Integrated clamping and dry hanging system for split bricks

By using square steel pipe columns, angle steel beams and stamped dry-hanging plate card structures in the split brick dry-hanging system, the high cost and inconvenience of construction caused by excessive pendant density is solved, and the economical, convenient and reliable fixed installation of split bricks is achieved.

CN222595391UActive Publication Date: 2025-03-11XIAMEN JINGZHU NEW MATERIAL TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323465075.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2025-03-11
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

In the existing split brick dry hanging system, the pendant density is too high, resulting in high cost and inconvenient construction.

Method used

Square steel pipe columns and angle steel beams are used to fix multiple dry-hanging plates. Multiple lower-mounted cards and upper-mounted cards are arranged on the dry-hanging plates. An integrated structure is formed by stamping and forming, and the split brick card is installed between the cards, and the elastic deformation of the card is used to achieve the clamping of the split brick.

Benefits of technology

It reduces the cost expenditure of pendants, simplifies the construction process, improves the construction speed and convenience, and ensures that the split bricks are fixed reliably and not easy to fall off.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222595391U_ABST
    Figure CN222595391U_ABST
Patent Text Reader

Abstract

The utility model provides an integrated clamping and dry hanging system for split bricks. The split brick integrated clamping dry hanging system comprises a square steel tube stand column and further comprises a plurality of dry hanging plates and a plurality of split bricks, the dry hanging plates are made of stainless steel, a plurality of angle steel cross beams are fixedly installed on the square steel tube stand column, any dry hanging plate is fixedly installed on the corresponding angle steel cross beam, and the split bricks are fixedly installed on the square steel tube stand column. A plurality of lower hanging clamping pieces and a plurality of upper hanging clamping pieces are arranged on the dry hanging plate, the lower hanging clamping pieces, the upper hanging clamping pieces and the dry hanging plate are of an integrated structure, and the split bricks are clamped between the corresponding lower hanging clamping pieces and the corresponding upper hanging clamping pieces. The split brick integrated clamping and dry hanging system has the advantages that the cost of hanging pieces can be reduced, the construction convenience and speed can be improved, and the split bricks can be fixed reliably.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building decoration, in particular to a split brick integrated clamping dry hanging system. Background Art

[0002] Ceramic brick products, represented by red brick effects, have been used in the construction market for many years and are deeply loved by designers and owners. They are warm and simple, timeless, and their unique charm and historical sense are difficult to replace with other building materials. With the improvement of advanced architectural concepts, the requirements for wall insulation and energy saving are increasing year by year. Building exterior walls generally need to increase insulation measures. In this way, split bricks are pasted on the insulation layer. Over time, the bricks will fall off. Therefore, it is difficult to use the traditional wet-paste method for split bricks for exterior decoration.

[0003] At present, most of the methods used in the market are to solve the above problems by hanging ceramic tiles dryly. There are two common methods of hanging tiles. One is to use the long aluminum beam upper and lower slot type based on the mature stone material, and the other is the installation process of ceramic plate back groove dry-shaped pendants. However, the commonly used specifications of ceramic tiles are generally 60×240 mm, and the size of a single plate is about one-tenth of the conventional stone ceramic plate curtain wall material. This will result in the former dry hanging method making the aluminum beam arrangement density too high, and the other dry hanging method will also lead to the aluminum alloy pendant density being too high, and the number of pendants and keels per unit area will increase several times, and the cost will remain high.

[0004] Therefore, it is necessary to provide a new split brick integrated clamping dry hanging system to solve the above technical problems. Utility Model Content

[0005] The technical problem solved by the utility model is to provide a split brick integrated clamping dry hanging system which can reduce the cost of hanging parts, is beneficial to improving the convenience and speed of construction, and can reliably fix the split bricks.

