Construction engineering building climbing frame

By designing integrated building climbing frames, including walkway plates, ladders, lift boxes and conveying boxes, the problem of insufficient flexibility and convenience of climbing facilities in the existing technology is solved, flexible climbing and convenient material transportation is achieved, suitable for small-scale construction applications and promote repetitive use.

CN222614794UActive Publication Date: 2025-03-14SHANDONG RUIXIANG DECORATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421307288.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-03-14
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

During the application of existing climbing support facilities for construction projects, the lack of integrated climbing facilities is possible, resulting in poor flexibility and convenience and is not conducive to repetitive use.

Method used

A construction climbing frame for construction engineering is designed, including several walkway plates, ladders, lifting boxes and conveying boxes. Through the integrated design of these components, the functions of workers' flexible climbing and convenient material transportation are realized.

Benefits of technology

It realizes the integrated climbing facilities to adapt to small-scale construction applications, improves flexibility and convenience, facilitates repetitive use, and makes material transportation more convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222614794U_ABST
    Figure CN222614794U_ABST
Patent Text Reader

Abstract

The utility model discloses a building climbing frame for constructional engineering, which relates to the technical field of constructional engineering, and comprises a plurality of walkway plates, the walkway plates are uniformly distributed along the vertical direction, the walkway plates are mutually connected through upright posts, a ladder stand is fixedly arranged between the adjacent walkway plates, U-shaped plates are symmetrically arranged on two sides of the walkway plates, and lifting boxes are arranged on the inner sides of the U-shaped plates. A conveying box is arranged at the upper end of the walkway plate, and the conveying box can do reciprocating rectilinear motion in the horizontal direction; the climbing device is suitable for small-range construction operation application through the integrated climbing device, application is flexible and convenient, repeated use is facilitated, and in addition, material conveying is convenient and fast.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a construction engineering building climbing frame. Background Art

[0002] Construction projects refer to the engineering entities formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, living, learning, and public activities. During the construction of construction projects, the use of building climbing facilities is required for workers to perform climbing operations.

[0003] In the application process of existing climbing support facilities for construction projects, scaffolding is basically built by cooperating with horizontal and vertical steel pipes and fasteners. There is a lack of integrated climbing facilities to adapt to small-scale construction operations. The flexibility and convenience of application are poor, and it is not conducive to repeated use.

[0004] In view of the above problems, the utility model provides a construction engineering building climbing frame. Utility Model Content

[0005] The purpose of the utility model is to provide a construction engineering building climbing frame, which is adapted to small-scale construction operations through integrated climbing facilities, has flexibility and convenience in application, is conducive to repeated use, and is convenient for material transportation, thereby solving the problems in the background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering building climbing frame, comprising a plurality of walkway boards, the walkway boards are evenly distributed in the vertical direction, the walkway boards are connected to each other by columns, ladders are fixed between adjacent walkway boards, U-shaped boards are symmetrically arranged on both sides of the walkway boards, a lifting box is arranged on the inner side of the U-shaped board, the lifting box can be lifted vertically, a conveying box is arranged on the upper end of the walkway board, and the conveying box can move back and forth linearly horizontally.

[0007] Furthermore, the four corners of the walkway plate are fastened and connected by columns, and the ladders are staggered and inclined along the vertical direction.

[0008] Furthermore, the lower end of the U-shaped plate is fixedly connected to the side of the walkway plate, and the side plates are fixedly connected on both sides of the lifting box. A first screw rod and a guide rod are respectively arranged inside the side plates. Both ends of the guide rod are fixedly connected to the inner end surface of the U-shaped plate. A first motor is fixedly installed on the inner bottom surface of the U-shaped plate. The upper end of the first screw rod is rotatably connected to the inner top surface of the U-shaped plate through a bearing, and the lower end is fixedly connected to the output end of the first motor. The first screw rod is threadedly connected to one of the side plates, and the guide rod is slidably connected to the other side plate.

[0009] Furthermore, a rectangular groove is opened on one side of the upper end of the walkway plate, a second motor is fixedly installed on the inner wall of the rectangular groove, a second screw rod is fixedly connected to the output end of the second motor, the second screw rod is rotatably connected to the inner wall of the rectangular groove through a bearing at one end away from the second motor, a slider is fixedly connected to the bottom end of the conveying box, the middle part of the slider is threadedly connected to the second screw rod, the slider is slidably connected to the inner side of the rectangular groove, and the bottom end of the conveying box is in contact with the upper end of the walkway plate.

