Adjustable vertical early-stage rigid three-dimensional shock insulation support
A shock-isolation support and vertical shock-isolation technology, applied in the direction of shock-proof, building components, building types, etc., can solve the problems of reducing the cost of shock-isolation, shortening the effective working length of springs, deformation of two sets of disc springs, etc., to achieve buffering Tensile and compressive impact, reduced cost of wind and shock resistance, and small vertical length
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0042] see figure 1 , the three-dimensional seismic isolation bearing in this example is composed of laminated rubber isolation bearings and vertical isolation bearings connected in series up and down.
[0043] see figure 1 and Figure 4 , the laminated rubber shock-isolation bearing includes an upper connecting plate 14, a lower connecting plate 15, a laminated rubber pad 17 clamped between the upper and lower connecting plates and six tensile steel cables 16; wherein, the upper Both the connecting plate 14 and the lower connecting plate 15 are disc-shaped, and the edge of the upper connecting plate 14 is provided with mounting holes 13; the main body of the laminated rubber pad 17 is alternately composed of a layer of rubber 17-1 and a layer of steel plate 17-2 After lamination, it is molded and vulcanized, and a rubber protective layer 17-3 is naturally formed around it during the process of molded vulcanization. The upper and lower end surfaces of the main body of the...
example 2
[0063] This example has the following differences from Example 1:
[0064] see Figures 13 to 15 , the first group of preloaded steel cables 8 and the second group of preloaded steel cables 9 are composed of three preloaded steel cables. The number of the steel cable self-locking tensioning anchors 19 is six, which are respectively used to fix the other end of each pre-compressed steel cable.
[0065] The above-mentioned implementation method of this example is the same as Example 1.
example 3
[0067] see Figures 16-18 , The difference between this example and Example 2 is that the first group of preloaded steel cables 8 and the second group of preloaded steel cables 9 are composed of five preloaded steel cables. The number of the steel cable self-locking tensioning anchors 19 is ten, which are respectively used to fix the other end of each preloaded steel cable.
[0068] Other implementations of this example other than the above are the same as Example 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com