A multi-process combined efficient production method for hydrate reservoir fracturing-production-reinforcement

By using fracturing fluid of highly permeable porous material proppant in the natural gas hydrate reservoir to form cracks and using reinforcement agent to reinforce the mined area, the problems of low permeability of natural gas hydrate reservoirs and volatile reservoir instability are solved. , achieving efficient and safe mining results.

CN118346243BActive Publication Date: 2024-11-19ZHEJIANG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410576511.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2024-11-19
Estimated Expiration
2044-05-10

AI Technical Summary

Technical Problem

The low permeability of natural gas hydrate reservoirs leads to low gas production rates and easy reservoir instability, resulting in low mining efficiency and engineering catastrophe risks, limiting the commercial exploitation of natural gas hydrates.

Method used

The multi-process and high-efficiency mining method of hydrate reservoir fracturing-mining-reinforcement are adopted to form cracks in the well through the fracturing fluid of the highly permeable porous material proppant, and reinforce the mined area with reinforcement to expand the mining range. , improve permeability and reservoir stability.

Benefits of technology

It improves the efficiency of natural gas hydrate mining and reservoir stability, solves the problems of low gas production rate and reservoir instability, and achieves safe and efficient mining of natural gas hydrate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118346243B_ABST
    Figure CN118346243B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-process joint efficient exploitation method for hydrate reservoir fracturing, exploitation and reinforcement, which includes: setting independent liquid injection pressure-resistant pipelines in the exploitation well; setting openings and nozzles for fracturing, reinforcement and exploitation on the exploitation well; connecting the nozzles for fracturing and reinforcement to the corresponding injection systems respectively by using pipelines in the well; injecting the prepared fracturing fluid into the hydrate reservoir to form fracturing cracks; exploiting the reservoir by reducing the pressure of the exploitation well; injecting the prepared reinforcement agent into the reservoir after exploitation for reinforcement; repeating the above steps to perform multi-process joint efficient exploitation of the reservoir by fracturing, exploitation and reinforcement. The present invention improves the permeability of the reservoir around the exploitation well through the fracturing process, improves the stability of the reservoir through the reinforcement process, and the multi-process joint exploitation enhances the efficiency and safety of the exploitation process, providing a new multi-process joint efficient exploitation method for safe and efficient exploitation of deep-sea natural gas hydrates.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of energy engineering and geotechnical engineering, and relates to a method for reinforcing a natural gas hydrate reservoir and safely and efficiently exploiting it, and in particular to a multi-process combined efficient exploitation method for hydrate reservoir fracturing-exploitation-reinforcement, which is suitable for solving the problems of low gas production rate and easy instability of the reservoir during natural gas hydrate exploitation. Background Art

[0002] Natural gas hydrates are considered to be the most promising clean energy to replace conventional oil and gas. It is estimated that the reserves of natural gas hydrates in deep-sea sediments in the South my country Sea are about 80 billion tons of oil equivalent. Natural gas hydrates in my country are mainly found in deep-sea sediments in a high-pressure and low-temperature environment. At present, pressure reduction mining is recognized as the most economical and effective method for natural gas hydrate mining. The reservoir sediments of the natural gas hydrate in the South my country Sea are mainly muddy silt with an average particle size of about 12μm and low permeability. The average permeability is in the millidarcy level. During pressure reduction mining, the pressure is transmitted slowly, which is not conducive to the expansion of the pressure reduction zone, resulting in low mining efficiency. Active hydraulic fracturing of the sediments around the well to form cracks around the well is a common method to improve the permeability around the well in conventional underground energy mining. If used for the mining of natural gas hydrates, it is expected to improve the permeability around the well while expanding the pressure reduction decomposition zone and improving the mining gas production efficiency.

[0003] Unlike traditional oil and gas extraction, natural gas hydrate extraction is a phase change process in which the solid phase is transformed into liquid water and gaseous methane. The loss of the solid phase in hydrate-containing sediments will weaken the cementation and support between the soil skeletons. The flow of liquid-gas two-phase flow between pores often carries a large number of soil particles. The risk of sand production during extraction will increase, which may lead to blockage of the extraction wells. Japan's two natural gas hydrate test extractions in the Nankai Trough were forced to be terminated due to sand production problems. At the same time, the decomposition of the solid phase will reduce the skeleton strength and cause reservoir deformation, and even cause the extraction well to tilt or the reservoir to collapse, causing serious engineering disasters.

