylinder is fixed on the top of the material receiving cylinder, a blocking block is clamped on the inner side of the material receiving cylinder, the blocking block is adapted to the inner size of the material receiving cylinder, and the blocking block is connected to the movable rod through a connecting rod.

6. A hole-digging device for greening planting according to claim 5, characterized in that: The inner diameter of the material receiving barrel gradually decreases from top to bottom, and the blocking block is clamped at the middle position of the material receiving barrel and fits with the inner wall of the material receiving barrel.

7. A hole-digging device for greening planting according to claim 4, characterized in that: The diameter of the movable rod is smaller than the inner diameter of the movable groove. At least two sliding blocks are fixed at intervals on the outer side wall of the movable rod. The sliding blocks are slidably connected to the inner side wall of the movable groove.

8. The hole-digging device for greening planting according to claim 4, characterized in that: The driving motor and the blades are both located directly below the movable groove, and the inner diameter of the movable groove is greater than the outer diameter of the driving motor.

9. The hole-digging device for greening planting according to claim 2, characterized in that: A bottom plate is fixed to the bottom of the vertical pole, and the bottom plate is extended to the left and right sides of the vertical pole, and positioning holes are respectively arranged on both sides of the bottom plate.