Inter-stope equipment scheduling method and device based on short-term operation plan

A technology of operation planning and scheduling method, applied in the direction of calculation, genetic law, surface mining, etc., can solve the problems of unreasonable equipment scheduling method between stopes and affecting mine production efficiency, so as to improve production efficiency and equipment use efficiency, improve The effect of solving efficiency and improving acquisition efficiency

Pending Publication Date: 2022-05-17
WUHAN UNIV OF TECH
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of this, it is necessary to provide a method and device for inter-stope equipment scheduling based on short-term operation plans to solve the unreasonable method of inter-stope equipment scheduling based on short-term operation plans in the prior art, which leads to the impact on mines. Technical issues of production efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Inter-stope equipment scheduling method and device based on short-term operation plan
  • Inter-stope equipment scheduling method and device based on short-term operation plan
  • Inter-stope equipment scheduling method and device based on short-term operation plan

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the drawings in the embodiments of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts belong to the protection scope of the present invention.

[0055] In the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.

[0056] The terms "comprising" and "having" and any variations thereof in the embodiments of the present invention are intended to cover a non-exclusive inclusion, for example, a process, method, device, product or equipment that includes a series of steps or modules is not necessarily limited to expressly Instead, other steps or modu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an inter-stope equipment scheduling method and device based on a short-term operation plan. The method comprises the following steps: selecting target data from a mine database based on the short-term operation plan; constructing an inter-stope equipment scheduling model based on the target data; and solving the inter-stope equipment scheduling model by adopting an improved non-dominated genetic algorithm to obtain an inter-stope equipment scheduling scheme, and scheduling inter-stope equipment based on the inter-stope equipment scheduling method. The production benefit of a mine and the use efficiency of equipment are improved.

Description

technical field [0001] The invention relates to the technical field of preparation of underground mine equipment dispatching plan, in particular to a method and device for inter-stope equipment dispatching based on a short-term operation plan. Background technique [0002] As the production equipment of underground mines gradually moves towards trackless, the main equipment for underground mining operations includes rock drills, scrapers, traction locomotives, towable mine cars, etc., and except for rock drills, the main purpose of other equipment is to transport ore . Scrapers and electric locomotives are more flexible to use, and they are moving irregularly all the time. Therefore, the running time and route of scrapers and electric locomotives are difficult to predict, and it is necessary to arrange the scheduling plan of transportation equipment reasonably. [0003] In the existing technology, the short-term operation plan of underground mines is usually compiled by dec...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/04G06N3/12E21C41/22G06Q50/02
CPCG06Q10/06313G06Q10/06312G06Q10/04G06N3/126E21C41/22G06Q50/02
Inventor 李宁冯书照吴亚辉王李管贾明滔叶海旺王其洲刘鼎
Owner WUHAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products