[0004] At present, the low permeability of gas hydrate reservoirs in the South my country Sea leads to a small effective mining range and low gas production efficiency. At the same time, there are risks of engineering disasters such as sand production and reservoir instability and collapse, which are bottleneck problems restricting the commercial exploitation of gas hydrates. Therefore, exploring a mining method that can efficiently and continuously mine low-permeability sediment reservoirs while ensuring that reservoir deformation is within a safe and controllable range is the key problem that must be solved first to achieve the goal of efficient, safe, and long-term exploitation of gas hydrates. Summary of the invention

[0005] The purpose of the present invention is to provide a multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement in view of the deficiencies of the prior art. The present invention utilizes a specific viscosity fracturing fluid containing a high-permeability porous material proppant to fracture the reservoir, and then performs exploitation in the form of pressure reduction, heat injection, etc., while utilizing the cementing reinforcement effect of the reinforcement agent to reinforce the exploited area; on the basis of the above, the unexploited area is continued to be fractured according to the needs of the exploitation range to expand the hydrate exploitation range, which can fill the gap in the field of multi-process exploitation of hydrate reservoir fracturing, exploitation and reinforcement.

[0006] The object of the present invention is achieved through the following technical scheme: a multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement, comprising the following steps:

[0007] Step 1: Set up a liquid injection pipeline in the mining well

[0008] Several pressure-resistant pipes are installed in the mining well to transport fracturing fluid and reinforcement agent respectively, and the upper ends of the pressure-resistant pipes are connected to the corresponding high-pressure liquid injection system on the offshore mining platform;

[0009] Step 2: Set up mining holes and nozzles on the mining well

[0010] In the part where the mining well contacts the natural gas hydrate reservoir, openings and nozzles for fracturing, reinforcement and mining are arranged at certain intervals, and the nozzles extend outward from the openings, and the outer ends of the nozzles are flush with the sand control screen;

[0011] Step 3: The nozzles are connected to the corresponding high-pressure liquid injection systems

[0012] The fracturing and reinforcement nozzles are respectively connected to the lower ends of the corresponding pressure-resistant pipes, so that the fracturing and reinforcement nozzles on the production well are respectively connected to the corresponding high-pressure liquid injection systems on the offshore production platform, so as to control the fracturing fluid and reinforcement agent to be independently injected into the hydrate reservoir through the nozzles;

[0013] Step 4: Prepare fracturing fluid and inject it into the hydrate reservoir

[0014] Prepare a fracturing fluid, and use a high-pressure liquid injection system on an offshore production platform to inject the fracturing fluid into the hydrate reservoir through a fracturing fluid nozzle on a production well to form a fracturing crack in the hydrate reservoir, and the porous material proppant in the fracturing fluid is deposited and fixed in the crack;

[0015] Step 5: Hydrate mining

[0016] The hydrate reservoir is depressurized or exploited in a combined depressurization-heat shock manner through the exploitation openings on the exploitation well, so that the hydrate in the fracturing area can be quickly decomposed and produced;

[0017] Step 6: Prepare reinforcement agent and inject it into hydrate reservoir for reinforcement

[0018] Prepare a reinforcement agent, and use a high-pressure liquid injection system on an offshore mining platform to inject the reinforcement agent into the hydrate reservoir after mining through the fractures generated by fracturing through the reinforcement agent nozzle on the mining well, and let it stand for a period of time to reinforce the mined area;

[0019] Step 7: Hydrate reservoir fracturing-mining-reinforcement multi-process mining

[0020] According to the requirements of the hydrate exploitation range, steps four to six are repeated, firstly, the unexploited hydrate reservoir is fractured to form a fracturing zone, then the hydrate in the fracturing zone is exploited, and after the hydrate decomposition and exploitation in the fracturing zone is completed, a reinforcement agent is injected to convert the fracturing zone into a reinforcement zone, and then the unexploited hydrate reservoir is continued to be fractured to expand the fracturing zone, and the hydrate reservoir is efficiently exploited by a multi-process joint fracturing-exploitation-reinforcement.

[0021] Furthermore, in the step 1, the pipelines for transporting different liquids in the production well are independent of each other, and the pipelines are pressure-resistant pipelines that can withstand the internal and external pressure differences.

[0022] Furthermore, in the step 2, a plurality of mining openings are provided on the mining well, which are transmission channels for liquid and gas output during natural gas hydrate mining; and a sand-proof screen is wrapped around the outside of the mining well.

[0023] Furthermore, in the step 2, the spray holes on the nozzles are circular spray holes, and each group of nozzles consists of a fracturing fluid nozzle and a reinforcing agent nozzle, wherein the fracturing fluid nozzle is provided with a spray hole for spraying fracturing fluid, and the reinforcing agent nozzle is provided with a reinforcing agent reinforcing mother liquid spray hole and a reinforcing agent reactant spray hole; each group of nozzles surrounds a mining opening, and the nozzles extend outward from the wall of the mining well, pass through the sand control screen wrapped around the outside of the mining well, and the outermost end of the nozzle is flush with the outermost end of the sand control screen.

[0024] Furthermore, in step 4, the fracturing fluid is a liquid with viscosity, and the fracturing fluid is a high-viscosity fracturing fluid or a low-viscosity fracturing fluid. The high-viscosity fracturing fluid includes guar gum fracturing fluid and silicone oil fracturing fluid, and the low-viscosity fracturing fluid includes sodium chloride solution fracturing fluid.

[0025] Furthermore, in step 4, the proppant includes a mixture of one or more of porous ceramic particles, porous calcium carbonate particles, and polyester fiber materials; the proppant is uniformly mixed in the fracturing fluid to form a suspension.

[0026] Furthermore, in step 4, the high-pressure liquid injection system includes constant pressure injection and constant flow injection. The pressure or injection rate of the injected fracturing fluid is determined according to the mechanical parameters and pressure conditions of the hydrate reservoir obtained by drilling before mining. The minimum injection pressure p min The calculation formula is:

[0027]

[0028] Where K0 is the static earth pressure coefficient of the hydrate reservoir, Φ is the internal friction angle of the hydrate reservoir sediment, ρ' is the average effective density of the hydrate reservoir and the overlying sediment layer, g is the gravitational acceleration, z is the burial depth of the hydrate reservoir, N P is the hydrate cohesion coefficient, c h is the cohesive force of the hydrate.

[0029] Furthermore, in step six, the reinforcement agent is composed of a reinforcement mother liquid and a reactant, and the ratio of the reinforcement mother liquid to the reactant is determined according to the required reaction time and reinforcement strength; the reinforcement mother liquid is injected into the mined hydrate reservoir through the reinforcement mother liquid pipeline and the reinforcement mother liquid nozzle on the reinforcement nozzle for reinforcement, and the reactant is injected into the mined hydrate reservoir through the reinforcement reactant pipeline 209 and the reinforcement reactant nozzle on the reinforcement nozzle for reinforcement; the reinforcement process is: first inject the reinforcement mother liquid for a period of time, and then inject the reactant to make it evenly fill the pores of the soil skeleton, let it stand for a period of time to wait for the formation of cement or crystals, and complete the reinforcement of the mined area.

[0030] Furthermore, when the consolidation mother solution reacts with the reactant, a cemented body or a crystal is formed in the pores of the hydrate reservoir, and the formation principle thereof is shown in the following formula:

[0031]

[0032] The cemented body or crystal has porous characteristics and is generated at the contact point of the soil skeleton.

[0033] Furthermore, in step 6, the pressure of the reinforcing agent during injection is less than or equal to the minimum injection pressure p of the fracturing fluid. min .

[0034] Compared with the prior art, the present invention has the following beneficial effects:

[0035] The present invention is applicable to the field of offshore natural gas hydrate exploitation. It can use an active splitting method to improve the permeability of the hydrate reservoir around the well and form a dominant seepage path, and use a chemical reaction or microbial induced crystallization reinforcement method to reinforce the hydrate reservoir after fracturing. In addition, through a multi-process combined method of fracturing-exploitation-reinforcement, the fracturing area and the hydrate decomposition area are repeatedly expanded to improve the efficiency of hydrate exploitation and reservoir stability.

[0036] The method of the present invention is novel and has clear ideas. It fills the gap in the multi-process combined efficient exploitation technology of natural gas hydrate reservoir fracturing-exploitation-reinforcement, provides new technology for the safe and efficient exploitation of deep-sea natural gas hydrates, and solves the problems of low gas production rate due to low reservoir permeability and blockage of production wells and reservoir instability caused by sand production in the current natural gas hydrate exploitation. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of the field layout of natural gas hydrate mining and the multi-process joint efficient mining process of fracturing-mining-reinforcement in the present invention; wherein, Figure 1 (a) is a schematic diagram of the fracturing and mining process; Figure 1 (b) is a schematic diagram of the reinforcement and secondary fracturing process;

[0038] Figure 2 It is a schematic diagram of the production wellbore, nozzle arrangement and internal pipeline structure in the present invention; wherein, Figure 2 (a) is the front view of the production well; Figure 2 (b) is a radial cross-section of the production well; Figure 2 (c) is an axial cross-sectional view of a production well; Figure 2 (d) is another axial cross-sectional view of the production well;

[0039] Figure 3 It is a flow chart of the multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement in the present invention.

[0040] In the figure, reinforcement area 101, fracturing area 102, hydrate reservoir 103, production well 104, overlying seawater 105, overlying soil layer 106, underlying layer 107, offshore production platform 108, production opening 201, fracturing fluid nozzle 202, reinforcing agent nozzle 203, well production channel 204, sand control screen 205, production well wall 206, fracturing fluid pipeline 207, reinforcing agent reinforced mother liquor pipeline 208, reinforcing agent reactant pipeline 209, reinforcing agent reinforced mother liquor spray hole 210, reinforcing agent reactant spray hole 211. DETAILED DESCRIPTION

[0041] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the attached claims. It should be understood that the above general description and the detailed description that follows are merely exemplary and explanatory and cannot limit the present application.

[0042] The terms used in this application are for the purpose of describing specific embodiments only and are not intended to limit this application. The singular forms of "a", "said" and "the" used in this application and the appended claims are also intended to include plural forms unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.

[0043] It should be understood that, although the term first, second, third, etc. may be used in the present application to describe various information, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of..." or "when..." or "in response to determination". Moreover, the term "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process and method including a series of elements include not only those elements, but also include other elements not clearly listed, or also include elements inherent to such process and method. In the absence of more restrictions, the elements limited by the statement "including one..." do not exclude the existence of other identical elements in the process, method, article or equipment including the elements.

[0044] The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the features of the following embodiments and implementations can be combined with each other.

[0045] like Figure 1-Figure 2As shown, the hydrate reservoir 103 described in the present invention is located in deep seabed sediments, and the hydrate reservoir 103 is covered with overlying seawater 105 and overlying soil layer 106 from top to bottom, and the lower part of the hydrate reservoir 103 is the underlying layer 107. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement of the present invention, firstly, the exploitation well 104 is inserted from the offshore exploitation platform 108 through the overlying seawater 105 and the overlying soil layer 106 into the unexploited hydrate reservoir 103, and the well wall 206 of the exploitation well is provided with exploitation openings 201, fracturing fluid nozzles 202 and reinforcement agent nozzles 203 at intervals. The exploitation openings 201 shown in the figure are arranged symmetrically in the annular center, and of course, the arrangement density can also be changed according to demand. The two nozzles, the fracturing fluid nozzle 202 and the reinforcement agent nozzle 203, form a group of nozzles surrounding the exploitation opening 201. The outer side of the production well wall 206 is wrapped with a sand-proof screen 205, and the outermost end of the nozzle is flush with the outermost end of the sand-proof screen 205. A fracturing fluid pipeline 207, a reinforcing agent reinforcing mother liquid pipeline 208, and a reinforcing agent reactant pipeline 209 are arranged in the production well 104 to connect the nozzle with the high-pressure liquid injection system on the offshore production platform 108. The pipelines in the well correspond to the nozzles and are arranged symmetrically in the center. The liquid and gas produced by the production are produced through the production channel 204 in the well.

