Monitoring and early-warning system of enterprise project executing schedule

An early warning system and project technology, applied in data processing applications, resources, calculations, etc., can solve problems such as inability to supervise employees, inability of managers to control task progress, and inability to discover project problems in time, so as to promote quantitative management and improve production efficiency effect

Inactive Publication Date: 2012-11-28
XIAMEN EASYUSE SOFTWARE TECH
View PDF5 Cites 43 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this invention cannot supervise the mentality of employees in the process of performing tasks, managers cannot control the progress of tasks, and cannot find problems encountered in the development process of a project in time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Monitoring and early-warning system of enterprise project executing schedule
  • Monitoring and early-warning system of enterprise project executing schedule

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] see figure 1 As shown, a monitoring and early warning system for enterprise project execution progress of the present invention includes a project management module, a task management module, a schedule module, an execution and feedback module, and a user behavior analysis module;

[0017] The project management module is used to realize the establishment of the project and assign the task of the project to the executor; the project management module records the project name of any project, the project leader, the project plan start time, the project plan completion time and the The task name of each task contained under the project;

[0018] The task management module records the basic information of the task according to the task assigned by the project management module, and the basic information includes the task executor, the task plan start time and the task plan completion time; the task management module also includes the task completion time. Time progress mod...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a monitoring and early-warning system of an enterprise project executing schedule. A task managing module is used for recording basic information of a task according to a task record distributed by a project managing module; a schedule module is used for calling all the basic information of the task managing module to obtain the task which is responsible for by a certain executor and the executor obtains a task current finishing rate according to the current finishing condition of the task; an execution and feedback module is used for recording the task current finishing rate fed back by the executor and recording starting time of the task executed by the executor, and current time corresponding to the current finishing condition of the task; a user behavior analyzing module is used for calling the basic information of the execution and feedback module and the task managing module to process to obtain a time schedule rate of finishing the task; an execution schedule of an enterprise project is monitored and easily warned through the task current finishing rate and the time schedule rate of finishing the task; and a manager can supervise and urge the execution of the project to find the problem of the developing project in time, so that the production efficiency is powerfully improved.

Description

【Technical field】 [0001] The invention relates to a monitoring and early warning system for the execution progress of an enterprise project. 【Background technique】 [0002] In recent years, with the reform and opening up of the market, small and medium-sized enterprises have gradually become the mainstay of China's economic development. However, SMEs lack scientific, reasonable and effective monitoring in their own development and operation process. In the existing enterprise management field, the management of tasks has always been based only on the progress of the final completion, and at the same time, it cannot make a reasonable assessment of whether the tasks can be completed in a timely and effective manner. It is impossible to supervise the mentality of employees during the execution of tasks. Managers cannot control the progress of the execution of tasks. They can only know the tasks completed by employees within the deadline. to the problem. Therefore, the presen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
Inventor 郑斓曾捷林晓秋
Owner XIAMEN EASYUSE SOFTWARE TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products