Binding post enabling single-phase watt-hour meter to be replaced without power cut
Patent Information
- Authority / Receiving Office
- CN Β· China
- Current Assignee / Owner
- STATE GRID CORP OF CHINA
- Publication Date
- 2014-10-08
- Estimated Expiration
- Not applicable Β· inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The present application relates to the field of electric power technology, and more specifically, relates to a connection terminal for replacing a single-phase electric energy meter without power failure. Background technique
[0002] With the rapid development of my country's economy, the demand for electricity in all walks of life is increasing. At the same time, the requirements of power customers for the service level of power companies are also constantly increasing. The State Grid Corporation of China even put forward the "Ten Commitments for Power Supply Services" to provide services for residential users with different natures of electricity consumption in different regions. Among them, the regulations for emergency repairs of electricity: urban areas shall not exceed 45 minutes, and rural areas shall not exceed 90 minutes. It is not more than 3 hours in remote areas; it is also stipulated that for residential users who install meters and rece...