[0046] In the present invention, fracturing, exploitation and reinforcement are repeated successively, and the high-pressure pump of the high-pressure liquid injection system is used to inject the fracturing fluid on the offshore production platform 108 into the unexploited hydrate reservoir 103 through the fracturing fluid pipeline 207 and the fracturing fluid nozzle 202, thereby generating fracturing cracks to form the fracturing zone 102, and the proppant in the fracturing fluid can prevent the cracks from closing. The exploitation can be carried out by the pressure reduction method. After the decomposition of the hydrate in the fracturing area 102 is completed, CaCl2, urea and water are uniformly mixed in proportion on the offshore production platform 108 to prepare the reinforcement mother liquid of the reinforcement agent, and DSM33 bacteria, urease, nutrient solution and water are uniformly mixed in proportion to prepare the reaction agent of the reinforcement agent. The reinforcement mother liquid and the reaction agent of the reinforcement agent are respectively injected into the fracturing area 102 through the reinforcement mother liquid pipeline 208 and the reinforcement reaction agent pipeline 209 through the reinforcement agent nozzle 203 using the high-pressure pump of the high-pressure liquid injection system, and the crystallization reinforcement is allowed to stand for a period of time to wait for the fracturing area 102 to be converted into the reinforcement area 101. After the reinforcement of the reinforcement area 101 is completed, the fracturing fluid is continuously injected into the unexploited hydrate reservoir 103 using the high-pressure pump, and a part of the unexploited hydrate reservoir 103 is converted into the fracturing area 102 by secondary fracturing. The multi-stage process of subsequent repeated exploitation, reinforcement and fracturing is continuously expanded to continuously expand the scope of hydrate exploitation.

[0047] like Figure 3 As shown, the embodiment of the present invention and its implementation process include the following steps:

[0048] Step 1: Set up a liquid injection pipeline in the mining well

[0049] A number of pressure-resistant pipelines are arranged in the production well 104 for conveying fracturing fluid and reinforcing agent respectively, and the upper ends of the pressure-resistant pipelines are connected to the corresponding high-pressure liquid injection systems on the offshore production platform 108 .

[0050] Furthermore, the pipelines for transporting different liquids in the production well 104 are independent of each other to ensure that the independent injection of different liquids can be controlled, and the pipelines are pressure-resistant pipelines that can withstand the pressure difference between the inside and outside.

[0051] Specifically, four fracturing fluid pipelines 207, four reinforcing agent reinforced mother liquid pipelines 208 and four reinforcing agent reactant pipelines 209 are set in the production well 104, and the three pressure-resistant pipelines are respectively connected to the fracturing fluid nozzle 202, the reinforcing agent reinforced mother liquid spray hole 210 and the reinforcing agent reactant spray hole 211 of the reinforcing agent nozzle 203, and the upper end of the pressure-resistant pipeline is connected to the corresponding high-pressure liquid injection system on the offshore production platform 108, which are used to transport fracturing fluid and reinforcing agent respectively. The pipelines transporting different liquids are independent of each other to realize independent injection control of different liquids.

[0052] Step 2: Set up mining holes and nozzles on the mining well

[0053] In the part where the production well 104 contacts the natural gas hydrate reservoir 103 , openings and nozzles for fracturing, reinforcement and production are arranged at certain intervals. The nozzles extend outward from the openings, and the outer ends of the nozzles are flush with the sand control screen 205 .

[0054] Furthermore, a number of production openings 201 are provided on the production well 104, which serve as transmission channels for liquid and gas production during natural gas hydrate production; the outer side of the production well 104 is wrapped with a sand-proof screen 205, which can prevent sand from coming out of the hydrate reservoir 103 during the production process to block the production openings 201 on the production well 104 and the liquid and gas production channels including the production well 104.

[0055] Furthermore, the spray holes on the nozzles are circular spray holes, and each group of nozzles consists of a fracturing fluid nozzle 202 and a reinforcing agent nozzle 203, wherein the fracturing fluid nozzle 202 is provided with a spray hole for spraying fracturing fluid; the reinforcing agent nozzle 203 is provided with two spray holes, which are respectively used for spraying the reinforcing mother liquid of the reinforcing agent and the reactant of the reinforcing agent; each group of nozzles surrounds a production opening 201 to realize the injection of different liquids in the hydrate reservoir 103, and the nozzles extend outward from the wall 206 of the production well, pass through the sand-proof screen 205 wrapped around the outside of the production well 104, and the outermost end of the nozzle is flush with the outermost end of the sand-proof screen 205.

[0056] Specifically, in the portion where the production well 104 contacts the unexploited natural gas hydrate reservoir 103, four annularly centrally symmetrical production openings 201 are arranged at axial intervals of 2 meters. Each production opening 201 is surrounded by a fracturing fluid nozzle 202 and a reinforcement agent nozzle 203. The nozzles extend outward from the opening and extend out of the production well wall 206. The outer end of the nozzle is flush with the sand control screen 205.

