Cross-provincial and cross-regional power transmission channel power grid project operation benefit evaluation method and system

A power transmission channel and benefit evaluation technology, applied in the field of power grid transmission, can solve the problems of coarse granularity, failure to fully consider the main role of the project, and unset evaluation standards, etc., to achieve scientific weight determination methods, clear evaluation standards, and strong pertinence Effect

Active Publication Date: 2022-01-28
STATE GRID ECONOMIC TECH RES INST CO +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the different functions of power transmission and transformation projects in the power grid, their evaluation indicators and evaluation standards should be different. Projects that meet electricity demand have high requirements for load rate, and use unified indicators and standards to evaluate all projects, ignoring the functional attributes of projects, and cannot provide targeted suggestions for subsequent construction of such projects. The method cannot fully reflect whether the fundamental goal of project construction is realized; the other is to divide power grid engineering projects into public network projects, special power transmission and transformation projects, and networking projects, and divide their roles in the power grid from the spatial and physical levels of the projects. , set different evaluation indicators for each project to evaluate project operation benefits. This type of evaluation method has a coarse granularity and does not fully consider the main role of the project in the power grid, which leads to the evaluation results deviating from the main problems to be solved by the project construction. It cannot provide reference for the operation and construction of such projects in the future
In addition, the indicators involved in the above two methods have no set evaluation standards, and the evaluation process is highly subjective.
To sum up, so far, there has been no research on building an evaluation system, proposing evaluation indicators, and clarifying evaluation criteria for cross-provincial and cross-regional power transmission channel power grid projects from the perspective of different engineering project system functions.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cross-provincial and cross-regional power transmission channel power grid project operation benefit evaluation method and system
  • Cross-provincial and cross-regional power transmission channel power grid project operation benefit evaluation method and system
  • Cross-provincial and cross-regional power transmission channel power grid project operation benefit evaluation method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0082] Such as figure 1 As shown, the cross-provincial and cross-regional power transmission channel power grid project operation benefit evaluation method proposed by the present invention includes the following contents:

[0083] 1. Collect the actual operating power data of a cross-region and cross-province power transmission channel project that needs to be evaluated.

[0084] 2. Evaluate the project performance of the cross-regional and cross-provincial power transmission channel project based on the collected power data. The project performance evaluation indicators include the system proportion of the number of new lines, the system proportion of the length of new lines and the optimization of the grid structure. The specific evaluation process of the evaluation index on the project effectiveness is as follows:

[0085] 1) The proportion of the system in the number of new lines

[0086] Calculate the ratio K of the number of new lines to the number of system lines l1...

Embodiment 2

[0254] Based on the same inventive concept, the present invention also provides a system for evaluating the operation benefits of power transmission channel power grid projects across provinces and regions. The system includes:

[0255] A data collection module for collecting the actual operation power data of the cross-regional and cross-provincial power transmission channel project to be evaluated;

[0256] A project effectiveness evaluation module for evaluating the project effectiveness of the trans-regional and inter-provincial power transmission channel project based on the collected power data;

[0257] A project effect evaluation module for evaluating the project effect of the trans-regional and inter-provincial power transmission channel project based on the collected power data;

[0258] A project safety evaluation module used to evaluate the project safety of the trans-regional and inter-provincial power transmission channel project based on the collected power data...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention relates to a method and system for evaluating the operation benefits of a cross-provincial and cross-regional power transmission channel power grid project, including the following content: 1) collecting the actual operating power data of a certain cross-regional and inter-provincial power transmission channel project that needs to be evaluated; 2) according to the collected Evaluate the project effectiveness of the cross-regional and inter-provincial power transmission channel project based on the power data; 3) evaluate the project effect of the cross-regional and cross-provincial power transmission channel project according to the collected power data; 4) evaluate the project effect based on the collected power data Evaluate the project safety of cross-regional and cross-provincial power transmission channel projects; 5) comprehensively consider project efficiency, project effect and project safety, and comprehensively evaluate the operation effect of cross-provincial and cross-regional power transmission channel power grid projects. The invention can be widely used in the evaluation process of the operation benefit evaluation process of the cross-province and cross-region strengthening power transmission channel power grid project.

Description

technical field [0001] The invention relates to a method and system for evaluating the operation benefit of a power grid project of a cross-provincial and cross-regional power transmission channel, and relates to the technical field of power grid transmission. Background technique [0002] At present, there are usually two types of methods for evaluating the operational benefits of power grid engineering projects. One is to use the same set of index systems to evaluate the operational benefits of power grid engineering projects of all functional types. Due to the different functions of power transmission and transformation projects in the power grid, their evaluation indicators and evaluation standards should be different. Projects that meet electricity demand have high requirements for load rate, and use unified indicators and standards to evaluate all projects, ignoring the functional attributes of projects, and cannot provide targeted suggestions for subsequent constructi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/0639G06Q50/06
Inventor 张恒郑燕雷体钧温卫宁汪亚平易文飞邵黎陈立周子毓何砚翟树军徐玉杰李如萍李士亮宋杰李鑫
Owner STATE GRID ECONOMIC TECH RES INST CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products