Method for lateral excavation of caverns with large height difference using double-channel variable-section pilot pit
Through the lateral expansion method of dual-channel variable-section guide pits, a facility platform and a variable-section guide pit are built to solve the problem of low efficiency of expansion of large-height-difference large-hole chambers in the existing technology, and efficient and rapid lateral expansion and high-height are achieved The difference cavity chamber is suitable for projects with a height difference of more than 10m, reducing construction costs.
Patent Information
- Application Number
- CN202111640513.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-12-29
AI Technical Summary
The existing technology is difficult to expand the non-concentric and large-section cave chambers in the existing cave chambers, effectively solve the excavation of the cave chambers with lower elevation to the cave chambers with higher elevation, improve the construction rate of narrow cave chambers and expand from small sections. The problem of digging to large sections is especially suitable for projects with height difference greater than 10m.
The lateral expansion method of double-channel variable-section guide pits is adopted, including building a facility platform, setting up a first and second section variable-section guide pits, lateral contact channels and excavation, by gradually reducing the height difference and using the central soil as Construction platform to avoid heavy transportation of slag and improve construction efficiency.
While ensuring the stability of existing hole chambers, the large height difference hole chambers can be quickly and efficiently expanded and digged in a lateral direction, improving construction rate and transportation efficiency, and is suitable for projects with height difference greater than 10m and reducing construction costs.
Smart Images

Figure CN114396287B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a construction method for lateral expansion of an underground cavern, and in particular to a method for lateral expansion of a cavern with a large height difference by using a double-channel variable-section pilot pit. Background Art
[0002] There are three main methods for expanding existing underground caverns: single-side expansion, two-side expansion, and surrounding expansion. The purpose is to expand the cross-section size to meet the existing traffic volume. However, the above methods are all in-situ expansions and cannot be applied to new lateral large-section caverns with non-equal height differences. This type of project needs to solve the following three problems while ensuring the stability of the existing caverns: ① How to excavate from a cavern with a lower elevation to a cavern with a higher elevation? ② How to increase the construction rate in a narrow cavern? ③ How to expand from a small-section cavern to a large-section cavern after entering the cave?
[0003] At present, in the patent on the method of lateral expansion of existing caverns with non-equal height difference, Du Yonggang et al. proposed a construction structure and method for lateral expansion of large-span caverns based on narrow underground passages (CN104948208B), including the setting of guide tunnels on the left and right sides of the bottom of the existing cavern, a transition section of step excavation, and a horizontal connecting passage; Chen Erping et al. proposed a climbing reverse construction method for lateral expansion of existing caverns into large-section tunnels (CN110685698B), including the setting of temporary climbing passages, forward excavation of upper steps, reverse excavation of upper steps, construction of middle and lower steps, and top construction.
[0004] In the method proposed by Du Yonggang et al., although guide tunnels and transverse communication channels are set up on the left and right sides of the existing tunnel to improve the efficiency of cavern construction, the transition section is excavated by the step method, and the transportation of slag on the steps of the tunnel has not been solved; in the method proposed by Chen Erping et al., there is only one temporary channel for the bottom climbing section, which is still inconvenient for the construction organization in the tunnel. In addition, the slope of the climbing channel is too large, which is not conducive to improving the construction efficiency. In addition, in actual projects, the height difference between the existing cavern and the newly built cavern on the side is also very different. The above two methods are more suitable for projects with a height difference of 5m to 10m, but not for projects with a height difference greater than 10m. Summary of the invention
[0005] In view of the above-mentioned problems in the prior art, the present invention provides a method for lateral excavation of a large height difference cavern with a dual-channel variable-section pilot pit. The method is mainly suitable for projects where the height difference between an existing cavern and a newly built cavern is greater than 10m. It can ensure that the overall construction efficiency is improved and the construction cost is reduced while ensuring the stability of the existing cavern.