[0057] Step 3: The nozzles are connected to the corresponding high-pressure liquid injection systems

[0058] The fracturing and reinforcement nozzles are respectively connected to the lower ends of the corresponding pressure-resistant pipes, so that the fracturing and reinforcement nozzles on the production well 104 are respectively connected to the corresponding high-pressure liquid injection systems on the offshore production platform 108, so as to control the fracturing fluid and reinforcement agent to be independently injected into the hydrate reservoir 103 through the nozzles.

[0059] Specifically, the fracturing fluid nozzle 202 and the reinforcement agent nozzle 203 are respectively connected to the lower ends of the corresponding pressure-resistant pipelines, that is, the fracturing fluid nozzle 202 is connected to the lower end of the fracturing fluid pipeline 207, and the two spray holes arranged on the reinforcement agent nozzle 203 (namely, the reinforcement agent reinforcement mother liquid spray hole 210 and the reinforcement agent reaction agent spray hole 211) are respectively connected to the lower ends of the reinforcement agent reinforcement mother liquid pipeline 208 and the reinforcement agent reaction agent pipeline 209, so that the fracturing fluid nozzle 202 and the reinforcement agent nozzle 203 are respectively connected to the corresponding high-pressure liquid injection system on the offshore production platform 108 through the corresponding pressure-resistant pipelines, so that the fracturing fluid and the reinforcement agent can be controlled to be independently injected into the hydrate reservoir 103 through the corresponding fracturing fluid nozzle 202 and the reinforcement agent nozzle 203.

[0060] Step 4: Prepare fracturing fluid and inject it into the hydrate reservoir

[0061] Fracturing fluid is prepared, and a high-pressure liquid injection system on an offshore production platform 108 is used to inject the fracturing fluid into the hydrate reservoir 103 through the fracturing fluid nozzle 202 on the production well 104 to form fracturing cracks in the hydrate reservoir 103. The porous material proppant in the fracturing fluid is deposited and fixed in the cracks to support the cracks and prevent them from closing, thereby improving the permeability of the fracturing zone 102 and forming a dominant seepage channel.

[0062] Furthermore, the fracturing fluid is a liquid with a specific viscosity. When injected into the hydrate reservoir 103, the pressure of the liquid is used to split the hydrate reservoir 103 to form a fracturing crack. The fracturing fluid can be a high-viscosity fracturing fluid such as guar gum and silicone oil, or a low-viscosity fracturing fluid such as sodium chloride solution. When the hydrate saturation of the hydrate reservoir 103 is high, a low-viscosity fracturing fluid can be used to facilitate the removal of the fracturing fluid during production; when the hydrate saturation of the hydrate reservoir 103 is low, a high-viscosity fracturing fluid can be used to reduce the loss of the fracturing fluid in the hydrate reservoir 103 and smoothly split the hydrate reservoir 103.

[0063] Among them, the components of the guar gum fracturing fluid are: 0.55% guar gum powder by mass, 0.6% cross-linking agent by mass, 0.2% ammonium persulfate by mass, 0.2% soybean lecithin by mass and water; the components of the sodium chloride solution fracturing fluid are: 3.5% sodium chloride aqueous solution by mass.

[0064] Furthermore, the proppant in the fracturing fluid can be a mixture of one or more materials selected from porous ceramic particles, porous calcium carbonate particles, polyester fibers, etc. The proppant is uniformly mixed in the fracturing fluid to form a suspension, that is, the fracturing fluid is a suspension.

[0065] Furthermore, the high-pressure liquid injection system includes two injection modes: constant pressure injection and constant flow injection. The high-pressure liquid injection system on the offshore production platform 108 is used to inject fracturing fluid into the unexploited hydrate reservoir 103 through the fracturing fluid nozzle 202 to form a fracturing crack, and part of the unexploited hydrate reservoir 103 is converted into a fracturing zone 102. The pressure or injection rate of the injected fracturing fluid is determined according to the mechanical parameters and pressure conditions of the hydrate reservoir 103 obtained by drilling before production. The minimum injection pressure p min The specific calculation formula is shown in formula (1):

[0066]

[0067] Wherein, K0 is the static earth pressure coefficient of the hydrate reservoir 103 at that location, Φ is the internal friction angle of the sediment of the hydrate reservoir 103, ρ' is the average effective density of the hydrate reservoir 103 and the overlying sediment layer, g is the gravitational acceleration, z is the burial depth of the hydrate reservoir 103 at that location, N P is the hydrate cohesion coefficient, c h is the cohesive force of the hydrate.