[0006] In order to solve the above technical problems, the utility model provides a split brick integrated clamping dry hanging system, including: square steel tube columns, multiple dry hanging plates and multiple split bricks, multiple angle steel beams are fixedly installed on the square steel tube columns, any one of the dry hanging plates is fixedly installed on the corresponding angle steel beams, multiple lower hanging cards and multiple upper hanging cards are arranged on the dry hanging plates, and the multiple lower hanging cards and the multiple upper hanging cards are an integral structure with the dry hanging plates, and the multiple split bricks are clamped between the corresponding lower hanging cards and the upper hanging cards.

[0007] Preferably, the dry hanging board includes a main hanging board and two lateral ribs, the two lateral ribs are respectively arranged on both sides of the main hanging board and are an integral structure with the main hanging board, and the lower hanging card and the upper hanging card are both opened on the main hanging board.

[0008] Preferably, a plurality of mounting holes are formed on the two lateral ribs, self-tapping screws are provided in the mounting holes, and the self-tapping screws are threadedly connected to the angle steel beam.

[0009] Preferably, the lower hanging card and the upper hanging card are both formed by stamping.

[0010] Compared with the related art, the split brick integrated clamping dry hanging system provided by the utility model has the following beneficial effects:

[0011] ① Multiple upper and lower mounting cards for fixing the split bricks are formed on a dry-hanging board by stamping, which can greatly reduce the cost of the hanging parts;

[0012] ②With multiple installation methods:

[0013] Unit installation: The split bricks are mounted on a single dry hanging board to form an independent pre-assembled unit, and then the pre-assembled units are installed one by one on the transverse angle steel beam of the curtain wall to achieve unit assembly. After the split bricks on the outer edge of the card unit of each pre-assembled unit are installed on the angle steel beam and fixed, they are re-installed to complete the overall installation;

[0014] Conventional installation: install and fix the dry hanging panels one by one on the angle steel beams of the curtain wall in the order from bottom to top; then clamp and install the split bricks one by one in the order from bottom to top to complete the overall installation;

[0015] The installation process is simple, efficient and fast, which can greatly improve the speed of on-site construction;

[0016] ③ The lower clamping point on the lower hanging card is first deeply clamped into the lower clamping slot of the split brick, and the split brick is erected. The elastic deformation of the lower hanging card is used to form an interaction force between the lower clamping slot of the split brick and the card, so as to limit the lower clamping slot of the split brick; the upper clamping point on the upper hanging card is clamped into the upper clamping slot of the split brick, and the upper clamping point is clamped between the two end clamping strips to form a limit constraint on the upper hanging card;

[0017] The lower card is first inserted into the lower notch of the tile, and the tile is erected. The elastic deformation of the card forms an interaction force between the lower notch of the tile and the card, which limits the position of the lower notch of the tile. The card at the upper card position of the tile is inserted into the small horizontal groove of the upper notch of the tile, forming a limit constraint on the card;

[0018] Through the above method, the resilience of the upper hanging card and the lower hanging card can firmly clamp the split brick, ensuring that natural force cannot affect the force of the upper hanging card and the lower hanging card, ensuring that the brick can be clamped and not fall off. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 A front structural schematic diagram of a preferred embodiment of the split brick integrated clamping dry hanging system provided by the utility model;

[0020] Figure 2 for Figure 1 The three-dimensional structural schematic diagram of the dry hanging board shown;

[0021] Figure 3 A schematic side structural view of a preferred embodiment of the split brick integrated clamping dry hanging system provided by the utility model;

[0022] Figure 4 for Figure 1 A partial enlarged schematic diagram is shown;

[0023] Figure 5 for Figure 1 A top view of the dry hanging board.

[0024] Numbers in the figure: 1. Square steel pipe column; 2. Angle steel beam; 3. Dry hanging board; 4. Lower hanging card; 5. Upper hanging card; 6. Split brick; 7. Installation hole; 401. Lower card point; 501. Upper card point; 601. Upper card slot; 602. Lower card slot. DETAILED DESCRIPTION

[0025] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.

[0026] Please refer to Figure 1-Figure 5 ,in, Figure 1 A front structural schematic diagram of a preferred embodiment of the split brick integrated clamping dry hanging system provided by the utility model; Figure 2 for Figure 1 The three-dimensional structural schematic diagram of the dry hanging board shown; Figure 3 A schematic side structural view of a preferred embodiment of the split brick integrated clamping dry hanging system provided by the utility model; Figure 4 for Figure 1 A partial enlarged schematic diagram is shown; Figure 5 for Figure 1A top view of the dry hanging board. The split brick integrated clamping dry hanging system includes: a plurality of square steel tube columns 1, three angle steel beams 2 are fixedly mounted on the square steel tube columns 1, a plurality of dry hanging boards 3 and a plurality of split bricks 6, the dry hanging boards 3 are made of stainless steel, any one of the dry hanging boards 3 is fixedly mounted on the corresponding angle steel beam 2, the dry hanging board 3 includes a main hanging board and two lateral ribs, the two lateral ribs are respectively arranged on both sides of the main hanging board, and are an integral structure with the main hanging board 3, the lateral ribs can increase the force of the upper hanging card 5 and the lower hanging card 4, the two lateral ribs are provided with a plurality of mounting holes 7, the mounting holes 7 are provided with self-tapping screws, the self-tapping screws are connected to the angle steel beam thread 2, and a plurality of lower hanging cards 4 and a plurality of upper hanging cards are arranged on the main scraper of the dry hanging board 3. 5, and a plurality of lower hanging cards 4 and a plurality of upper hanging cards 5 are an integral structure with the dry hanging board 3, and are all formed by stamping. A plurality of split bricks 6 are all clamped between the corresponding lower hanging cards 4 and the upper hanging cards 5, and an upper clamping slot 601 and a lower clamping slot 602 are provided on the split brick 6. An upper clamping point 501 for clamping into the upper clamping slot 601 is provided on the upper hanging card 5, and a lower clamping point 401 for clamping into the lower clamping slot 602 is provided on the lower hanging card 4. Two end clamping strips are provided on the inner wall of the upper clamping slot 601 away from the dry hanging board 3, and the upper clamping point 501 extends to the bottom of one of the end clamping strips away from one end of the dry hanging board 3. The bottom ends of the two lateral ribs are integrally formed with connecting ears, which are connected to the upper and lower dry hanging boards 3.

[0027] In this embodiment, the lower hanging card 4 and the plurality of upper hanging cards 5 have a certain elastic force. After the upper clamping point 501 on the upper hanging card 5 is clamped into the upper clamping slot 601 of the split brick, and the lower clamping point 401 on the lower hanging card 4 is clamped into the lower clamping slot 602, the rear wall plate of the split brick is firmly clamped by utilizing the reverse rebound force. The plurality of lower hanging cards 4 and the plurality of upper hanging cards 5 are stamped and formed on the dry hanging plate 3 as a whole in a connected state, forming a group of installation units in an integrated state, which can greatly reduce the cost of the hanger. Each clamping point is stamped and formed by the same set of molds, and the positioning of the clamping point is accurate, ensuring the installation accuracy of the ceramic tile.

