Adsorption tower for industrial waste gas treatment
By designing the processing components of the annular frame and filtering adsorption net in the adsorption tower for industrial waste gas treatment, as well as the use of transparent parts, the problems of inconvenience in replacing the structure of the adsorption tower and difficult to observe internally are solved, rapid replacement and timely cleaning are achieved, and the efficiency of equipment usage and maintenance convenience are improved.
Patent Information
- Application Number
- CN202421188437.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-05-28
AI Technical Summary
During the use of the existing adsorption tower for industrial waste gas treatment, the waste gas treatment structure is inconvenient to replace, and it is difficult to observe the internal situation, and cannot be cleaned in time, which has certain limitations.
An adsorption tower for industrial waste gas treatment is designed, and a treatment component including an annular frame and a filter adsorption net is fixed between the inner surface of the annular frame, and a second hanging lug is uniformly fixedly connected to the upper surface of the annular frame, and a transparent piece is fixedly connected to the peripheral surface of the adsorption tower body for easy observation and cleaning.
It realizes rapid replacement of the adsorption tower structure and observability of the internal conditions, solves the problems of inconvenience and difficulty in cleaning of existing adsorption towers, and improves the efficiency of equipment usage and maintenance convenience.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of industrial waste gas treatment, in particular to an adsorption tower for industrial waste gas treatment. Background Art
[0002] Industrial waste gas refers to the general term for various pollutant gases discharged into the air during fuel combustion and production processes in the factory area of the enterprise. These waste gases include: carbon dioxide, carbon disulfide, hydrogen sulfide, fluoride, nitrogen oxides, chlorine, hydrogen chloride, carbon monoxide, lead and mercury sulfate, beryllium, smoke and production dust. When discharged into the atmosphere, it will pollute the air. Therefore, an adsorption tower is needed to treat the waste gas, but it has the following problems in actual use:
[0003] At present, when the existing adsorption tower for industrial waste gas treatment is in use, the waste gas treatment structure needs to be replaced after a period of use, but it is not convenient to replace it quickly, and there are certain limitations in its use; or when the existing adsorption tower for industrial waste gas treatment is in use, it is generally difficult to see its internal situation, and it is impossible to clean the adsorption tower in time, and there are certain limitations in its use. Therefore, it is necessary to improve an adsorption tower for industrial waste gas treatment to solve the above problems. Utility Model Content
[0004] The utility model aims to provide an adsorption tower for industrial waste gas treatment to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an adsorption tower for industrial waste gas treatment, comprising an adsorption tower assembly, a treatment assembly is placed inside the adsorption tower assembly, and the treatment assembly includes an annular frame and a filter adsorption net, the filter adsorption net is fixedly connected between the inner surfaces of the annular frame, and a second lifting ear is evenly fixedly connected to the upper surface of the annular frame, and a second lifting hole is provided through the middle of the surface of one side of the second lifting ear.
[0006] As a further technical solution of the utility model, the adsorption tower assembly includes an adsorption tower body and a transparent part, and the transparent part is fixedly connected to one side of the circumferential surface of the adsorption tower body, and an annular ring is fixedly connected to the middle of the inner circumferential surface of the adsorption tower body.
[0007] As a further technical solution of the utility model, a downpipe is fixedly connected to the middle of the bottom surface of the adsorption tower body, and a switch valve is fixedly connected to one side of the middle of the peripheral surface of the downpipe.
[0008] As a further technical solution of the utility model, the bottom surface of the adsorption tower body is evenly and fixedly connected with supporting feet, and the supporting feet are fixedly connected to the gasket.
[0009] As a further technical solution of the utility model, a connecting piece is fixedly connected to one side of the lower part of the peripheral surface of the adsorption tower body, and an annular groove is provided on one side surface of the connecting piece, and a sealing ring is placed in the annular groove.
[0010] As a further technical solution of the utility model, the upper end of the adsorption tower assembly is covered with a tower cover assembly, and the tower cover assembly includes a tower cover body and a first lifting ear, the first lifting ear is evenly and fixedly connected to the edge of the upper surface of the tower cover body, and a first lifting hole is penetrated through the middle of the surface of one side of the first lifting ear, and an air outlet pipe is fixedly connected to the middle of the upper surface of the tower cover body.
[0011] Compared with the prior art, the utility model provides an adsorption tower for industrial waste gas treatment, which has the following beneficial effects:
[0012] 1. The adsorption tower for industrial waste gas treatment has the effect of quickly replacing the treatment structure through the processing components set up, which solves the problem that the waste gas treatment structure of the existing adsorption tower for industrial waste gas treatment needs to be replaced after a period of use, but it is not convenient to replace it quickly and there are certain limitations in use.
[0013] 2. The adsorption tower for industrial waste gas treatment has the effect of viewing the internal conditions of the tower through the adsorption tower assembly, which solves the problem that the existing adsorption tower for industrial waste gas treatment is generally difficult to see its internal conditions during use, and the adsorption tower cannot be cleaned in time, which has certain limitations in use. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative labor:
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the tower cover assembly structure of the utility model;
[0017] Figure 3 This is a schematic diagram of the processing component structure of the utility model;
[0018] Figure 4 It is a schematic structural diagram of the adsorption tower assembly of the utility model.
