Problems solved by technology

[0003] Commonly used construction methods for protecting pile holes at this stage: steel casing + clear water reverse circulation and steel casing + mud wall protection are two commonly used construction methods, but these methods are mainly based on steel casings, supplemented by other methods, and cannot be effective For various foundations, resulting in waste of materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Device and operation method for measuring the highest strength ratio of mud retaining wall by simulating different working conditions
  • Device and operation method for measuring the highest strength ratio of mud retaining wall by simulating different working conditions
  • Device and operation method for measuring the highest strength ratio of mud retaining wall by simulating different working conditions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0058] see Figure 1-11 , a device for simulating different working conditions to measure the highest strength ratio of the mud retaining wall, which includes a bottom cap 1, an inner mud tube 4 and an outer half cylinder 5, the inner mud tube 4 is fixedly installed in the middle of the bottom cap 1, The outer semi-cylinder 5 is fixed on the bottom platform 1, and is arranged on the periphery of the inner mud tube 4 so that the two are arranged concentrically; on the bottom platform 1, a shaft column is symmetrically arranged on the outer side of the outer semi-cylinder 5 2; a mixer support 3 is fixed on the bottom platform 1, a mixer 31 is fixedly installed on the top of the mixer support 3, a reaction force frame 7 is fixed on the top of the shaft column 2, and the bottom of the reaction force frame 7 A hydraulic jack 71 is fixed at the central part, and a pressure plate 6 is installed at the bottom end of the piston rod of the hydraulic jack 71; a strain gauge is inserted a...

Embodiment 2

[0072] For simulating foundations of different depths, the earth pressure generated by the foundation at that depth is roughly calculated according to the specifications, the pressure is increased at the deep part of the simulated foundation, and the shallow part of the simulated foundation is properly pressurized or not pressurized; different materials can be added to the outer half cylinder, Add coral sand, suitable for coral sand foundation, add sand, suitable for gravel foundation.

[0073] An operation method of a device for simulating different working conditions and measuring the highest strength ratio of mud retaining wall, characterized in that it includes the following steps:

[0074] S1: Place the device on a flat ground, place the outer semi-cylinder 5 on the bottom cap 1 of the device, put the inner mud tube 4 in the middle of the bottom cap 1, and connect with the outer semi-cylinder 5, choose the appropriate one according to the required radian of the retaining w...

Embodiment 3

[0085] For the visualization of the device, the inner mud cylinder 4, the outer semi-cylinder 5 and the pressure plate 6 steel plates are all made of tempered glass, and the whole process of the operation is photographed and observed, including the change of the semi-cylinder when coral sand is added, and the pressure plate when the pressure is applied. The tightness between coral sands and the trajectory of mud infiltration in the later stage of the mud retaining process, whether it expands from the side or in an arc; cooperate with the arc camera device 8 to measure the uniformity of mud infiltration, and obtain its average influence range and The maximum and minimum influence ranges can be selected according to the needs.

[0086] A construction method of a device for simulating foundation pressurization to measure the highest strength ratio of mud retaining wall, which is characterized in that it includes the following steps:

[0087] S1: Place the device on a flat ground,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a device and an operation method for simulating different working conditions to measure the highest strength ratio of the mud retaining wall. The inner mud cylinder is fixedly installed at the middle position of the bottom cap, and the outer half cylinder is fixed on the bottom cap and arranged on the bottom cap. The periphery of the inner mud tube is arranged concentrically; on the bottom platform, a shaft column is symmetrically arranged on the outside of the outer half cylinder; on the bottom platform, a mixer bracket is fixed, and the top of the mixer bracket is fixed and installed There is a mixer, the top of the shaft column is fixed with a reaction frame, the center of the bottom of the reaction frame is fixed with a hydraulic jack, and the bottom end of the piston rod of the hydraulic jack is installed with a pressure plate; piece. The visual processing of this device combined with two types of camera devices can more clearly observe the change of coral sand under pressure, obtain the permeation rate of mud in coral sand, seepage track and measure its uniformity, and obtain the scope of influence.

Description

technical field [0001] The invention relates to the field of mud retaining walls, more specifically, a device and an operation method for simulating different working conditions and measuring the highest strength ratio of mud retaining walls. Background technique [0002] Bored cast-in-situ piles are widely used in construction and road and bridge engineering as a kind of artificial foundation. According to the different forms of retaining wall, they can be divided into two types: mud retaining wall and full casing construction. Among them, the mud retaining wall is a very common construction method in construction. The mud retaining wall punching cast-in-situ pile is widely used in various buildings because of its simple process, high strength of the pile body, and adaptability to different complex geological conditions. The mud retaining wall is filled with the mixture of water, bentonite and CMC and other admixtures. For projects such as the formation of underground diaph...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D33/00E02D5/34
CPCE02D33/00E02D5/34
Inventor 刘杰陶鑫波程其芬王瑞红张瀚王芳孙涛邓捷宋瑞何卓文李远航包顺骆浩
Owner CHINA THREE GORGES UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products