[0006] To achieve the above purpose, the present application proposes a method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit, including:
[0007] Step 1. Set up a construction platform in the existing cavern, and set up ramps on both sides of the construction platform to facilitate subsequent vehicle transportation;
[0008] Step 2. excavate the first section of the variable cross-section guide pit on both sides of the predetermined position on the construction platform and provide support, and immediately after excavation, spray concrete, anchor rods, and I-beams are constructed;
[0009] Step 3. Excavate transverse communication channels from the first variable-section pilot pit on both sides at the same time, and the height of the transverse communication channels is consistent with the terminal section of the first variable-section pilot pit;
[0010] Step 4. From the end point of the first variable-section pilot pit, the second variable-section pilot pit is constructed by full-section excavation, and support is provided in time;
[0011] Step 5: Continue to excavate the entire section forward from the end point of the second variable-section pilot pit with its end section size until a pilot pit is formed at the end point of the new cavern, and provide support in time; then excavate the middle soil from the pilot pits on both sides in the form of skipping excavation to complete the soil excavation of the upper step skipping section; divide the remaining upper step soil into two parts, first excavate the middle soil, then use the middle soil as a construction platform to excavate the upper step soil on both sides, and provide support immediately after the excavation is completed;
[0012] Step 6: Excavate the soil of the middle step, which is divided into two parts from top to bottom, with the arch elevation at the starting point of the first section of the variable-section pilot pit as the dividing line. The part above this elevation is the middle-upper step, and the part below this elevation is the middle-lower step; first, the full-section excavation method is used to excavate the guide pits on both sides forward from the second section of the variable-section pilot pit, and then the remaining middle soil of this section of the middle-upper step is excavated from the guide pits on both sides until the first section of the variable-section pilot pit; when excavating the middle-upper step at the first section of the variable-section pilot pit, the middle soil is excavated first, and the middle soil is used as a construction platform to excavate the soil on the left and right sides; then the middle-lower step is excavated using the middle-upper step excavation method of the second section of the variable-section pilot pit.
[0013] Step 7: Remove the construction platform and excavate the steps in sections from the beginning of the existing cavern. Immediately after the excavation is completed, the initial support is constructed.
[0014] Furthermore, the cross-section of the first section of the variable-section pilot pit is a variable cross-section, that is, the cross-section height gradually increases, while the cross-section width and the arch bottom elevation do not change.
[0015] Furthermore, after the excavation of the transverse communication channel is completed, it is immediately supported.
[0016] Furthermore, the second section of the variable-section guide pit is an upward inclined channel, and a variable section is formed by raising the elevations of the arch and the arch bottom. When the elevation of the arch differs from the elevation of the newly built cavern arch by 1 to 2 meters, the construction of the second section of the variable-section guide pit is completed.
[0017] Furthermore, the cross-sectional dimensions of the pilot pit formed after the excavation construction in step 5 always remain the same as the cross-sectional dimensions of the end point of the second section of the variable-section pilot pit.
[0018] Furthermore, in step 5, the excavation sequence of the soil in the upper step jump section is the left pilot pit, the right pilot pit, and the middle soil, and the excavation step distance of the left pilot pit and the right pilot pit is controlled at 5 to 10 m; the corresponding arch advance grouting is performed before the pilot pit excavation, and support is performed in time after the excavation is completed; the left pilot pit and the right pilot pit are excavated forward in full section with the cross-sectional size of the end point of the second section variable-section pilot pit, and after the excavation is completed, the middle soil jump excavation is carried out, and the excavation width is 2 m.
[0019] Furthermore, the remaining upper step soil in step 5 includes the upper step soil at the top of the first section of the variable-section guide pit and the upper step soil at the top of the second section of the variable-section guide pit. The excavation order of the two is the middle soil and the soil on both sides. The middle soil is excavated in the form of a full section, and the arch advance grouting is performed before excavation; the excavation step distance between the soil on both sides and the middle soil is controlled at 10m; then the middle soil is used as a construction platform to excavate towards the soil on both sides, and the excavation width is 2m. After the soil excavation is completed, support is carried out in time.
[0020] Furthermore, the specific implementation method of step 7 is: first dismantle the construction platform, then excavate the lower step on the left side from the existing cavern, and then excavate the lower step on the right side, and the left and right excavation steps are controlled at 5m. After the excavation is completed, the initial support is immediately applied.
[0021] As a further step, the starting section height of the first variable-section pilot pit is 3 to 5 m, and the angle between the arch and the horizontal line is 10° to 15°.
[0022] Furthermore, the climbing angle of the second section variable-section guide pit is 15° to 20°.
[0023] Compared with the prior art, the above technical solution adopted by the present invention has the following advantages:
[0024] (1) By taking three measures to reduce the height difference between the existing cavern and the newly built cavern (setting up the construction platform, the first section of the variable-section pilot pit, and the second section of the variable-section pilot pit), the cavern with a large height difference can be excavated laterally efficiently and quickly while protecting the stability of the existing cavern.