[0010] Furthermore, universal wheels are fixedly installed at the four corners of the bottom end of the lowest layer of the walkway board.

[0011] Furthermore, the lower end of the outer side of the U-shaped plate is fixedly connected to the bottom plate, and positioning pins are movably provided at both ends of the inside of the bottom plate.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0013] The utility model provides a construction engineering building climbing frame. Workers can go back and forth on each walkway board by climbing the ladder. Materials are placed in a lifting box. The lifting box is lifted vertically to transport materials to each walkway board. Materials are placed in a conveying box. The conveying box can reciprocate horizontally to transport materials to any position on the walkway board. The purpose of this design is to adapt to small-scale construction operations through an integrated climbing facility. It is flexible and convenient to use, conducive to repeated use, and convenient for material transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0015] Figure 2 It is a front structural schematic diagram of the utility model;

[0016] Figure 3 This is a schematic diagram of the internal structure of the walkway plate in the utility model;

[0017] Figure 4 It is a schematic diagram of the structure of the lifting box in the utility model.

[0018] In the figure: 1. walkway board; 2. column; 3. ladder; 4. U-shaped board; 5. first screw rod; 6. guide rod; 7. first motor; 8. lifting box; 9. side plate; 10. rectangular groove; 11. second screw rod; 12. second motor; 13. slider; 14. conveying box; 15. universal wheel; 16. bottom plate; 17. positioning pin. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] In order to solve the problem of how to effectively construct in a small area, such as Figure 1-4 As shown, the following preferred technical solutions are provided:

[0021] A construction engineering building climbing frame includes a plurality of walkway boards 1, which are evenly distributed in the vertical direction and connected to each other by columns 2. Ladders 3 are fixed between adjacent walkway boards 1. U-shaped boards 4 are symmetrically arranged on both sides of the walkway boards 1. A lifting box 8 is arranged on the inner side of the U-shaped board 4, and the lifting box 8 can be lifted vertically. A conveying box 14 is arranged on the upper end of the walkway board 1, and the conveying box 14 can move back and forth linearly horizontally.

[0022] Specifically, workers can go back and forth on each walkway board 1 by climbing the ladder 3. Materials are placed in the lifting box 8. The lifting box 8 is lifted vertically to transport materials to each walkway board 1. Materials are placed in the conveying box 14. The conveying box 14 can reciprocate horizontally to transport materials to any position on the walkway board 1. The purpose of this design is to adapt to small-scale construction operations through integrated climbing facilities, which are flexible and convenient to use, and are conducive to repeated use. In addition, material transportation is convenient.

[0023] Further, such as Figure 1 and Figure 2 As shown, the following preferred technical solutions are provided:

[0024] The four corners of the walkway board 1 are fastened together by the columns 2, and the ladders 3 are staggered and tilted in the vertical direction. The purpose of this design is to make the walkway boards 1 integrated and freely reciprocating between them.

[0025] Further, such as Figure 1-4 As shown, the following preferred technical solutions are provided:

[0026] The lower end of the U-shaped plate 4 is fixedly connected to the side of the walkway plate 1, and the side plates 9 are fixedly connected on both sides of the lifting box 8. The first screw rod 5 and the guide rod 6 are respectively arranged inside the side plates 9. Both ends of the guide rod 6 are fixedly connected to the inner end surface of the U-shaped plate 4. The first motor 7 is fixedly installed on the inner bottom surface of the U-shaped plate 4. The upper end of the first screw rod 5 is rotatably connected to the inner top surface of the U-shaped plate 4 through a bearing, and the lower end is fixedly connected to the output end of the first motor 7. The first screw rod 5 is threadedly connected to one of the side plates 9, and the guide rod 6 is slidably connected to the other side plate 9. The purpose of this design is that the first motor 7 drives the first screw rod 5 to rotate, thereby driving the lifting box 8 to rise and fall vertically.

