Building carbon neutralization treatment device
By designing a building carbon neutralization treatment device including a treatment box, a liquid storage box, a spray chamber and an adsorption chamber, the problem of large volume of existing devices and inconvenient replacement of filler layers is solved, and efficient carbon neutralization treatment and convenient filler layer replacement are achieved.
Patent Information
- Application Number
- CN202420583068.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-03-25
AI Technical Summary
The existing carbon neutralization treatment device for construction in the construction of the existing building is large in size due to the design of the liquid storage chamber and the spray chamber, and the reabsorbing chamber is located on the top of the device, making it inconvenient to replace the filler layer.
A carbon neutralization treatment device for building including a treatment box, a liquid storage tank, a spray chamber and an adsorption chamber are designed. The spray chamber and the adsorption chamber are connected through a through-pipe. A vortex tube and a shunt tube are arranged at the bottom of the spray chamber. A filler layer and a through-air hole are arranged in the adsorption chamber, and the box door is convenient for the replacement of the filler layer.
Through the dual treatment structure, the degree of purification of building waste gas is improved, the device volume is reduced, the cost is reduced, and the filler layer is replaced easily, which improves the practicality of the device.
Smart Images

Figure CN222567351U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction waste gas treatment, in particular to a carbon neutralization treatment device for buildings. Background Art
[0002] Carbon neutrality refers to carbon emission reduction, among which reducing carbon dioxide emissions is an important way to achieve "carbon neutrality". During the construction process, a lot of waste gas containing carbon dioxide will inevitably be generated. If these waste gases containing carbon dioxide are not treated and directly discharged into the atmosphere, the total carbon emissions will exceed the standard and cannot meet the relevant environmental protection requirements.
[0003] For example, a construction carbon neutrality emission treatment device with publication number CN215027551U is provided. By providing a primary absorption tank with a spray chamber and a liquid storage chamber, a spiral conveying pipe with a vent is provided in the liquid storage chamber, a gas uniform distribution plate 2 and a gas uniform distribution plate 1 are provided in the spray chamber, and a secondary absorption box with a packing layer is provided. This facilitates carbon neutrality emission treatment of waste gas containing carbon dioxide during construction. However, in order to allow the waste gas to fully contact with the reaction liquid, the device is provided with a relatively high liquid storage chamber and a spray chamber, which makes the device relatively large in size. In addition, a secondary absorption box is provided above the spray chamber. The secondary absorption box is located at the top of the device, which is very inconvenient when replacing the packing layer inside it. For this reason, a carbon neutrality treatment device for buildings is proposed for improvement. Utility Model Content
[0004] The purpose of the present invention is to solve at least one of the above technical deficiencies.
[0005] To this end, one purpose of the present invention is to propose a building carbon neutralization treatment device to solve the problems mentioned in the background technology and overcome the shortcomings of the prior art.
[0006] In order to achieve the above-mentioned purpose, an embodiment of the utility model provides a building carbon neutralization treatment device, including a treatment box, a liquid storage tank is arranged on the top of the treatment box, a spray chamber and an adsorption chamber are arranged in the treatment box, a through pipe is arranged between the spray chamber and the adsorption chamber, an air intake pipe is arranged on one side of the spray chamber, a vortex pipe is fixedly connected to the bottom end of the air intake pipe, a diverter pipe is fixedly connected to the top of the vortex pipe, a drain pipe is arranged at the bottom of the spray chamber, and a spray shower is arranged at the upper part of the spray chamber;
[0007] The processing box is provided with a box door at the position of the adsorption chamber, a plurality of partitions are provided in the adsorption chamber, a packing layer is provided between the partitions, an air hole is provided at one end of the partition, and an exhaust pipe is provided at one side of the adsorption chamber.
[0008] Preferably, any of the above solutions is that the bottom of the processing tank is provided with supporting feet, and one side of the liquid storage tank is provided with a water inlet pipe.
[0009] Preferably, in any of the above schemes, a blocking plate is provided between the spray chamber and the adsorption chamber, and the through pipe is provided above the blocking plate.
[0010] The above technical solution is adopted: the treatment box provides space for carbon neutralization treatment work, and the legs set at the bottom support it to ensure its stability. The liquid storage tank set on the top of the treatment box is used to store alkaline absorption liquid to provide absorption liquid for the spray component. The water inlet pipe can easily add absorption liquid to the liquid storage tank. The spray chamber is used for spray absorption work, and the adsorption chamber is used for subsequent adsorption work. The two work together to make the building waste gas undergo double treatment and improve the purification degree of the building waste gas after treatment.
