Support replacing construction method in group pit project
A construction method and engineering technology, applied in water conservancy engineering, infrastructure engineering, excavation, etc., can solve problems such as weak structural stability assurance measures and delays in construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention will be described in detail below in conjunction with specific embodiments shown in the accompanying drawings. However, these embodiments do not limit the present invention, and any structural, method, or functional changes made by those skilled in the art according to these embodiments are included in the protection scope of the present invention.
[0025] Such as figure 1 As shown, it is a sectional view of adjacent foundation pits in the brace-changing construction method in the group pit engineering of the present invention, and the adjacent foundation pits include: a first underground structure 1, a second underground structure 2 and a middle partition wall 3, in which The partition wall 3 is located between the first underground structure 1 and the second underground structure 2 and separates the first underground structure 1 and the second underground structure 2 into two independent spaces.
[0026] Specifically, the first underground stru...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com