Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

BIM-based dam project construction scheme integrated optimization method

A technology for engineering construction and optimization methods, applied in water conservancy projects, water conservancy engineering equipment, special data processing applications, etc., can solve the problem of inability to set stone filling parameter data, unable to form a scientific and reasonable collection plan, how to transport and mine stone materials There are no problems such as standardized and systematic data parameters

Active Publication Date: 2018-04-06
CHENGDU XIMENG TEKE TECH DEV CO LTD
View PDF4 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the existing technology, the modeling parameters considered for the irregular dam body are not accurate and comprehensive, which leads to the fact that the final dam modeling structure cannot be accurately applied in engineering construction, resulting in project delays, project delays, etc. a series of serious problems;
[0004] In the existing technology, the data collected by the dam stockyard cannot be digitized, so a scientific and reasonable collection plan cannot be formed;
[0005] It is difficult to accurately express the dynamic change process of traffic in engineering construction, the consumption of construction transportation materials, traffic flow status, traffic road information and vehicle configuration
[0006] In the dam project, the filling flow state of the transition material and rockfill material cannot be grasped, and there is no standardized and systematic data parameter for how to transport and mine the stone required for the dam;
[0007] It is impossible to set the parameter data for stone filling, and it is impossible to accurately calculate the volume of the dam surface and the selection of stone mining blocks; it is impossible to set the raw materials of the stockyard to collect the parameter data of the dam surface stone

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based dam project construction scheme integrated optimization method
  • BIM-based dam project construction scheme integrated optimization method
  • BIM-based dam project construction scheme integrated optimization method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The invention performs 6D construction simulation by combining the engineering model with the construction scheme, and provides an effective basis for judging the rationality of the construction scheme and adjusting the scheme.

[0023] Such as Figure 7 As shown, the present invention discloses a BIM-based comprehensive optimization method for a dam project construction plan, comprising the following steps: S1, establishing the general project structure of the dam, obtaining the main structural parameters of the dam, and establishing an initial digital model of the dam project; S2, Divide the data of the stockyard raw materials used in the dam project, and fill the main body of the dam project with the stockyard raw materials according to the modeling sequence; S3, collect data for the traffic planning of the dam project construction, and configure the number of vehicles according to the collected data , transportation capacity and material transportation time; S4, set...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM-based dam project construction scheme integrated optimization method. The method comprises the steps that S1, a dam general project structure is established, dam main structure parameters are acquired, and an initial dam project digital model is established; S2, data partitioning is performed on stock ground raw materials used in a dam project; S3, data collection is performed on construction traffic planning of the dam project, and the quantity of vehicles, transportation capability and material transportation time are configured according to collected data; S4, parameter setting operation is performed on block stone according to the construction state of the dam project; S5, a dam face volume and stone block data are subjected to operation, and a constructionperiod of dam face stone filling is obtained; and S6, filling of gravel earth core wall materials of the dam project is performed, simulating computation is performed through all construction procedures, construction process information containing a dam body filling progress plan, resource consumption conditions and a traffic flow state is obtained, and the construction process corresponding to adesigned construction scheme is carried out more abundantly and more accurately.

Description

technical field [0001] The invention relates to the field of computer-aided design, in particular to a BIM-based comprehensive optimization method for a dam project construction scheme. Background technique [0002] At present, there is no method for simulating the construction process of the gravel soil core rockfill dam project according to the designed construction plan before construction. Due to the large scale of the project and the complexity of the construction plan, the progress plan is usually represented by a bar diagram and a histogram Resource planning is difficult to accurately express the dynamic change process of engineering construction, resource consumption, and traffic flow status. The following problems exist in the design and construction of the dam project scheme: [0003] In the existing technology, the modeling parameters considered for the irregular dam body are not accurate and comprehensive, which leads to the fact that the final dam modeling stru...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50E02B1/00
CPCE02B1/00G06F30/13
Inventor 刘飞虎杨兴国赵立潘春晖辜斌许元
Owner CHENGDU XIMENG TEKE TECH DEV CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products