[0011] Preferably, any of the above schemes is that valves are provided on the air inlet pipe, the drain pipe and the exhaust pipe, and the vortex pipe is fixed at the bottom of the spray chamber.
[0012] Preferably, any of the above schemes has a plurality of diversion pipes which are evenly arranged on the vortex tube, and a pipe connected to a liquid storage tank is provided at the upper end of the spray shower.
[0013] The above technical solution is adopted: the air inlet pipe is used to input the construction waste gas to be treated into the device. The vortex tube moves the construction waste gas to be treated to various positions at the bottom of the spray chamber, and the diverter pipe discharges the construction waste gas in the vortex tube and disperses the construction waste gas to various positions in the spray chamber. The spray shower can evenly spray the absorption liquid in the storage tank to various positions in the spray chamber. When using, first turn on the spray shower to spray a certain amount of absorption liquid into the spray chamber, and then input the construction waste gas to be treated into the air inlet pipe. The waste gas passes through the vortex tube and enters the spray chamber from the diverter pipe. The gas and the absorption liquid are fully in contact in the spray chamber, and the absorption liquid absorbs the carbon dioxide in the waste gas.
[0014] Preferably, any of the above schemes is provided with a handle on the box door, and solid sodium hydroxide particles are provided in the packing layer.
[0015] Preferably, any of the above schemes is that the air holes are arranged at the bottom and top of the corresponding partition in sequence from left to right and in this cycle.
[0016] The above technical solution is adopted: the box door can facilitate the staff to replace the packing layer in the adsorption chamber. After the construction waste gas is treated in the spray chamber, it enters the adsorption chamber through the through pipe, and passes through each packing layer and the air holes in turn. Since the air holes are arranged in a cycle at the bottom and top of the partition, the gas flow route in the adsorption chamber is S-shaped, and the residual carbon dioxide in the gas is absorbed and reacted by the sodium hydroxide solid particles in the packing layer, realizing the carbon neutralization treatment of the construction waste gas. The gas is finally discharged from the exhaust pipe.
[0017] Compared with the prior art, the advantages and beneficial effects of the utility model are:
[0018] 1. The carbon neutralization treatment device for buildings is provided with structures such as a treatment box, a liquid storage tank, a spray chamber, and an adsorption chamber. When in use, first open the spray shower to spray a certain amount of absorption liquid into the spray chamber, and then input the building waste gas to be treated into the air inlet pipe. The waste gas passes through the vortex tube and enters the spray chamber from the diversion pipe. The gas and the absorption liquid are fully in contact in the spray chamber, and the absorption liquid absorbs the carbon dioxide in the waste gas. After the building waste gas is treated in the spray chamber, it enters the adsorption chamber through the through pipe, and passes through each packing layer and the air holes in turn. Since the air holes are arranged in a cycle at the bottom and top of the partition, the gas flow route in the adsorption chamber is S-shaped, and the residual carbon dioxide in the gas is absorbed and reacted by the sodium hydroxide solid particles in the packing layer, so as to realize the carbon neutralization treatment of the building waste gas. The gas is finally discharged from the exhaust pipe. Through reasonable structural design, the volume of the device is greatly reduced, the cost of the device is reduced, and the practicality is stronger.
[0019] 2. The building carbon neutralization treatment device is equipped with a box door at the position of the adsorption chamber. After a period of use, the sodium hydroxide solid particles in the packing layer react fully with the carbon dioxide, and the packing layer needs to be replaced. At this time, the packing layer can be replaced by opening the box door, which is more convenient to use.
[0020] Additional aspects and advantages of the present invention will be given in part in the following description and in part will become apparent from the following description or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0022] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0023] Figure 2 It is a schematic diagram of the cutaway structure of the utility model;
[0024] Figure 3 It is a schematic diagram of the structure of the vortex tube of the utility model.
