By introducing technical means such as adjusting components and hydraulic rods into construction scaffolding, the adjustment of the length and height of the scaffolding is achieved, solving the problem of inability to adapt to different working heights in the prior art, and improving construction efficiency and adaptability.
Patent Information
- Application Number
- CN202421267185.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-06-05
AI Technical Summary
When used in actual use, existing construction scaffolding cannot perform operations at different heights and cannot perform superimposed installation heights, which makes it inconvenient to improve construction efficiency and adaptability.
A construction scaffolding is designed to realize the adjustment of the length and height of the scaffolding by adjusting the settings of components, hydraulic rods, connecting components, pedals, extension plates and limiting components.
This design improves the adaptability and use efficiency of the scaffolding, and can be quickly adjusted according to different working positions and heights, avoiding the problem of inefficiency in construction caused by fixed lengths and heights.
Smart Images

Figure CN222632768U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of scaffolds, in particular to a scaffold for building construction. Background Art
[0002] Scaffolding is a working platform set up to ensure the smooth progress of each construction process. According to the location of the scaffolding, it can be divided into external scaffolding and internal scaffolding; according to different materials, it can be divided into wooden scaffolding, bamboo scaffolding, and steel pipe scaffolding; according to the structural form, it can be divided into vertical pole scaffolding, bridge scaffolding, door scaffolding, suspended scaffolding, hanging scaffolding, cantilever scaffolding, and climbing scaffolding. Different types of engineering construction use scaffolding for different purposes.
[0003] When the existing construction scaffolding is actually used, different lengths of work need to be performed. If the length of the scaffolding is fixed, when working in other positions, it is necessary to get down and move to the scaffolding, which is not convenient for improving the work efficiency of the construction.
[0004] After searching the existing patents: a construction scaffold (publication number: CN219298707U), in which the support platform arranged inside the installation shell is used to bear the weight. When the scaffold is in use, the weight sensor will detect the generated weight. If it exceeds the set overload value, the observation light will light up to remind the user that it is overloaded, so as to avoid the danger of the scaffold falling down due to overload.
[0005] Although the above patent has achieved the function of reminding personnel of overload, in actual use, the scaffolding needs to be operated at different heights and cannot be installed at stacked heights, which is not convenient for improving the adaptability of the scaffolding.
[0006] Therefore, it is necessary to invent a kind of building construction scaffold to solve the above problems. Utility Model Content
[0007] 1. Technical issues to be solved
[0008] The technical problem solved by the utility model is to provide a construction scaffolding which is highly practical, can be simply operated and has a relatively simple structure. It solves the problem raised in the above background technology that in actual use, the scaffolding needs to be operated at different heights and cannot be installed at stacked heights, which makes it difficult to improve the adaptability of the scaffolding.
[0009] (II) Technical solution
[0010] To achieve the above purpose, the utility model is implemented through the following technical solutions: a building construction scaffold, including a reinforcement plate, two groups of adjustment components are fixedly connected to the surface of the reinforcement plate, one end of the adjustment component is fixedly connected to a hydraulic rod, one end of the hydraulic rod is fixedly connected to a connecting component, one side of one group of the connecting components is fixedly connected to a support frame A, and one side of the other group of the connecting components is fixedly connected to a support frame B, the surfaces of the support frames A and B are both clamped with fixing components, one end of one of the fixing components is fixedly connected to a pedal, one end of the pedal is provided with a slide groove, an extension plate is slidably connected inside the slide groove, both sides of the extension plate are fixedly connected to limit assemblies, the top surfaces of the support frames A and B are plugged with card columns, the top of the card columns is fixedly connected with a protective assembly, the support frames A, B and one side of the card columns are all provided with connecting grooves, the interior of the connecting groove is clamped with a fixed sleeve column, the interior of the fixed sleeve column is provided with three card beads, and the inner bottom wall of the fixed sleeve column is fixedly connected with a pressing assembly.
[0011] As a further solution of the utility model, the adjustment assembly includes an adjustment frame fixedly connected to the surface of the reinforcement plate, and the adjustment frame is rotatably connected to an adjustment column inside, which is convenient for adjusting the angle of the hydraulic rod support.
[0012] As a further solution of the utility model, the connecting assembly includes a connecting column fixedly connected to one end of the hydraulic rod, and a connecting plate is rotatably connected to the surface of the connecting column, which is convenient for fixing with the support frame A and the support frame B.
