Resource scheduling and resource migration methods and equipment
A resource scheduling and resource technology, applied in the computer field, can solve problems such as unreasonable physical resource scheduling, and achieve the effect of reducing the waste of physical resources and electric energy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as figure 1 As shown, it is a schematic diagram of the resource scheduling method in Embodiment 1 of the present invention. The resource scheduling involved in each embodiment of the present invention refers to scheduling the number of physical servers in the resource pool, that is, scheduling the number of physical resources provided by the resource pool. Scheduling, the specific scheduling method is as follows:
[0041] Step 101: Divide the set time period into a plurality of scheduling time periods in turn according to the change state of the virtual machine's demand for physical resources within the set time period.
[0042] According to the statistical analysis of the business volume of computer business and communication business, it can be seen that the fluctuation of business volume has a certain regularity within the set time period, and the higher the business volume, the greater the demand for physical resources of the virtual machine. Therefore, it can ...
Embodiment 2
[0096] After determining the trigger time of each scheduling and the number of scheduled physical servers using the method of Embodiment 1, a reasonable virtual machine migration plan is designed for the increase or decrease of physical servers in each scheduling time period.
[0097] Such as Figure 5 As shown, it is a schematic diagram of resource migration method steps in Embodiment 2 of the present invention, and the method includes the following steps:
[0098] Step 201: When the scheduling time period arrives, compare the number of physical servers corresponding to the current scheduling time period with the number of physical servers corresponding to the previous scheduling time period.
[0099] Step 202: When the number of physical servers corresponding to this scheduling time period is greater than the number of physical servers corresponding to the previous scheduling time period, power on and run P physical servers, and replace the physical servers that have been ru...
Embodiment 3
[0134] Embodiment 3 of the present invention provides a device for resource scheduling, as shown in Figure 6(a) and Figure 6(b), the device includes a time segment division module 11, a quantity determination module 12 and a scheduling module 13, wherein: time The section division module 11 is used to divide the set time period into multiple scheduling time periods in turn according to the change status of the virtual machine's demand for physical resources within the set time period; The number of physical servers of the virtual machine; the scheduling module 13 is configured to run the number of physical servers corresponding to the scheduled time period when each scheduled time period arrives.
[0135] Wherein: the number of physical servers corresponding to each scheduling time period can meet the demand of the virtual machine for physical resources within the scheduling time period, and the number of physical servers corresponding to each scheduling time period is not grea...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com