[0025] (2) The use of skip-slot excavation can fully utilize the self-stability of the surrounding rock and increase the construction speed.
[0026] (3) Reasonable use of the soil in the middle as the working surface when constructing the soil on the left and right sides can avoid the step of transporting the excavated soil back to the guide pit and improve construction efficiency.
[0027] (4) The existence of dual channels enables the rapid transportation of construction materials and soil during the construction process. In addition, if an accident occurs in one of the channels, personnel and equipment can be quickly evacuated through the other channel. At the same time, the horizontal communication channels set up provide multiple traffic routes for the construction site, which is conducive to improving transportation efficiency during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 This is the construction flow chart of the method of lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit.
[0029] Figure 2 (a) is the cross-section of the construction platform, and (b) is the longitudinal section of the construction platform.
[0030] Figure 3 (a) is the longitudinal section view of the first section of the variable cross-section guide pit construction, (b) is the plan view of the first section of the variable cross-section guide pit construction, and (c) is the cross-section view of the first section of the variable cross-section guide pit construction.
[0031] Figure 4 (a) is the longitudinal section view of the transverse communication channel construction, and (b) is the plan view of the transverse communication channel construction.
[0032] Figure 5 (a) is the longitudinal section view of the second section variable cross-section pilot tunnel construction, and (b) is the plan view of the second section variable cross-section pilot tunnel construction.
[0033] Figure 6 (a) is the longitudinal section of the upper step soil excavation, (b) is the plan view of the upper step jump section excavation, (c) is the plan view of the upper step soil excavation at the top of the second section variable section pilot pit, and (d) is the plan view of the upper step soil excavation at the top of the first section variable section pilot pit.
[0034] Figure 7 (a) is the longitudinal section of the soil excavation of the middle step, (b) is the plan view of the excavation of the upper step in the second section of the variable cross-section pilot tunnel, (c) is the plan view of the excavation of the upper step in the first section of the variable cross-section pilot tunnel, and (d) is the plan view of the excavation of the middle and lower steps.
[0035] Figure 8 (a) is the longitudinal section of the lower step soil excavation, and (b) is the plan view of the lower step soil excavation.
[0036] Explanation of the numbers in the figure: 1-construction platform; 2-first section of variable cross-section pilot pit; 3-lower step soil; 3.1-left lower step; 3.2-right lower step; 4-horizontal communication channel; 5-second section of variable cross-section pilot pit; 6.1-upper step jump section; 6.2-soil on the upper step at the top of the second section of variable cross-section pilot pit; 6.3-soil on the upper step at the top of the first section of variable cross-section pilot pit; 6.1.1-left side of the pilot pit at the upper step jump section; 6.1.2-right side of the pilot pit at the upper step jump section; 6.1.3-middle soil at the upper step jump section; 6.2.1-middle soil at the upper step at the top of the second section of variable cross-section pilot pit; 6.2.2-soil on the left and right sides of the upper step at the top of the second section of variable cross-section pilot pit; 6.3.1-The soil in the middle of the upper step at the top of the first section of the variable cross-section pilot pit; 6.3.2-The soil on the left and right sides of the upper step at the top of the first section of the variable cross-section pilot pit; 7.1-The middle step-up stage of the second section of the variable cross-section pilot pit; 7.2-The middle step-up stage of the first section of the variable cross-section pilot pit; 7.3-The middle step-down stage; 7.1.1-The soil on the left and right sides of the middle step of the second section of the variable cross-section pilot pit; 7.1.2-The soil in the middle of the middle step of the second section of the variable cross-section pilot pit; 7.2.1-The soil in the middle of the middle step of the first section of the variable cross-section pilot pit; 7.2.2-The soil on the left and right sides of the middle step of the first section of the variable cross-section pilot pit; 7.3.1-The soil on the left and right sides of the middle step-down stage; 7.3.2-The soil in the middle of the middle step-down stage. DETAILED DESCRIPTION
[0037] The embodiments of the present invention are implemented on the premise of the technical solution of the present invention, and detailed implementation methods and specific operation processes are given, but the protection scope of the present invention is not limited to the following embodiments.
