An Electric Heating Process for Concrete Construction in Winter
A concrete and electric heating technology, applied in the construction, building structure, construction material processing and other directions, can solve the problems of a large number of electric heating belts, unusable, electric heating belt damage, etc., to achieve low heat utilization rate and speed up the progress of the project , the effect of high heating efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as Figure 1~5 As shown, during the construction of vertical cast-in-place components such as shear wall 1 and column 2, the shear wall reinforcement and column reinforcement are bound, and the shear wall formwork and column formwork are supported. Add vertical plastic pipe 3, the lower end is sealed to prevent water ingress, and the upper end is higher than about 5 ten centimeters of formwork, preferably ten centimeters, in case ingress of water enters ash. Cut the electric heating belt 4 into several sections whose length is shorter than the vertical plastic pipe 3, seal the lower end of each electric heating belt 3 with insulating tape, and then seal it with waterproof tape, and connect the upper end of each electric heating belt 3 in parallel with a wire 6 Connect the 220 volt power supply, seal the connection between the electric heating belt 3 and the wire 6 with insulating tape, and then seal it with waterproof tape, and seal the upper end of the vertical pl...
Embodiment 2
[0045] Such as Figure 5 with Image 6 As shown, during the construction of vertical cast-in-place components such as shear wall 1 and columns, the shear wall reinforcement and column reinforcement are bound, and the shear wall formwork and column formwork are supported, and a vertical Plastic pipe 3, the lower end outlet of the vertical plastic pipe 3 exposes the formwork, and two vertical plastic pipes 3 adjacent up and down are connected through a joint 9. The electric heating belt 4 is cut into several sections whose length is shorter than the vertical plastic pipe 3, and the lower end of each electric heating belt 4 is sealed with insulating adhesive tape, and then sealed with a waterproof adhesive tape. The upper end of the electric heating belt 4 is connected with a traction rope 10, The traction rope 10 is fixedly connected to the sealing member 11 (such as a sponge, etc.) at the upper end of the electric heating belt 4, and the lead wire 6 passes through the outlet o...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