[0025] In the figure: 1-treatment box, 2-liquid storage box, 3-spray chamber, 4-adsorption chamber, 5-through pipe, 6-inlet pipe, 7-vortex pipe, 8-diverter pipe, 9-drain pipe, 10-spray shower, 11-box door, 12-partition, 13-packing layer, 14-air hole, 15-exhaust pipe. DETAILED DESCRIPTION
[0026] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0027] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0028] like Figures 1 to 3 As shown, the utility model comprises a treatment box 1, a liquid storage box 2 is arranged on the top of the treatment box 1, a spray chamber 3 and an adsorption chamber 4 are arranged in the treatment box 1, a through pipe 5 is arranged between the spray chamber 3 and the adsorption chamber 4, an air inlet pipe 6 is arranged on one side of the spray chamber 3, a vortex tube 7 is fixedly connected to the bottom end of the air inlet pipe 6, a diversion pipe 8 is fixedly connected to the top of the vortex tube 7, a drain pipe 9 is arranged at the bottom of the spray chamber 3, and a spray shower 10 is arranged on the upper part of the spray chamber 3;
[0029] The processing box 1 is provided with a box door 11 at the position of the adsorption chamber 4. A plurality of partitions 12 are provided in the adsorption chamber 4. A packing layer 13 is provided between the partitions 12. An air hole 14 is provided at one end of the partition 12. An exhaust pipe 15 is provided on one side of the adsorption chamber 4.
[0030] Embodiment 1: A support leg is provided at the bottom of the treatment box 1, and a water inlet pipe is provided on one side of the liquid storage tank 2. A sealing plate is provided between the spray chamber 3 and the adsorption chamber 4, and a through pipe 5 is provided above the sealing plate. The treatment box 1 provides space for carbon neutralization treatment work, and the support leg provided at the bottom thereof supports it to ensure its stability. The liquid storage tank 2 provided at the top of the treatment box 1 is used to store alkaline absorption liquid so as to provide absorption liquid for the spray assembly. The water inlet pipe can facilitate the addition of absorption liquid into the liquid storage tank 2. The spray chamber 3 is used for spray absorption work, and the adsorption chamber 4 is used for subsequent adsorption work. The cooperation of the two allows the building waste gas to undergo dual treatment, thereby improving the degree of purification of the building waste gas after treatment.
[0031] Embodiment 2: Valves are provided on the air inlet pipe 6, the drain pipe 9 and the exhaust pipe 15, and the vortex pipe 7 is fixed at the bottom of the spray chamber 3. There are several diverter pipes 8 and they are evenly arranged on the vortex pipe 7, and a pipe connected to the liquid storage tank 2 is provided at the upper end of the spray shower 10. The air inlet pipe 6 is used to input the construction waste gas to be treated into the device. The vortex pipe 7 moves the construction waste gas to be treated to various positions at the bottom of the spray chamber 3, and the diverter pipe 8 discharges the construction waste gas in the vortex pipe 7 and disperses the construction waste gas to various positions in the spray chamber 3. The spray shower 10 can evenly spray the absorption liquid in the liquid storage tank 2 to various positions in the spray chamber 3. When in use, first open the spray shower 10 to spray a certain amount of absorption liquid into the spray chamber 3, and then input the construction waste gas to be treated into the air inlet pipe 6, the waste gas passes through the vortex pipe 7 and enters the spray chamber 3 from the diverter pipe 8, the gas and the absorption liquid are fully in contact in the spray chamber 3, and the absorption liquid absorbs the carbon dioxide in the waste gas.
[0032] Embodiment 3: A handle is provided on the box door 11, and solid particles of sodium hydroxide are provided in the packing layer 13. The air holes 14 are arranged at the bottom and top of the corresponding partition 12 from left to right and circulate in this way. The box door 11 can facilitate the staff to replace the packing layer 13 in the adsorption chamber 4. After the construction waste gas is treated in the spray chamber 3, it enters the adsorption chamber 4 through the through pipe 5, and passes through each packing layer 13 and the air holes 14 in turn. Since the air holes 14 are arranged in a cycle at the bottom and top of the partition 12, the gas flow route in the adsorption chamber 4 is S-shaped, and the residual carbon dioxide in the gas is absorbed and reacted by the solid particles of sodium hydroxide in the packing layer 13, so as to achieve carbon neutralization treatment of the construction waste gas. The gas is finally discharged from the exhaust pipe 15.
[0033] The working principle of the utility model is as follows:
[0034] S1. Turn on the spray shower 10 to spray a certain amount of absorption liquid into the spray chamber 3, and then input the waste gas to be treated into the air inlet pipe 6. The waste gas passes through the vortex pipe 7 and enters the spray chamber 3 from the diversion pipe 8. The gas and the absorption liquid are fully contacted in the spray chamber 3, and the absorption liquid absorbs the carbon dioxide in the waste gas;
[0035] S2. After the construction waste gas is treated in the spray chamber 3, it enters the adsorption chamber 4 through the through pipe 5, and passes through each packing layer 13 and the air holes 14 in sequence. Since the air holes 14 are arranged cyclically at the bottom and top of the partition 12, the gas flow route in the adsorption chamber 4 is S-shaped, and the residual carbon dioxide in the gas is absorbed and reacted by the sodium hydroxide solid particles in the packing layer 13, so as to achieve carbon neutralization treatment of the construction waste gas;
[0036] S3. After a period of use, the solid sodium hydroxide particles in the packing layer 13 react fully with the carbon dioxide, and the packing layer 13 needs to be replaced. At this time, the box door 11 can be opened to replace the packing layer 13.