[0038] Example 1
[0039] like Figure 1-8 As shown, this embodiment provides a method for lateral excavation of a large height difference cavern with a dual-channel variable-section pilot pit, comprising the following steps:
[0040] (1) Setting up a construction platform
[0041] Due to the large height difference between the existing cavern and the newly built cavern, and the small size of the existing cavern, the clearance height is only h e =5~7m, so the height of the platform set up in the existing cavern is controlled within h1=2~4m. The construction platform adopts reinforced concrete structure, and its width is consistent with the width of the new cavern, and its length is consistent with the width of the existing cavern. In addition, ramps are set on the left and right sides of the platform to meet the subsequent vehicle transportation requirements.
[0042] (2) Construction of the first variable-section pilot pit
[0043] The first section of the variable section pilot pit on the left and right sides is constructed by full section excavation. Steel gantry is used as temporary support at the opening. The footage is 2m long, and concrete spraying, anchor rods and I-beams are immediately carried out after the excavation is completed. During the excavation process, the first section of the variable section pilot pit is formed by increasing the section height. The starting section height of this section of the pilot pit is h2 = 3 ~ 5m, the angle between the arch and the horizontal line is ɑ1 = 10° ~ 15°, and the length is l1 = 20m. Therefore, the difference between the end arch elevation and the starting arch elevation is h3 = tanα1 × l1 = tan (10° ~ 15°) × 20 = 3.5 ~ 5.4m.
[0044] (3) Construction of horizontal communication channels
[0045] After the construction of the first variable-section pilot pit is completed, excavation is carried out from the two sides of the pilot pit to the middle to form a transverse communication channel. The height of the transverse communication channel is consistent with the terminal section of the first variable-section pilot pit, and its excavation width is 3m to 5m to meet the transportation needs of vehicles and construction machinery. In addition, concrete spraying and anchor bolting are carried out immediately after the excavation is completed, and a steel gantry is used as a temporary support.
[0046] (4) Construction of the second variable-section pilot pit
[0047] After the construction of the horizontal connecting channel is completed, the second section of the variable section pilot pit is constructed by full-section excavation from the end point of the first section of the variable section pilot pit. The length of each advance is 2m, and support is applied in time. The second section of the variable section pilot pit is an inclined upward channel with a climbing angle of ɑ2=15°~20° and a length of l2=25m. Unlike the first section of the variable section pilot pit, the second section of the variable section pilot pit forms a variable section by raising the elevation of the arch and the arch bottom. When the arch climbs to the elevation of the newly built cavern arch with a difference of h5=1~2m, the construction of the second section of the variable section pilot pit is completed. After the construction of this section of the pilot pit is completed, the elevation difference between its terminal section and the starting section can be h4=tanα2×l2=tan(15°~20°)×25=6.7~9.1m. Therefore, the new cavern (h n ) and existing caverns (h e ) is Meet the requirement that the height difference between the new cavern and the existing cavern is greater than 10m.
[0048] (5) Excavation of upper step soil
[0049] The soil of the upper step jump section is divided into three parts for excavation, and the excavation order is the left pilot pit, the right pilot pit, and the middle soil. The excavation step distance of the left and right pilot pits is controlled at 5 to 10m. At the same time, the corresponding arch advance grouting is carried out before the pilot pit is excavated, and support is carried out in time after the excavation is completed. The left and right pilot pits are excavated forward with the cross-sectional size of the end of the second section of the variable cross-section pilot pit. After the excavation of the left and right pilot pits is completed, the middle soil jump excavation is carried out, and the excavation width is 2m.
[0050] Then, the soil on the top step of the first and second variable-section pilot pits was excavated. The excavation was divided into two parts, and the excavation order was the middle soil (the middle soil on the top step of the first variable-section pilot pit, the middle soil on the top step of the second variable-section pilot pit), and the soil on both sides (the soil on the left and right sides of the top step of the first variable-section pilot pit, and the soil on the left and right sides of the top step of the second variable-section pilot pit). The middle soil was excavated in the form of a full section, and the excavation size was consistent with the previous excavation size of the upper step. Before excavation, the arch was pre-grouting. The excavation step distance between the soil on both sides and the middle soil was controlled at 10m. Then, the middle soil was used as a construction platform to excavate the soil on both sides, and the excavation width was 2m. After the soil excavation was completed, support was carried out in time. The excavated soil on the left and right sides was transported to the outdoors through the corresponding channels.
[0051] (6) Excavation of the middle step soil
[0052] Taking the elevation of the arch crown of the starting section of the first variable-section pilot pit as the dividing line, the soil of the middle step is divided into two parts from top to bottom, the part above this elevation is the middle-upper step, and the part below this elevation is the middle-lower step. When excavating the middle-upper step, the full-section excavation method is used to excavate from the second section of the pilot pit where the section changes to the end of the new cavern, and then excavate from the two side pilot pits (the left and right sides of the middle-upper step of the second section of the variable-section pilot pit) to the middle soil (the middle soil of the middle-upper step of the second section of the variable-section pilot pit), each excavation width is 2m, until the excavation is completed. Similarly, when excavating the soil above the first section of the variable-section pilot pit, it is divided into two parts, namely the middle soil and the soil on both sides. First, the middle soil (the middle soil of the middle-upper step of the first section of the variable-section pilot pit) is excavated, and then the excavated middle soil is used as a construction platform to excavate the left and right side soil (the left and right side soil of the middle-upper step of the first section of the variable-section pilot pit), and the step width is controlled at 5m.
[0053] The excavation sequence and method of the middle and lower steps are the same as those of the middle and upper steps of the second variable-section pilot pit, that is, excavation is carried out from the two side pilot pits (the left and right sides of the middle and lower stage) to the middle soil (the middle soil of the middle and lower steps), with an excavation width of 2m each time until the excavation is completed. After the excavation of the middle and upper steps and the middle and lower steps is completed, support should be applied in time.
[0054] (7) Excavation of lower step soil
[0055] After the excavation of the middle step soil is completed, the construction platform at the existing tunnel will be dismantled first, and then the left lower step will be excavated from the existing cavern first, and then the right lower step will be excavated. The left and right excavation steps are controlled at 5m. After the excavation is completed, the initial support will be immediately carried out.
[0056] The double-channel variable-section guide pit formed by the above method is a lateral expansion structure of a large height difference cavern, comprising a construction platform, a first section variable-section guide pit, a transverse connecting channel, a second section variable-section guide pit and an upper step jump section, wherein the construction platform is located in the existing cavern and below the starting section of the first section variable-section guide pit, the first section variable-section guide pit is located on the left and right sides of the newly built cavern and the terminal sections are connected by a transverse connecting channel, each first section variable-section guide pit is connected to the corresponding second section variable-section guide pit, and the second section variable-section guide pit is an inclined upward channel and is connected to the upper step jump section.
[0057] The newly built cavern upper step soil body includes the upper step slot section, the upper step soil body at the top of the second variable section pilot pit, and the upper step soil body at the top of the first variable section pilot pit. The upper step slot section includes the left pilot pit of the upper step slot section and the right pilot pit of the upper step slot section, and multiple sections of the upper step slot section intermediate soil bodies are excavated between the two pilot pits.
[0058] The step soil in the newly built cavern includes the upper stage and the middle lower stage in the second section of the variable cross-section pilot pit, and the upper stage and the middle lower stage in the first section of the variable cross-section pilot pit. The two middle upper stages are connected and located on the middle lower stage.
[0059] The soil body of the lower step of the newly-built cavern includes a left lower step and a right lower step, and the height of the soil body is the same as the height of the construction platform.
[0060] The foregoing description of specific exemplary embodiments of the present invention is for the purpose of illustration and demonstration. These descriptions are not intended to limit the present invention to the precise form disclosed, and it is clear that many changes and variations can be made based on the above teachings. The purpose of selecting and describing the exemplary embodiments is to explain the specific principles of the present invention and its practical application, so that those skilled in the art can realize and utilize various different exemplary embodiments of the present invention and various different selections and changes. The scope of the present invention is intended to be limited by the claims and their equivalents.
