Responsibility management method based on directed acyclic graph
A technology of directed acyclic graph and management method, applied in the field of responsibility management based on directed acyclic graph, can solve the problems of vague responsibility relationship, inability to post, personnel accountability, etc., and achieve the effect of effective supervision
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] This embodiment provides a responsibility management method based on a directed acyclic graph, such as figure 1 shown, including steps:
[0034] S11. Obtain the post responsibility list corresponding to the post;
[0035] S12. Arranging the post responsibility list according to the directed acyclic graph topology;
[0036] S13. Generate a post responsibility management method based on the directed acyclic graph.
[0037] Among them, the responsibility is performed by humans and / or intelligent robots.
[0038] In this implementation, responsibilities are performed by humans.
[0039] In step S11, a list of post responsibilities corresponding to the post is acquired, wherein one or more post responsibilities correspond to the same post.
[0040] After step S11, further steps are included: modifying the post responsibility list; and / or adding the post responsibility list.
[0041] In step S12, the post responsibility list is topologically arranged according to the dir...
Embodiment 2
[0046] This embodiment provides a responsibility management method based on a directed acyclic graph, such as figure 2 shown, including steps:
[0047] S11. Obtain the post responsibility list corresponding to the post;
[0048] S12. Arranging the post responsibility list according to the directed acyclic graph topology;
[0049] S13. Generate a post responsibility management method based on the directed acyclic graph;
[0050] S14. Obtain post responsibility data according to the post responsibility management method;
[0051] S15. Execute the post responsibility according to the post responsibility data.
[0052] Among them, the responsibility is performed by humans and / or intelligent robots.
[0053] In this implementation, responsibilities are performed by humans.
[0054] In step S11, a list of post responsibilities corresponding to the post is acquired, wherein one or more post responsibilities correspond to the same post.
[0055] After step S11, further steps ar...
Embodiment 3
[0071] This embodiment provides a responsibility management method based on a directed acyclic graph, such as figure 2 shown, including steps:
[0072] S11. Obtain the post responsibility list corresponding to the post;
[0073] S12. Arranging the post responsibility list according to the directed acyclic graph topology;
[0074] S13. Generate a post responsibility management method based on the directed acyclic graph;
[0075] S14. Obtain post responsibility data according to the post responsibility management method;
[0076] S15. Execute the post responsibility according to the post responsibility data.
[0077] Among them, the responsibility is performed by humans and / or intelligent robots.
[0078] In this implementation, responsibilities are performed by humans.
[0079] In step S11, a list of post responsibilities corresponding to the post is acquired, wherein one or more post responsibilities correspond to the same post.
[0080] In this embodiment, school manag...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com