Settlement point building construction progress monitoring method, device and equipment and storage medium

A technology for buildings and resettlement sites, applied in the field of equipment and storage media, devices, and methods for monitoring the progress of building construction in resettlement sites, can solve the problem of not being able to know the construction progress status of resettlement sites at any time, affecting government planning and the interests of resettlement, and lack of resettlement. Point automatic tracking method and other issues

Pending Publication Date: 2020-12-04
江河水利水电咨询中心有限公司 +1
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, due to the lack of an automatic tracking method for the construction progress of the resettlement site, it is impossible to know the construction progress status of the resettlement site at any time, so that the on-time delivery of the resettlement site project cannot be guaranteed, which directly affects the government's planning and the interests of the resettlers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Settlement point building construction progress monitoring method, device and equipment and storage medium
  • Settlement point building construction progress monitoring method, device and equipment and storage medium
  • Settlement point building construction progress monitoring method, device and equipment and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0067] This embodiment provides a method for monitoring the construction progress of buildings at resettlement sites, such as figure 1 As shown, the main flow of the method is described as follows (steps S101-S107).

[0068] Step S101: Obtain the oblique photographic data of the target building at the resettlement site, perform three-dimensional real scene modeling through the oblique photographic data, and obtain an oblique photographic model.

[0069] Oblique photogrammetry is to obtain more complete and accurate information of ground objects by carrying multiple sensors on a unified flight platform and collecting images from different angles such as vertical and oblique at the same time. In the process of establishing the surface model of the building at the resettlement site, oblique photographic data such as image control points, images, and POS data are obtained based on oblique photogrammetry, and the oblique photographic data is imported into the open source GIS platfo...

Embodiment 2

[0095] In order to better implement the above method, an embodiment of the present invention provides a device for monitoring the construction progress of a resettlement site building. The device can be integrated into a construction progress monitoring device, such as a terminal or a server. The terminal can include Devices such as tablets or desktop computers.

[0096] image 3 A structural block diagram of a building construction progress monitoring device at a resettlement point provided by an embodiment of the present invention, as shown in image 3 As shown, the device mainly includes:

[0097] The modeling module 201 is used to obtain the oblique photographic data of the target building at the resettlement site, and perform three-dimensional real scene modeling through the oblique photographic data to obtain an oblique photographic model;

[0098] The singulation module 202 is used to create a vector surface based on the vector design drawing of the target building, a...

Embodiment 3

[0111] In order to better execute the program of the above method, an embodiment of the present invention provides a computer device 300, such as Figure 5 As shown, computer device 300 includes memory 301 and processor 302 .

[0112] The computer device 300 may be implemented in various forms, including fixed terminals such as tablet computers, palmtop computers, notebook computers, and desktop computers.

[0113] Wherein, the memory 301 may be used to store instructions, programs, codes, code sets or instruction sets. The memory 301 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as singulating a three-dimensional model, calculating building height, and obtaining coordinates points, etc.) and instructions for realizing the method for monitoring the progress of building construction at resettlement sites provided by the first ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a settlement point building construction progress monitoring method, device and equipment and a storage medium, and belongs to the technical field of engineering constructionand management. The method comprises the steps of: obtaining oblique photography data of a settlement point target building, performing three-dimensional live-action modeling through the oblique photography data, and obtaining an oblique photography model; creating a vector surface based on the vector design drawing of the to-be-monitored building, and dynamically superposing the vector surface onthe oblique photography model to obtain a monomeric three-dimensional model; obtaining a plurality of preset plane point coordinates corresponding to each single target building in the single three-dimensional model; acquiring a plurality of three-dimensional point coordinates corresponding to the top of each single target building according to the plurality of preset plane point coordinates corresponding to each single target building; calculating the current height of the corresponding single target building according to the elevations of the plurality of three-dimensional point coordinates; and determining the current progress state of the corresponding single target building. According to the invention, the construction progress of the placement point can be automatically monitored.

Description

technical field [0001] The invention relates to the technical field of construction and management of water conservancy and hydropower projects, in particular to a method, device, equipment and storage medium for monitoring the construction progress of buildings at resettlement sites. Background technique [0002] Land acquisition and resettlement of water conservancy and hydropower projects is one of the important factors that must be paid attention to in the process of planning, design and construction of hydropower projects. It directly affects the selection of control water levels, construction period, project investment scale, etc., and sometimes may even restrict project approval. Moreover, the construction progress of the resettlement sites is related to whether the immigrants can be relocated to new houses as soon as possible, whether they can live and work in peace and contentment, and live a happy life. Therefore, the monitoring of the construction progress of the r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06T17/05G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08G06T17/05
Inventor 罗天文徐锐李囡囡刘明郭亮亮王国强
Owner 江河水利水电咨询中心有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products