[0028] In this embodiment, when the split brick 6 is installed on the dry hanging board 3, the lower clamping point 401 on the lower hanging card 4 is first embedded in the lower clamping slot 602 of the split brick 6. As the split brick 6 is vertically erected from the inclined state, it will be clamped by the lower clamping slot 602 of the split brick 6 to produce an angle deformation. At this time, the spring sheet here produces a reverse rebound force. As the card deforms, when the ceramic brick is in the vertical state, the upper end of the middle vertical edge of the lower hanging card 4 (that is, the rear end of the lower clamping point 401) ) is firmly clamped with one side of the split brick 6 to firmly clamp the split brick 6. Due to the deformation and rebound characteristics of the lower hanging card 4, the front end of the lower clamping point 401 is also clamped with the front inner wall of the lower clamping slot 602. In this way, the front and rear ends of the lower clamping point 401 are completely pressed against the front and rear inner walls of the lower clamping slot 602 respectively, thereby realizing the clamping function of the lower end of the split brick 6; when the split brick 6 is erected to an upright state, the upper hanging card 5 uses a caliper to clamp the upper clamping point 501 The upper clamping point 501 is forcibly inserted into the upper clamping groove 601 of the splitting brick 6, and the front end of the upper clamping point 501 is embedded in the lower part of the upper end clamping strip in the upper clamping groove 601. The end clamping strip will limit the front end of the upper clamping point 501, so that it cannot rebound freely. On the contrary, the deformation rebound force of the upper clamping point 501 forms a clamping effect on the splitting brick 6, and they restrict each other to achieve the clamping effect on the upper end of the splitting brick 6. Two end clamping strips are set. This is to take into account that there will be dimensional deviations in the splitting brick 6 after firing and forming. If the splitting brick 6 is scaled, the front end of the upper clamping point 501 is stuck at the bottom of the end clamping strip located above, and the force will be relatively loose. Therefore, it is necessary to press the front end of the upper clamping point 501 downward into the bottom position of the lower end clamping strip to ensure that the upper end of the splitting brick 6 can be firmly clamped. The height of the front end of the upper clamping point 501 from the upper end of the splitting brick 6 is set to 2-3mm to absorb the height limit deviation of the splitting brick 6.

[0029] In this embodiment, when installing the split bricks 6, multiple dry-hanging panels 3 can be spliced ​​together in advance and fixed on the angle steel beam 2, and then the split bricks 6 can be assembled on the dry-hanging panels 3 to form a dry-hanging unit, and then the dry-hanging unit is fixed on the corresponding square steel pipe column 1. Some split bricks 6 that need to be installed between two adjacent dry-hanging units can be installed after the two dry-hanging units are fixed. Since the split bricks 6 can be pre-assembled on the dry-hanging panels 3, it has the advantages of efficient and fast construction. When a split brick 6 is damaged, it only needs to be removed, and then a new split brick 6 of the same size can be installed, and replacement can be easily achieved.

[0030] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A split brick integrated clamping dry hanging system, comprising square steel pipe columns, characterized in that: It also includes multiple dry-hanging panels and multiple split bricks, multiple angle steel beams are fixedly installed on the square steel pipe columns, any one of the dry-hanging panels is fixedly installed on the corresponding angle steel beams, multiple lower hanging cards and multiple upper hanging cards are provided on the dry-hanging panels, and multiple lower hanging cards and multiple upper hanging cards are an integrated structure with the dry-hanging panels, multiple split bricks are clamped between the corresponding lower hanging cards and upper hanging cards, upper clamping slots and lower clamping slots are provided on the split bricks, the upper hanging cards are provided with upper clamping points for clamping into the upper clamping slots, and the lower hanging cards are provided with lower clamping points for clamping into the lower clamping slots, and two end clamping strips are provided on the inner wall of the upper clamping slot on one side away from the dry-hanging panel, and the upper clamping point extends to the bottom of one of the end clamping strips away from one end of the dry-hanging panel.

2. The split brick integrated clamping dry hanging system according to claim 1 is characterized in that: The dry hanging board includes a main hanging board and two lateral ribs, the two lateral ribs are respectively arranged on both sides of the main hanging board and are an integral structure with the main hanging board, and the lower hanging card and the upper hanging card are both opened and arranged on the main hanging board.

3. The split brick integrated clamping dry hanging system according to claim 2 is characterized in that: A plurality of mounting holes are provided on the two lateral ribs, and self-tapping screws are provided in the mounting holes, and the self-tapping screws are threadedly connected to the angle steel beam.

4. The split brick integrated clamping dry hanging system according to claim 2 is characterized in that: The lower hanging card and the upper hanging card are both formed by stamping.

Citation Information

Cited By

  • Integrated clamping and dry hanging system for split bricks

    CN117758956A