[0068] The fracturing fluid generates cleavage cracks in the hydrate reservoir 103 , and then the porous material proppant in the fracturing fluid is deposited and fixed in the cracks, supporting the cracks and preventing the cracks from closing during the production process, thereby improving the permeability of the fracturing zone 102 .

[0069] Step 5: Hydrate mining

[0070] The hydrate reservoir 103 is exploited by reducing pressure or combining pressure reduction with thermal shock through the exploitation opening 201 on the exploitation well 104, so that the hydrate in the fracturing zone 102 is rapidly decomposed and produced, wherein the duration of the gas production is determined according to the gas production rate characteristics.

[0071] Step 6: Prepare reinforcement agent and inject it into hydrate reservoir for reinforcement

[0072] Prepare a reinforcing agent, and use the high-pressure liquid injection system on the offshore production platform 108 to inject the reinforcing agent into the produced hydrate reservoir 103 through the fractures produced by fracturing through the reinforcing agent nozzle 203 on the production well 104, and let it stand for a period of time to reinforce the produced area.

[0073] Furthermore, the reinforcement agent is composed of a reinforcement mother liquid and a reactant, and the ratio of the reinforcement mother liquid to the reactant is determined according to the required reaction time and reinforcement strength; the reinforcement mother liquid and the reactant are respectively injected into the mined hydrate reservoir 103 through independent pressure-resistant pipes (i.e., the reinforcement mother liquid pipe 208 and the reinforcement reactant pipe 209) and the corresponding reinforcement mother liquid spray holes 210 and reinforcement reactant spray holes 211 on the reinforcement nozzle 203 for reinforcement; the reinforcement process is: first inject the reinforcement mother liquid for a period of time, and then inject the reactant to make it evenly fill the pores of the soil skeleton, let it stand for a period of time to wait for the formation of cement or crystals, and complete the reinforcement of the mined area to achieve the reinforcement effect.

[0074] Furthermore, when the reinforcement mother solution and the reactant react, a cement or crystal is formed in the pores of the hydrate reservoir 103, which can play a role in support and cementation reinforcement. The reaction between the two can be a chemical reaction or a biological reaction. The formation principle of the cement or crystal is shown in formula (2):

[0075]

[0076] Furthermore, the produced cement or crystal has high strength and porous characteristics. The cement or crystal is mainly generated at the contact point of the soil skeleton, which plays a role in cementing, fixing and reinforcing the soil skeleton, and maintains its pore channels without affecting the permeability of the reservoir.

[0077] Specifically, the concentration ratio of each component in the reinforcement mother solution of the reinforcement agent is: CaCl2 concentration 2mol / L, urea concentration 3mol / L and sufficient water; the concentration ratio of each component in the reaction agent of the reinforcement agent is: nutrient solution 6g / L, urease 2g / L, freeze-dried DSM33 bacteria 1g / L and sufficient water. The chemical reaction equations for bacteria-induced calcium carbonate crystals are shown in formula (3) and formula (4):

[0078]

[0079]

[0080] Specifically, by using the high-pressure liquid injection system on the offshore production platform 108, the reinforcement mother liquid is first injected into the cracks generated by fracturing through the reinforcement mother liquid injection hole 210 of the reinforcement nozzle 203 on the production well 104, and then the reactant is injected into the fracturing area 102 after production through the reinforcement reagent reagent injection hole 211 of the reinforcement nozzle 203 to fill the pores of the soil skeleton. The volume ratio of the reinforcement mother liquid and the reactant injected into the hydrate reservoir 103 is 1:1. The mixture is left to stand for a period of time to allow calcium carbonate crystals to precipitate, thereby reinforcing the produced area.

[0081] Furthermore, the pressure of the reinforcement injection should be less than or equal to the minimum injection pressure of the fracturing fluid. min To ensure that the reinforcement agent can fully fill the pores between the soil skeletons and will not disturb the soil skeleton, the minimum injection pressure p min Under the premise of increasing the injection rate of the reinforcement agent, the reinforcement efficiency can be improved.

