A construction scheme generation method and device
A construction plan, the technology of the construction party, applied in the direction of instruments, data processing applications, resources, etc., can solve the problem of the operator's life safety not being guaranteed.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0038] The following details are based on figure 1 For the generation method of the construction plan of the construction system, please refer to image 3 , image 3 It is a flow chart of a method for generating a construction scheme provided in an embodiment of the present application. The method for generating a construction scheme includes the following steps:
[0039] Step S210: the client of the assignment party sends the construction target to the client of the construction party.
[0040] Exemplarily, the construction target sent by the task assigner client to the construction party client may be determined in advance by the task assigner client based on construction demand information and other content, or may be stored in advance in the task assigner client. Among them, the construction demand information can include the construction completion effect required by the client, the acceptance time required by the client, etc. Correspondingly, the construction target ca...
no. 2 example
[0105] The following details are based on figure 2 The generation method of the construction scheme of the construction system, the generation method of the construction scheme comprises the following steps:
[0106] Step S250: the client of the task allocator sends the construction target to the server.
[0107] Step S260: The server receives the construction target.
[0108] Step S270: the server sends the construction target to the client of the construction party.
[0109] Exemplarily, the client of the task allocator first sends the construction target to the server, and the server can immediately send the construction target to the client of the construction party according to demand, or store the construction target and send it when needed.
[0110] It should be noted that the server may receive and send the construction target in various ways, including wireless transmission and wired transmission. For example, wireless transmission methods such as Wifi and Bluetoo...
no. 3 example
[0146] The embodiment of this application provides a construction scheme generation device 600, please refer to Figure 10 , Figure 10 It is a structural block diagram of a device for generating a construction scheme provided in the embodiment of the present application. The device 600 for generating the construction plan includes: a first receiving module 610, configured to receive the construction target sent by the server 130 and / or the task assigner client 110, the construction target includes the construction site and construction content; the evaluation module 620, used The construction environment is evaluated according to the construction target, and an evaluation result is obtained; the first determination module 630 is used to determine a construction plan according to the construction target and the evaluation result; wherein, the construction plan includes construction equipment and The refitting plan of the construction equipment is described, and the refitting ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