[0013] As a further solution of the utility model, the fixing assembly includes clamping rings that are clamped on the surfaces of support frame A and support frame B, and fixing holes are opened at both ends of the clamping ring. The internal threads of the fixing holes are connected with fixing bolts, which facilitate tightening the clamping rings.
[0014] As a further solution of the utility model, the limit assembly includes limit bolts fixedly connected to both sides of the extension plate, and the surfaces of the limit bolts are threadedly connected to limit nuts, which facilitate fixing the extension plate.
[0015] As a further solution of the utility model, both sides of the pedal are provided with limit grooves, the limit grooves are matched with the limit bolts, and the limit grooves are convenient for adjusting the length of the extension plate.
[0016] As a further solution of the utility model, the pressing assembly includes a spring fixedly connected to the inner bottom wall of the fixed sleeve column, one end of the spring is fixedly connected to a pressure column, one end of the pressure column is fixedly connected to a storage column, one end of the storage column is fixedly connected to a pressing column, and the pressing column facilitates the opening and disassembly of the scaffolding.
[0017] As a further solution of the utility model, three clamping holes are opened on the surface of the fixed sleeve column, and the clamping holes are adapted to clamping beads, and the clamping beads facilitate the interconnection of the constructed scaffolds.
[0018] (III) Beneficial effects
[0019] The utility model provides a building construction scaffold, which has the following beneficial effects:
[0020] 1. The construction scaffolding is arranged by adjusting components, hydraulic rods, connecting components, pedals, extension plates and limit components. When in use, the limit nut is turned according to the length of the construction operation position, and the position of the sliding limit bolt inside the limit groove is determined. After the limit nut is tightened, the length of the hydraulic rod and the angle inside the adjustment frame are adjusted, so as to achieve the effect of adjusting the construction length of the scaffolding, avoiding the situation in which some operations require too long a fixed length during construction operations, and the scaffolding needs to be moved and climbed again to work after a certain length is completed, thereby improving work efficiency and increasing the adaptability of the scaffolding.
[0021] 2. The construction scaffold is arranged with clamping beads, fixed sleeve columns, pressing components and clamping columns. When in use, the scaffold is built and installed according to the construction height, the clamping columns are inserted into the top ends of the support frames A and B, and then the pressing columns are pressed down. The clamping beads are received in the storage columns, and the fixed sleeve columns are inserted into the connecting grooves. The pressing columns are released, the spring elastic force is restored, and the pressing columns squeeze the clamping beads through the clamping holes, thereby achieving the effect of building the clamping columns and the support frames A and B, avoiding the inability to quickly limit the height of the scaffold and improving the connection stability of the scaffold. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0023] Figure 2 This is a schematic diagram of the structure of the limit assembly of the utility model;
[0024] Figure 3 This is a schematic diagram of the structure of the adjustment component of the utility model;
[0025] Figure 4 This is a schematic diagram of the structure of the pressing component of the utility model;
[0026] Figure 5 This is a schematic diagram of the structure of the protective component of the utility model.
[0027] In the figure: 1. reinforcement plate; 2. adjustment component; 201. adjustment frame; 202. adjustment column; 3. hydraulic rod; 4. connection component; 401. connection column; 402. connection plate; 5. support frame A; 6. support frame B; 7. fixing component; 701. clamping ring; 702. fixing bolt; 8. stepping pedal; 9. extension plate; 10. limit component; 1001. limit bolt; 1002. limit nut; 11. clamping column; 12. protection component; 1201. support column; 1202. guardrail; 1203. lifting column; 1204. extension column; 1205. adjustment bolt; 13. fixing sleeve column; 14. clamping bead; 15. pressing component; 1501. spring; 1502. pressure column; 1503. storage column; 1504. pressing column. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] See also Figures 1 to 5The utility model provides a technical solution: a building construction scaffold, including a reinforcement plate 1, two groups of adjustment components 2 are fixedly connected to the surface of the reinforcement plate 1, one end of the adjustment component 2 is fixedly connected to a hydraulic rod 3, one end of the hydraulic rod 3 is fixedly connected to a connecting component 4, one side of one group of connecting components 4 is fixedly connected to a support frame A5, and one side of the other group of connecting components 4 is fixedly connected to a support frame B6, the surfaces of the support frames A5 and B6 are both clamped with fixing components 7, one end of one of the fixing components 7 is fixedly connected to a pedal 8, one end of the pedal 8 is provided with a slide groove, and the internal sliding connection of the slide groove An extension plate 9 is connected, and both sides of the extension plate 9 are fixedly connected to the limit assembly 10. By adjusting the assembly 2, the hydraulic rod 3, the connecting assembly 4, the pedal 8, the extension plate 9 and the limit assembly 10, when in use, according to the length of the construction operation position, the limit nut 1002 is turned, and the position of the sliding limit bolt 1001 inside the limit groove is determined. After the position is determined and the limit nut 1002 is tightened, the length of the hydraulic rod 3 and the angle inside the adjustment frame 201 are adjusted, thereby achieving the effect of adjusting the length of the scaffolding, avoiding the situation in which some operations require too long a length and the fixed length is too long. The scaffolding needs to be moved after a certain length is completed, and then it can be climbed up again to work, which improves the work efficiency and increases the adaptability of the scaffolding. The top surfaces of the support frames A5 and B6 are plugged with a card column 11, and the top of the card column 11 is fixedly connected with a protective component 12. The support frames A5, B6 and one side of the card column 11 are all provided with a connecting groove, and the interior of the connecting groove is clamped with a fixed sleeve column 13, and the interior of the fixed sleeve column 13 is provided with three clamping beads 14. The inner bottom wall of the fixed sleeve column 13 is fixedly connected with a pressing component 15, and the card beads 14, the fixed sleeve column 13, the pressing component 15 and the card column 11 are arranged When in use, the scaffold is built and installed according to the construction height, the card column 11 is inserted into the top of the support frame A5 and the support frame B6, and then the pressing column 1504 is pressed, the spring 1501 is pressed downward, the card bead 14 is received in the storage column 1503, and the fixed sleeve column 13 is inserted into the connection groove, the pressing column 1504 is released, the elastic force of the spring 1501 is restored, and the pressure column 1502 squeezes the card bead 14 through the card hole, thereby achieving the effect of building the card column 11 and the support frame A5 and the support frame B6, avoiding the scaffold height can not quickly plug limit, improve the connection stability of the scaffold;
[0030] See also Figure 3 The adjustment assembly 2 includes an adjustment frame 201 fixedly connected to the surface of the reinforcement plate 1, and an adjustment column 202 is rotatably connected inside the adjustment frame 201. Through the setting of the adjustment assembly 2, the angle of the hydraulic rod 3 is adjusted;
[0031] See also Figure 3The connection assembly 4 includes a connection column 401 fixedly connected to one end of the hydraulic rod 3, and a connection piece 402 is rotatably connected to the surface of the connection column 401. Through the setting of the connection assembly 4, it plays a role of connection support;
[0032] See also Figure 2 The fixing assembly 7 includes a clamping ring 701 which is clamped on the surface of the support frame A5 and the support frame B6. Both ends of the clamping ring 701 are provided with fixing holes. The internal threads of the fixing holes are connected with fixing bolts 702. The setting of the fixing assembly 7 plays a fixing role;
[0033] See also Figure 2 The limiting assembly 10 includes limiting bolts 1001 fixedly connected to both sides of the extension plate 9, and the surface of the limiting bolts 1001 is threadedly connected to the limiting nuts 1002. Through the setting of the limiting assembly 10, the length of the scaffolding is adjusted;
[0034] See also Figure 2 , both sides of the pedal 8 are provided with limit grooves, and the limit grooves are adapted to the limit bolts 1001. Through the setting of the pedal 8, the construction workers can step on it;
[0035] See also Figure 3 The pressing assembly 15 includes a spring 1501 fixedly connected to the inner bottom wall of the fixed sleeve column 13, one end of the spring 1501 is fixedly connected to a pressing column 1502, one end of the pressing column 1502 is fixedly connected to a receiving column 1503, and one end of the receiving column 1503 is fixedly connected to a pressing column 1504. The setting of the pressing assembly 15 plays a role of quick connection;
[0036] See also Figure 4 The surface of the fixed sleeve column 13 is provided with three clamping holes, which are matched with the clamping beads 14. The setting of the clamping beads 14 plays a role of limiting.
[0037] Embodiment 1:
[0038] See also Figure 4 The protection component 12 includes a support column 1201 fixedly connected to the top of the clamp column 11, and a guardrail 1202 is fixedly connected to the top of the support column 1201. The setting of the protection component 12 plays a role in preventing falling;
[0039] Embodiment 2:
[0040] See also Figure 5The protection component 12 includes a lifting column 1203 fixedly connected to the top of the card column 11, and the internal sliding connection of the lifting column 1203 is connected with an extension column 1204. An adjustment hole is provided on one side of the lifting column 1203, and an adjustment bolt 1205 is connected to the internal thread of the adjustment hole. A plurality of threaded holes are provided on the surface of the extension column 1204, and the adjustment bolt 1205 is adapted to the threaded holes. The top of the extension column 1204 is fixedly connected with a protection railing 1202. Through the setting of the protection component 12, the height of the protection railing 1202 can be easily adjusted.