[0019] In the figure: 1. adsorption tower assembly; 11. adsorption tower body; 12. support foot; 13. gasket; 14. downpipe; 15. switch valve; 16. connecting piece; 161. annular groove; 17. sealing ring; 18. annular ring; 19. transparent piece; 2. tower cover assembly; 21. tower cover body; 22. first lifting ear; 221. second lifting hole; 23. air outlet pipe; 3. processing assembly; 31. annular frame; 32. second lifting ear; 321. second lifting hole; 33. filter adsorption net. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] See also Figure 1-4 The utility model provides a technical solution: an adsorption tower for industrial waste gas treatment, comprising an adsorption tower assembly 1, a treatment assembly 3 is placed inside the adsorption tower assembly 1, and the treatment assembly 3 comprises an annular frame 31 and a filter adsorption net 33, the filter adsorption net 33 is fixedly connected between the inner surfaces of the annular frame 31, and a second hanging ear 32 is evenly fixedly connected to the upper surface of the annular frame 31, and a second hanging hole 321 is provided through the middle of one side surface of the second hanging ear 32; the adsorption tower assembly 1 comprises an adsorption tower body 11 and a transparent member 19, and the transparent member 19 is fixedly connected to one side of the peripheral surface of the adsorption tower body 11, and an annular ring 18 is fixedly connected to the middle of the inner peripheral surface of the adsorption tower body 11; a downpipe 14 is fixedly connected to the middle of the bottom surface of the adsorption tower body 11, and a switch valve 15 is fixedly connected to one side of the middle of the peripheral surface of the downpipe 14; a support leg 12 is evenly fixedly connected to the bottom surface of the adsorption tower body 11, and the support leg 12 is fixedly connected to the gasket 13;
[0023] Working principle: When the adsorption tower for industrial waste gas treatment is in use, the exhaust pipe for transporting industrial waste gas is connected to the connecting piece 16, and the industrial waste gas can be discharged into the adsorption tower body 11. The waste gas rises and passes through the treatment component 3. The filter adsorption net 33 in the treatment component 3 will adsorb and filter the toxic and harmful gases in the waste gas, and then the purified waste gas is discharged through the outlet pipe 23. When it is necessary to observe the inside of the adsorption tower body 11, it is only necessary to observe the internal situation to a certain extent through the transparent part 19, so as to clean the inside of the adsorption tower body 11 in time, and use a hook to hook into the second hanging hole 321. The external driving structure applies a force to drive the treatment component 3 to rise, so as to take out the treatment component 3 for cleaning or replacement. It is relatively convenient and practical, and it is worth promoting vigorously.
[0024] Among them Figure 4 As shown, a connector 16 is fixedly connected to one side of the lower part of the peripheral surface of the adsorption tower body 11, and an annular groove 161 is provided on one side surface of the connector 16, and a sealing ring 17 is placed in the annular groove 161; specifically, placing the sealing ring 17 in the annular groove 161 can effectively prevent water leakage.
[0025] Among them Figure 2 As shown, the upper end of the adsorption tower assembly 1 is covered with a tower cover assembly 2, and the tower cover assembly 2 includes a tower cover body 21 and a first lifting ear 22, the first lifting ear 22 is evenly and fixedly connected to the edge of the upper surface of the tower cover body 21, and a first lifting hole 221 is penetrated through the middle of the surface of one side of the first lifting ear 22, and an air outlet pipe 23 is fixedly connected to the middle of the upper surface of the tower cover body 21; specifically, the tower cover assembly 2 can be lifted by using a hook clamped on the first lifting hole 221 and applying a vertical upward force.
[0026] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
Claims
1. An adsorption tower for industrial waste gas treatment, characterized in that: The invention comprises an adsorption tower component (1), wherein a processing component (3) is placed inside the adsorption tower component (1), and the processing component (3) comprises an annular frame (31) and a filtering adsorption net (33), wherein the filtering adsorption net (33) is fixedly connected between the inner surfaces of the annular frame (31), and a second lifting ear (32) is evenly fixedly connected to the upper surface of the annular frame (31), and a second lifting hole (321) is provided through the middle of one side surface of the second lifting ear (32).
2. The adsorption tower for industrial waste gas treatment according to claim 1, characterized in that: The adsorption tower assembly (1) comprises an adsorption tower body (11) and a transparent member (19), wherein the transparent member (19) is fixedly connected to one side of the circumferential surface of the adsorption tower body (11), and an annular ring (18) is fixedly connected to the middle of the inner circumferential surface of the adsorption tower body (11).
3. The adsorption tower for industrial waste gas treatment according to claim 2, characterized in that: A lower liquid pipe (14) is fixedly connected to the middle of the bottom surface of the adsorption tower body (11), and a switch valve (15) is fixedly connected to one side of the middle of the peripheral surface of the lower liquid pipe (14).
4. The adsorption tower for industrial waste gas treatment according to claim 2, characterized in that: The bottom surface of the adsorption tower body (11) is evenly and fixedly connected with supporting feet (12), and the supporting feet (12) are fixedly connected to the gasket (13).
5. The adsorption tower for industrial waste gas treatment according to claim 2, characterized in that: A connecting piece (16) is fixedly connected to one side of the lower part of the peripheral surface of the adsorption tower body (11), and an annular groove (161) is provided on one side surface of the connecting piece (16), and a sealing ring (17) is placed in the annular groove (161).
6. The adsorption tower for industrial waste gas treatment according to claim 1, characterized in that: The upper end of the adsorption tower assembly (1) is covered with a tower cover assembly (2), and the tower cover assembly (2) comprises a tower cover body (21) and a first lifting lug (22), the first lifting lug (22) being evenly fixedly connected to the edge of the upper surface of the tower cover body (21), and a first lifting hole (221) is provided through the middle of one side surface of the first lifting lug (22), and an air outlet pipe (23) is fixedly connected to the middle of the upper surface of the tower cover body (21).