Delay based multi-channel and multi-priority control command voice alarm method

A voice alarm, multi-priority technology, applied in the direction of alarms, instruments, etc., can solve the problems of not playing the role of multiple channels security, delay time leakage alarm, easy to generate leakage alarm, etc., to reduce search time, avoid two The effect of minor alarms, wide applicability

Active Publication Date: 2018-03-23
XIAN AVIATION COMPUTING TECH RES INST OF AVIATION IND CORP OF CHINA
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the existing voice warning method of the airborne avionics system, although it has multiple channels, it does not actually play a role in the safety of multiple channels for mutual backup, and it is easy to generate missing alarms; and solve the existing voice warning method 2 in the delay time When it is larger, it is easy to generate the problems of missing alarm and secondary alarm. The present invention provides a voice alarm method based on multi-channel multi-priority control commands with delay

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Delay based multi-channel and multi-priority control command voice alarm method
  • Delay based multi-channel and multi-priority control command voice alarm method
  • Delay based multi-channel and multi-priority control command voice alarm method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] Voice alarm method of the present invention is applied to figure 1 In the audible warning system in the airborne avionics warning system architecture shown. For the convenience of understanding the present invention, the following combination figure 1 , figure 2 and image 3, the method of the present invention is described in detail by taking an alarm command with 3 channels, a delay of 150 ms between each channel, and 5 different priorities as an example. Define logic 1 as an alarm, logic 0 as no alarm; according to the priority of voice alarm commands from high to low, they are defined as level 1 alarm, level 2 alarm, ..., level 5 alarm; assuming that the valid data received by each channel Among them, the level 1 alarm command is in the 5th bit of the valid data, the level 2 alarm command is in the 1st bit of the valid data, the level 3 alarm is in the 2nd bit of the valid data, and the level 4 alarm is in the 3rd bit of the valid data bit, the level 5 alarm is...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

In order to solve the problem that a current airborne avionic system voice alarm method is easy to generate alarm leakage and second alarm, the present invention provides a delay based multi-channel and multi-priority control command voice alarm method. The method comprises the steps of: performing 'OR' operation of valid data collected in a current round according to a defined channel collectionsequence, wherein in an alarm generation stage, an alarm command can be identified at first time to effectively avoid alarm leakage; employing an 'OR' operation result of the valid data collected in the current round and a decision result of the last round to perform 'OR' operation, forming a final decision result in the current round, wherein in an alarm ending stage, when a channel of ending thealarm recovers a non-alarm instruction, the 'OR' operation with the decision result of the last round is always performed to effectively avoid second alarm; and putting alarm instructions into a one-dimensional alarm command array according to priority levels from high to low. Therefore, the method can perform search according to the sequence and does not need searching of the whole array so as to reduce searching time and improve the response speed of an auditory sense alarm system.

Description

technical field [0001] The invention belongs to the field of airborne avionics and relates to an alarm method. Background technique [0002] There are two voice alarm methods for the existing airborne avionics system: [0003] Alarm method 1: Send commands to the auditory system through the visual alarm system, first send the command which channel is currently valid, and ensure that only one channel is always valid, and then send the alarm command, the auditory alarm system first confirms the current valid channel, and then the only valid channel The analysis of the alarm command and the voice alarm are executed in the channel. Disadvantages of this method: 1. Although there are multiple channels, only one channel is confirmed to be valid at a time. From the perspective of security, it does not actually play a role in the security of multiple channels backing up each other; 2. Increases the upper level of vision Due to the complexity of system design, the current only vali...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G08B21/18
CPCG08B21/182
Inventor 米耘锋刘文学李文军缪炜涛吕亚方冯伟
Owner XIAN AVIATION COMPUTING TECH RES INST OF AVIATION IND CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products