Shear wall structural wall and slab integral pouring construction method
A construction method and integral pouring technology, applied in the construction, building structure, processing of building materials, etc., can solve the problems of complex construction and unsatisfactory work effect, improve the integrity, widen the development space and application prospects, and speed up the construction. The effect of construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0028] A construction method for integral pouring of shear wall structure walls and slabs includes the following steps:
[0029] (1) Rebar Project
[0030] The vertical steel bar adopts two horizontal ladder bars in the horizontal direction, and the steel bar positioning card and cement top mold bar are adopted in the vertical direction; when the wall height is higher than the standard floor, vertical ladder bars need to be added on each wall;
[0031] (2) Template project
[0032] (1) Wood glued formwork steel pipe combination formwork system panel adopts 15mm thick wood plywood, wall vertical rib adopts φ48*3.5mm steel pipe, and the horizontal back of the formwork adopts φ48*3.5mm steel pipe, and the wall bolts pass through the gap between two steel pipes. However, it is fixed with butterfly fasteners to make it into a whole; the top plate is covered with a wood glue template on a 50*100mm square timber, and the lower part is supported by a full house scaffolding movable adjustable ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap