Support replacing construction method in group pit project
Patent Information
- Authority / Receiving Office
- CN Β· China
- Current Assignee / Owner
- CHINA CONSTR EIGHT ENG DIV CORP LTD
- Publication Date
- 2014-09-10
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of engineering construction, and in particular relates to a support replacement construction method in group pit engineering. Background technique
[0002] In my country, more and more projects are located near protected buildings (structures), such as shallow foundation buildings, protected buildings, important underground pipelines, subway station tunnels, etc. Such buildings (structures) are more sensitive to deformation. , the design usually divides the large foundation pit into several small foundation pits for partition construction. Due to the complex surrounding environment and high protection requirements, high requirements are placed on the deformation control of engineering construction. In addition to the environment during the foundation pit excavation In addition to protective measures, the process of removing and replacing braces during the restoration phase of the basement is also one of the im...