Paired cable duct bank laying-based support pipe construction process
A construction technology and cable pipe arrangement technology, which is applied to the installation of cables, pipe laying and maintenance, pipes/pipe joints/fittings, etc. It can solve the problems of broken pipes and lines that cannot be constructed, and achieves short construction period and good construction quality Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0025] Based on the trusteeship construction process in the laying of cable pipes, the following steps are included:
[0026] Surveying and setting out: Plane control and setting out: According to the existing sidelines, use the control points provided by the surveyor to measure the positioning points of the project, and set up a pile every 3 meters along the center line of the pipe on the ground with a total station before construction , and spread the white ash line along the center line of the pipe and measure the pile elevation, and calculate the relationship between the pile elevation and the design pipe flow surface;
[0027] Elevation control: Measure the elevation control points on the construction site according to the benchmark provided by the surveyor. The elevation control adopts the method of measuring the elevation of the instrument twice before and after the same distance to maintain accuracy. In order to ensure the correctness of the design direction and positio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com