[0041] In the utility model, the working steps of the device are as follows:
[0042] Step 1: When in use, according to the length of the construction work position, turn the limit nut 1002, slide the limit bolt 1001 in the position inside the limit groove, determine the position, tighten the limit nut 1002, and adjust the length of the hydraulic rod 3 and the angle inside the adjustment frame 201;
[0043] The second step: when in use, the scaffolding is built and installed according to the construction height, the card column 11 is inserted into the top of the support frame A5 and the support frame B6, and then the pressing column 1504 is pressed, the spring 1501 is pressed down, and the card bead 14 is received in the storage column 1503, and the fixed sleeve column 13 is inserted into the connecting groove, and the pressing column 1504 is released. The elastic force of the spring 1501 is restored, and the pressure column 1502 squeezes the card bead 14 through the card hole, thereby achieving the effect of building the card column 11 and the support frame A5 and the support frame B6.
[0044] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;
[0045] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.
[0046] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A building construction scaffold, comprising a reinforcement plate (1), characterized in that: Two groups of adjustment components (2) are fixedly connected to the surface of the reinforcement plate (1), one end of the adjustment component (2) is fixedly connected to a hydraulic rod (3), one end of the hydraulic rod (3) is fixedly connected to a connection component (4), one side of one group of the connection components (4) is fixedly connected to a support frame A (5), and one side of the other group of the connection components (4) is fixedly connected to a support frame B (6), the surfaces of the support frames A (5) and B (6) are both clamped with fixing components (7), one end of one of the fixing components (7) is fixedly connected to a pedal (8), and one end of the pedal (8) is provided with a slide groove. The slide groove is internally slidably connected with an extension plate (9), and both sides of the extension plate (9) are fixedly connected with a limit assembly (10). The top surfaces of the support frame A (5) and the support frame B (6) are plugged with a clamping column (11), and the top of the clamping column (11) is fixedly connected with a protective assembly (12). The support frame A (5), the support frame B (6) and one side of the clamping column (11) are provided with a connecting groove, and the interior of the connecting groove is clamped with a fixed sleeve column (13), and the interior of the fixed sleeve column (13) is provided with three clamping beads (14), and the inner bottom wall of the fixed sleeve column (13) is fixedly connected with a pressing assembly (15).
2. A construction scaffold according to claim 1, characterized in that: The adjustment assembly (2) comprises an adjustment frame (201) fixedly connected to the surface of the reinforcement plate (1), and an adjustment column (202) is rotatably connected inside the adjustment frame (201).
3. A construction scaffold according to claim 1, characterized in that: The connection assembly (4) comprises a connection column (401) fixedly connected to one end of the hydraulic rod (3), and a connection piece (402) is rotatably connected to the surface of the connection column (401).
4. A construction scaffold according to claim 1, characterized in that: The fixing assembly (7) comprises a clamping ring (701) which is clamped on the surface of the support frame A (5) and the support frame B (6), and fixing holes are provided at both ends of the clamping ring (701), and the internal threads of the fixing holes are connected with fixing bolts (702).
5. A construction scaffold according to claim 1, characterized in that: The limiting assembly (10) comprises limiting bolts (1001) fixedly connected to both sides of the extension plate (9), and the surface of the limiting bolts (1001) is threadedly connected to the limiting nuts (1002).
6. A construction scaffold according to claim 1, characterized in that: Limiting grooves are provided on both sides of the pedal (8), and the limiting grooves are matched with the limiting bolts (1001).
7. A construction scaffold according to claim 1, characterized in that: The pressing assembly (15) comprises a spring (1501) fixedly connected to the inner bottom wall of the fixed sleeve column (13); one end of the spring (1501) is fixedly connected to a pressing column (1502); one end of the pressing column (1502) is fixedly connected to a storage column (1503); and one end of the storage column (1503) is fixedly connected to a pressing column (1504).
8. A construction scaffold according to claim 1, characterized in that: The surface of the fixed sleeve column (13) is provided with three clamping holes, and the clamping holes are adapted to the clamping beads (14).
Citation Information
Patent Citations
Building construction scaffold
CN219298707U