A lifting and moving dock type wharf
A technology for docks and docks, applied in the field of ship construction, can solve problems such as affecting tourists' play experience and difficulty in getting on and off speedboats for tourists, and achieve the effects of improving play experience, avoiding shaking, and boarding smoothly.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Embodiment one, preparation before work:
[0046] (1) move this invention by walking crawler belt 8, make this invention move to approach bridge place, by fine-tuning, make escalator 22 approach bridge approach;
[0047] (2) Make the spare traveling wheel 71 rise by the spare traveling oil cylinder 72, so as to prevent the spare traveling wheel 71 from touching the ground during the descent of the dock lifting plate 12;
[0048] (3) Lower the dock lifting plate 12 through the dock lifting cylinder 3, and lower the speedboat lifting frame through the speedboat lifting cylinder 4; wait for the speedboat to enter the cavity.
Embodiment 2
[0049] Embodiment two, the speedboat is promoted:
[0050] (1) According to the size of the incoming boat, manually adjust the protective adjustment lead screw 6, so that the spacing of the protective frame is adapted to the size of the speedboat;
[0051] (2) slowly promote the dock lifting plate 12 by the dock lifting cylinder 3, so that the speedboat lifting device arranged on the dock lifting plate 12 touches the bottom of the speedboat;
[0052] (3) Continue to promote the dock lifting plate 12 to make the speedboat leave the water smoothly;
[0053] (4) Promote the speedboat lifting frame through the speedboat lifting cylinder 4, so that the speedboat is raised to a position parallel to the deck, so that tourists can land;
[0054] Wherein step (3) also can be dock lifting oil cylinder 3 and speedboat lifting oil cylinder 4 work simultaneously, finishes the promotion of speedboat jointly.
Embodiment 3
[0055] Embodiment three, when the approach bridge is deployed:
[0056] (1) Take out the approach bridge, make one end of the approach bridge be fixed on the position near the escalator 22 at the rear of the pier, and the other end utilizes a winch, a wire rope, etc. to drag the lifting lug 205, so that the approach bridge is launched under the guidance and support of the scissors member 202;
[0057] (2) Install the railings;
[0058] (3) Tourists land on the shore through the approach bridge.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com