Outage maintenance plan making business level assessment method and system

A technology of maintenance plan and level, applied in the direction of information technology support system, calculation, instrument, etc., can solve the problem of lack of maintenance plan business level, evaluation, etc.

Inactive Publication Date: 2017-06-13
CHINA ELECTRIC POWER RES INST +1
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the patents related to the maintenance plan are mainly based on the results of the preparation of the maintenance plan. This patent is a pre-assessment of the impact on the security of the power grid.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Outage maintenance plan making business level assessment method and system
  • Outage maintenance plan making business level assessment method and system
  • Outage maintenance plan making business level assessment method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0059] The present invention provides a method for assessing the business level of power outage maintenance plan preparation, which includes the following steps:

[0060] Step 1: Raw data collation, including the annual power outage maintenance plan, monthly power outage maintenance plan, power outage actual situation, etc. of the equipment belonging to each participating object, to determine the business level deduction index of the maintenance plan of the evaluation object;

[0061] Preferably, the deduction calculation indicator for the business level of the single equipment maintenance plan;

[0062] Evaluation purpose: evaluation index of maintenance plan business level;

[0063] Indicator description: This indicator mainly evaluates the business level of maintenance plan preparation, which consists of two parts: monthly business level evaluation and annual business level evaluation. By comparing the actual construction period of the maintenance equipment with the planne...

Embodiment 2

[0124] Based on the same idea, the present invention also provides a business level assessment system for power outage maintenance planning, including:

[0125] Maintenance plan business level deduction indicator determination module 10: used to determine the assessment object maintenance plan business level deduction indicator;

[0126] Maintenance implementation efficiency evaluation index determination module 20: used to determine the evaluation object maintenance implementation efficiency evaluation index;

[0127] Planning cycle incompleteness evaluation index determination module 30: determine evaluation object planning cycle incompleteness evaluation index;

[0128] Weight factor determination module 40: for determining the weight factor β 1 , β 2 , β 3 ;

[0129] Evaluation score determining module 50: used to determine the evaluation score of the evaluation object and generate an evaluation report.

[0130] The evaluation index of power grid maintenance plan aims...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an outage maintenance plan making business level assessment method and system. The method comprises the steps that assessment object maintenance plan business level deduction indexes are determined; assessment object maintenance implementation efficiency assessment indexes are determined; assessment object plan cycle incompleteness assessment indexes are determined; weight coefficients beta1, beta2 and beta3 are determined; and assessment scores of assessment objects are determined, and assessment reports are generated. Targeting the making process and implementation conditions of an outage maintenance plan, the indexes capable of comprehensively examining outage maintenance plan business are established, the assessment objects are ranked and assessed through a quantification method in combination with a reasonable assessment model, in this way, all the assessment objects are promoted to improve the production mode of maintenance, production efficiency is improved, and therefore safe operation of a power grid is guaranteed.

Description

technical field [0001] The invention relates to a method and a system in the field of electric power system dispatching automation, and in particular to a method and system for assessing the business level of power outage maintenance plan preparation. Background technique [0002] Under the background of increasing power grid interconnection and the development of electricity market, the unified preparation of maintenance plan is one of the important ways to ensure the safety of the power grid, ensure the normal operation of the market, improve the efficiency of maintenance, and reduce the cost of maintenance. The maintenance plan is a process that is constantly approaching from the time dimension. The annual, monthly, and daily maintenance plan is compiled on a rolling basis. The evaluation of the business level of the maintenance plan will promote the business level of each maintenance plan preparation unit and ensure the maintenance efficiency. A means to realize fine-gra...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06393G06Q50/06Y02P90/80Y04S10/50
Inventor 张加力李培军杨军峰郑晓雨袁森张传成蔡帜丁强戴赛李伟刚门德月燕京华刘芳
Owner CHINA ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products