[0027] Further, such as Figure 1-3 As shown, the following preferred technical solutions are provided:

[0028] A rectangular groove 10 is opened on one side of the upper end of the walkway plate 1, and a second motor 12 is fixedly installed on the inner wall of the rectangular groove 10. A second screw rod 11 is fixedly connected to the output end of the second motor 12. The second screw rod 11 is rotatably connected to the inner wall of the rectangular groove 10 at one end away from the second motor 12 through a bearing. A slider 13 is fixedly connected to the bottom end of the conveying box 14. The middle part of the slider 13 is threadedly connected to the second screw rod 11. The slider 13 is slidably connected to the inner side of the rectangular groove 10, and the bottom end of the conveying box 14 is in contact with the upper end of the walkway plate 1. The purpose of this design is that the second motor 12 drives the second screw rod 11 to rotate, and then drives the conveying box 14 to reciprocate horizontally through the slider 13.

[0029] Further, such as Figure 1 As shown, the following preferred technical solutions are provided:

[0030] Universal wheels 15 are fixedly installed at the four corners of the bottom end of the lowest layer of the walkway board 1. The purpose of this design is to facilitate the movement and position fixing of the building climbing frame.

[0031] Further, such as Figure 1 As shown, the following preferred technical solutions are provided:

[0032] The lower end of the outer side of the U-shaped plate 4 is fixedly connected with a bottom plate 16, and positioning nails 17 are movably provided at both ends of the bottom plate 16. The purpose of this design is to insert the positioning nails 17 into the ground, which can further improve the overall stability of the device.

[0033] In summary, workers can go back and forth on each floor of the walkway board 1 by climbing the ladder 3. Materials are placed in the lifting box 8. The lifting box 8 is lifted vertically to transport materials to each floor of the walkway board 1. Materials are placed in the conveying box 14. The conveying box 14 can reciprocate horizontally to transport materials to any position of the walkway board 1. The purpose of this design is to adapt to small-scale construction operations through integrated climbing facilities, which are flexible and convenient to use, conducive to repeated use, and convenient material transportation.

[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction engineering building climbing frame, characterized by: The invention comprises a plurality of walkway plates (1), wherein the walkway plates (1) are evenly distributed in the vertical direction, the walkway plates (1) are connected to each other through columns (2), ladders (3) are fixedly arranged between adjacent walkway plates (1), U-shaped plates (4) are symmetrically arranged on both sides of the walkway plates (1), a lifting box (8) is arranged inside the U-shaped plate (4), and the lifting box (8) can be lifted vertically, and a conveying box (14) is arranged at the upper end of the walkway plate (1), and the conveying box (14) can reciprocate horizontally.

2. A construction engineering building climbing frame according to claim 1, characterized in that: The four corners of the walkway plate (1) are fastened together by means of columns (2), and the ladders (3) are staggered and inclined in a vertical direction.

3. A construction engineering building climbing frame according to claim 1, characterized in that: The lower end of the U-shaped plate (4) is fixedly connected to the side of the walkway plate (1), and the two sides of the lifting box (8) are fixedly connected to the side plates (9). The side plates (9) are respectively provided with a first screw rod (5) and a guide rod (6). Both ends of the guide rod (6) are fixedly connected to the inner end surface of the U-shaped plate (4). A first motor (7) is fixedly installed on the inner bottom surface of the U-shaped plate (4). The upper end of the first screw rod (5) is rotatably connected to the inner top surface of the U-shaped plate (4) through a bearing, and the lower end is fixedly connected to the output end of the first motor (7). The first screw rod (5) is threadedly connected to one of the side plates (9), and the guide rod (6) is slidably connected to the other side plate (9).

4. A construction engineering building climbing frame according to claim 1, characterized in that: A rectangular groove (10) is provided on one side of the upper end of the walkway plate (1), a second motor (12) is fixedly mounted on the inner wall of the rectangular groove (10), a second screw rod (11) is fixedly connected to the output end of the second motor (12), an end of the second screw rod (11) away from the second motor (12) is rotatably connected to the inner wall of the rectangular groove (10) through a bearing, a slider (13) is fixedly connected to the bottom end of the conveying box (14), a middle part of the slider (13) is threadedly connected to the second screw rod (11), the slider (13) is slidably connected to the inner side of the rectangular groove (10), and the bottom end of the conveying box (14) is in contact with the upper end of the walkway plate (1).

5. A construction engineering building climbing frame according to claim 1, characterized in that: Universal wheels (15) are fixedly mounted at the four corners of the bottom end of the lowest layer of the walkway plate (1).

6. A construction engineering building climbing frame according to claim 1, characterized in that: The lower end of the outer side of the U-shaped plate (4) is fixedly connected to a bottom plate (16), and positioning pins (17) are movably provided at both ends of the inside of the bottom plate (16).