[0037] Compared with the prior art, the present invention has the following beneficial effects:
[0038] 1. The carbon neutralization treatment device for buildings is provided with structures such as a treatment box 1, a liquid storage tank 2, a spray chamber 3, and an adsorption chamber 4. When in use, the spray shower 10 is first turned on to spray a certain amount of absorption liquid into the spray chamber 3, and then the building waste gas to be treated is input into the air inlet pipe 6. The waste gas passes through the vortex tube 7 and enters the spray chamber 3 from the diverter pipe 8. The gas and the absorption liquid are fully in contact in the spray chamber 3, and the absorption liquid absorbs the carbon dioxide in the waste gas. After the building waste gas is treated in the spray chamber 3, it enters the adsorption chamber 4 through the through pipe 5, and passes through each packing layer 13 and the air hole 14 in turn. Since the air hole 14 is arranged cyclically at the bottom and top of the partition 12, the route of the gas flowing in the adsorption chamber 4 is S-shaped, and the residual carbon dioxide in the gas is absorbed and reacted by the sodium hydroxide solid particles in the packing layer 13, so as to realize the carbon neutralization treatment of the building waste gas. The gas is finally discharged from the exhaust pipe 15. Through reasonable structural design, the volume of the device is greatly reduced, the cost of the device is reduced, and the practicality is stronger.
[0039] 2. The building carbon neutralization treatment device is provided with a box door 11 at the position of the adsorption chamber 4. After being used for a period of time, the sodium hydroxide solid particles in the packing layer 13 react fully with the carbon dioxide, and the packing layer 13 needs to be replaced. At this time, the box door 11 can be opened to replace the packing layer 13, which is more convenient to use.
Claims
1. A building carbon neutralization treatment device, comprising a treatment box (1); characterized in that: A liquid storage tank (2) is arranged on the top of the treatment box (1), a spray chamber (3) and an adsorption chamber (4) are arranged in the treatment box (1), a through pipe (5) is arranged between the spray chamber (3) and the adsorption chamber (4), an air inlet pipe (6) is arranged on one side of the spray chamber (3), a vortex tube (7) is fixedly connected to the bottom end of the air inlet pipe (6), a diversion pipe (8) is fixedly connected to the top of the vortex tube (7), a drainage pipe (9) is arranged at the bottom of the spray chamber (3), and a spray shower (10) is arranged on the top of the spray chamber (3); The treatment box (1) is provided with a box door (11) at the position of the adsorption chamber (4), a plurality of partitions (12) are provided in the adsorption chamber (4), a packing layer (13) is provided between the partitions (12), an air hole (14) is provided at one end of the partition (12), and an exhaust pipe (15) is provided on one side of the adsorption chamber (4).
2. A building carbon neutralization treatment device as claimed in claim 1, characterized in that: The bottom of the processing box (1) is provided with supporting feet, and one side of the liquid storage box (2) is provided with a water inlet pipe.
3. A building carbon neutralization treatment device as claimed in claim 2, characterized in that: A blocking plate is provided between the spray chamber (3) and the adsorption chamber (4), and the through pipe (5) is provided above the blocking plate.
4. A building carbon neutralization treatment device as claimed in claim 3, characterized in that: The air inlet pipe (6), the drain pipe (9) and the exhaust pipe (15) are all provided with valves, and the vortex pipe (7) is fixed at the bottom of the spray chamber (3).
5. A building carbon neutralization treatment device as claimed in claim 4, characterized in that: There are a plurality of diversion pipes (8) which are evenly arranged on the vortex tube (7), and a pipeline connected to the liquid storage tank (2) is provided at the upper end of the spray shower (10).
6. A building carbon neutralization treatment device as claimed in claim 5, characterized in that: The box door (11) is provided with a handle, and the packing layer (13) is provided with sodium hydroxide solid particles.
7. A building carbon neutralization treatment device as claimed in claim 6, characterized in that: The air holes (14) are arranged in sequence from left to right at the bottom and top of the corresponding partition (12) in a cycle.
Citation Information
Patent Citations
Carbon neutralization emission treatment device for building construction
CN215027551U