Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Forward supplement channel speed assignment method and device and base station

A forward supplementary channel and rate technology, which is applied in the field of device and base station, and forward supplementary channel rate assignment method, can solve the problems of large fluctuations in wireless conditions and easy overload of radio frequency systems, so as to alleviate the power overload of the carrier fan and avoid The effect of unreasonable rate assignment

Active Publication Date: 2011-03-23
ZTE CORP
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The main purpose of the present invention is to provide a forward supplementary channel rate assignment method, device and base station, to at least solve the above-mentioned problem that the radio frequency system is easily overloaded when performing F-SCH rate assignment due to large fluctuations in the wireless conditions at the terminal side question

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Forward supplement channel speed assignment method and device and base station
  • Forward supplement channel speed assignment method and device and base station
  • Forward supplement channel speed assignment method and device and base station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Hereinafter, the present invention will be described in detail with reference to the drawings and examples. It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other.

[0025] figure 1 It is a flowchart of an F-SCH rate assignment method according to an embodiment of the present invention. As shown in Figure 1, the following steps are included:

[0026] In step S102, the F-SCH rate to be assigned in this scheduling period is determined according to the wireless condition at the terminal side and the fan power load at the base station side.

[0027] Step S104, adjusting the determined F-SCH rate according to the power fluctuation of the F-SCH in the last scheduling period.

[0028] Step S106, perform F-SCH rate assignment in this scheduling period according to the adjusted F-SCH rate.

[0029] In the above method, in addition to assigning a rate to the terminal a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a forward supplement channel speed assignment method, a forward supplement channel speed assignment device and a base station. The forward supplement channel speed assignment method comprises the following steps of: determining forward supplement channel (F-SCH) speed to be assigned in the dispatching cycle according to the wireless condition of a terminal and the power load of a load fan of a base station; adjusting the determined F-SCH speed according to the power fluctuation condition of the F-SCH in the last dispatching cycle; and assigning the F-SCH speed of the dispatching cycle according to the adjusted F-SCH speed. In the invention, the speed is assigned for the terminal according to the instantaneous wireless condition of a user and the power condition of the load fan, and extra speed reduction processing is performed on the terminal with serious fluctuation by evaluating the historical power fluctuation condition of the F-SCH of the terminal, so that unreasonable speed assignment caused by instantaneous sampling is avoided, and power overload of the load fan caused by the improvement on the transmission power of the F-SCH is relieved.

Description

technical field [0001] The present invention relates to the communication field, in particular, to a forward supplementary channel rate assignment method, device and base station. Background technique [0002] The high-speed packet data service provided by the CDMA2000 base station system is carried over the air by SCH (Supplemental Channel, Supplementary Channel), wherein the SCH from the base station to the terminal is F-SCH (Forward-Supplemental Channel, Forward Supplemental Channel). Since the F-SCH requires greater transmission power than the basic channel carrying voice services, the increase in transmission power will cause overload of the radio frequency system. And under the same wireless environment, higher rate F-SCH requires higher transmission power. Therefore, when the F-SCH is established, it is very important to assign an appropriate rate to prevent the overload of the radio frequency system caused by the forward power increase and to stabilize the system pe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H04W28/22H04W52/00
CPCY02B60/50Y02D30/70
Inventor 李彬
Owner ZTE CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products