Outage maintenance plan making business level assessment method and system
A technology of maintenance plan and level, applied in the direction of information technology support system, calculation, instrument, etc., can solve the problem of lack of maintenance plan business level, evaluation, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] The present invention provides a method for assessing the business level of power outage maintenance plan preparation, which includes the following steps:
[0060] Step 1: Raw data collation, including the annual power outage maintenance plan, monthly power outage maintenance plan, power outage actual situation, etc. of the equipment belonging to each participating object, to determine the business level deduction index of the maintenance plan of the evaluation object;
[0061] Preferably, the deduction calculation indicator for the business level of the single equipment maintenance plan;
[0062] Evaluation purpose: evaluation index of maintenance plan business level;
[0063] Indicator description: This indicator mainly evaluates the business level of maintenance plan preparation, which consists of two parts: monthly business level evaluation and annual business level evaluation. By comparing the actual construction period of the maintenance equipment with the planne...
Embodiment 2
[0124] Based on the same idea, the present invention also provides a business level assessment system for power outage maintenance planning, including:
[0125] Maintenance plan business level deduction indicator determination module 10: used to determine the assessment object maintenance plan business level deduction indicator;
[0126] Maintenance implementation efficiency evaluation index determination module 20: used to determine the evaluation object maintenance implementation efficiency evaluation index;
[0127] Planning cycle incompleteness evaluation index determination module 30: determine evaluation object planning cycle incompleteness evaluation index;
[0128] Weight factor determination module 40: for determining the weight factor β 1 , β 2 , β 3 ;
[0129] Evaluation score determining module 50: used to determine the evaluation score of the evaluation object and generate an evaluation report.
[0130] The evaluation index of power grid maintenance plan aims...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com