Power grid capital construction project dynamic early warning identification method and system
A technology of dynamic early warning and identification methods, applied in information technology support systems, instruments, data processing applications, etc., can solve the problems of grid infrastructure project delays, cost increases, resource waste, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0053] Such as figure 1 As shown, a dynamic early warning identification method for power grid infrastructure projects provided by the present invention is based on the related technologies of power grid infrastructure projects, starting from the construction of dynamic prediction models, curve drawing, and index screening considering the multi-dimensional goals of "construction-cost-investment" in power grid infrastructure projects , determine the mapping relationship and subordination relationship between different levels, and propose a multi-dimensional target deviation early warning method of "first-level model-second-level curve-third-level indicator", which can accurately locate the occurrence point of the actual progress deviation of the project and propose an effective solution. Specifically, the following steps are included:
[0054] (1) Ana...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com