Claims
1. A method for lateral excavation of a large height difference cavern using a double-channel variable-section pilot pit, characterized in that: include: Step 1. Set up a construction platform in the existing cavern, and set up ramps on both sides of the construction platform; Step 2. excavate the first section of the variable cross-section guide pit on both sides of the predetermined position on the construction platform and provide support, and immediately after excavation, spray concrete, anchor rods, and I-beams are constructed; Step 3. Excavate transverse communication channels simultaneously from the first variable-section pilot pits on both sides, the height of the transverse communication channels being consistent with the terminal section of the first variable-section pilot pit; Step 4. From the end point of the first variable-section pilot pit, the second variable-section pilot pit is constructed by full-section excavation, and support is provided in time; Step 5: Continue to excavate the entire section forward from the end point of the second variable-section pilot pit with its end section size until a pilot pit is formed at the end point of the new cavern, and provide support in time; then excavate the middle soil from the pilot pits on both sides in the form of skipping excavation to complete the soil excavation of the upper step skipping section; divide the remaining upper step soil into two parts, first excavate the middle soil, then use the middle soil as a construction platform to excavate the upper step soil on both sides, and provide support immediately after the excavation is completed; Step 6: excavate the soil of the middle step, which is divided into two parts from top to bottom, with the vault elevation at the starting point of the first section variable cross-section pilot pit as the dividing line, the part above the elevation is the middle-upper step, and the part below the elevation is the middle-lower step; first, the full-section excavation method is used to excavate the two side pilot pits forward from the second section variable cross-section pilot pit, and then the remaining middle soil of the middle-upper step of this section is excavated from the two side pilot pits until the first section variable cross-section pilot pit; when excavating the middle-upper step at the first section variable cross-section pilot pit, the middle soil is excavated first, and the middle soil is used as a construction platform to excavate the soil on the left and right sides; then the middle-lower step is excavated by the middle-upper step excavation method of the second section variable cross-section pilot pit; Step 7: Remove the construction platform and excavate the steps in sections from the beginning of the existing cavern. Immediately after the excavation is completed, the initial support is constructed.
2. According to claim 1, the method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit is characterized in that: The cross-section of the first section of the variable-section pilot pit is a variable cross-section, that is, the cross-section height gradually increases, while the cross-section width and the arch bottom elevation do not change.
3. According to claim 1, the method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit is characterized in that: After the excavation of the transverse communication channel is completed, it is immediately supported.
4. According to claim 1, the method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit is characterized in that: The second section of the variable-section pilot pit is an upward inclined channel, and a variable section is formed by raising the elevations of the arch and arch bottom. When the elevation of its arch differs from the elevation of the newly built cavern arch by 1 to 2 meters, the construction of the second section of the variable-section pilot pit is completed.
5. According to claim 1, the method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit is characterized in that: The cross-sectional dimensions of the pilot pit formed after the excavation construction in step 5 always remain the same as the cross-sectional dimensions of the end point of the second section of the variable-section pilot pit.
6. According to claim 1, the method for lateral excavation of a large height difference cavern with a dual-channel variable-section pilot pit is characterized in that: In step 5, the soil excavation sequence of the upper step jump section is the left pilot pit, the right pilot pit, and the middle soil. The excavation step distance of the left pilot pit and the right pilot pit is controlled at 5 to 10 m. Before the excavation of the pilot pit, the corresponding arch advance grouting is performed, and support is performed in time after the excavation is completed. The left pilot pit and the right pilot pit are excavated forward in full section with the cross-sectional size of the end point of the second section variable-section pilot pit. After the excavation is completed, the middle soil jump excavation is carried out, and the excavation width is 2 m.
7. The method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit according to claim 1 is characterized in that: The remaining upper step soil in step 5 includes the upper step soil at the top of the first section of the variable-section pilot tunnel and the upper step soil at the top of the second section of the variable-section pilot tunnel. The excavation order of the two is the middle soil and the soil on both sides. The middle soil is excavated in the form of a full section, and the arch advance grouting is performed before excavation; the excavation step distance between the soil on both sides and the middle soil is controlled at 10m; then the middle soil is used as a construction platform to excavate towards the soil on both sides, and the excavation width is 2m. After the soil excavation is completed, support is carried out in time.
8. The method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit according to claim 1 is characterized in that: The specific implementation method of step 7 is: first dismantle the construction platform, then excavate the lower step on the left side from the existing cavern, and then excavate the lower step on the right side. The left and right excavation steps are controlled at 5m. After the excavation is completed, the initial support is immediately implemented.
9. The method for lateral excavation of a large height difference cavern using a dual-channel variable-section pilot pit according to claim 1 is characterized in that: The starting section height of the first variable-section pilot pit is 3 to 5 m, and the angle between the arch and the horizontal line is 10° to 15°.
10. The method for lateral excavation of a large height difference cavern with a double-channel variable-section pilot pit according to claim 1 is characterized in that: The climbing angle of the second variable-section guide pit is 15° to 20°.