[0082] Step 7: Hydrate reservoir fracturing-mining-reinforcement multi-process mining

[0083] According to the requirements of the hydrate exploitation range, steps 4 to 6 are repeated, and the unexploited hydrate reservoir 103 is first fractured to form a fracturing zone 102, and then the hydrate in the fracturing zone 102 is exploited. After the hydrate in the fracturing zone 102 is decomposed and exploited, a reinforcing agent is injected to convert the fracturing zone 102 into a reinforced zone 101, and then the unexploited hydrate reservoir 103 is continued to be fractured to expand the fracturing zone 102, and the hydrate reservoir 103 is efficiently exploited by a multi-process combined fracturing-exploitation-reinforcement, and the range of the fracturing zone 102 and the reinforced zone 101 is continuously expanded, the exploitation range is expanded, the permeability of the hydrate reservoir 103 and the stability of the soil skeleton around the exploitation well 104 are improved, the exploitation efficiency of methods such as pressure reduction is improved, and the instability risk of the soil skeleton around the exploitation well 104 is reduced.

[0084] Furthermore, according to the thickness of the hydrate reservoir 103, the hydrate saturation and permeability of the hydrate reservoir 103 and the requirements of the exploitation range of the hydrate reservoir 103, the operations of steps 4 to 6 can be repeated to perform multiple fracturing-exploitation-reinforcement; when performing the above operations on the expansion area, the fracturing fluid and reinforcement agent can be re-prepared as required, and the injection rate and injection pressure can be adjusted as required.

[0085] It can be seen from the implementation that the present invention innovatively adopts a multi-process combined efficient exploitation method of fracturing-exploitation-reinforcement, which has the advantages of novel method, simple operation, clear process, etc., filling the gap in the multi-process combined efficient exploitation technology of fracturing-exploitation-reinforcement of natural gas hydrate reservoirs, and providing new technology for the safe and efficient exploitation of deep-sea natural gas hydrates. It can solve the problems of low gas production rate and easy instability of reservoirs during natural gas hydrate exploitation, and can achieve the purpose of safe, stable and long-term sustainable exploitation of natural gas hydrates on site.

[0086] It should be noted that the embodiments of the present application have better practicability and are not any form of limitation to the present application. The technical features or combinations of technical features described in the embodiments of the present application should not be considered to be isolated, and they can be combined with each other to achieve better technical effects. The scope of the preferred implementation of the present application may also include other implementations, and this should be understood by those skilled in the art of the present application embodiment.

[0087] Techniques, methods, and devices known to those of ordinary skill in the relevant art may not be discussed in detail, but where appropriate, such techniques, methods, and devices should be considered part of the specification. In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not as limiting. Therefore, other examples of the exemplary embodiments may have different values.

[0088] The drawings of this application are in very simplified form and in non-precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of this application, and are not intended to limit the conditions under which this application can be implemented. Any structural modification, change in proportional relationship, or adjustment of size, without affecting the effects and purposes that can be achieved by this application, should be within the scope of the technical content disclosed in this application.

[0089] The above description is only a description of the preferred embodiment of the present application, and does not limit the scope of the present application. Any changes or modifications made by any ordinary technician familiar with the field according to the technical content disclosed above should be regarded as equivalent effective embodiments and fall within the scope of protection of the technical solution of the present application.

Claims

1. A multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement, characterized in that: The following steps are involved: Step 1: Set up a liquid injection pipeline in the mining well A plurality of pressure-resistant pipes are arranged in the production well (104) for conveying fracturing fluid and reinforcing agent respectively, and the upper ends of the pressure-resistant pipes are connected to corresponding high-pressure liquid injection systems on the offshore production platform (108); Step 2: Set up mining holes and nozzles on the mining well In the part where the mining well (104) contacts the natural gas hydrate reservoir (103), openings and nozzles for fracturing, reinforcement and mining are arranged at regular intervals, the nozzles extend outward from the openings, and the outer ends of the nozzles are flush with the sand control screen (205); Step 3: The nozzles are connected to the corresponding high-pressure liquid injection systems The fracturing and reinforcement nozzles are respectively connected to the lower ends of corresponding pressure-resistant pipes, so that the fracturing and reinforcement nozzles on the production well (104) are respectively connected to the corresponding high-pressure liquid injection systems on the offshore production platform (108), so as to control the fracturing fluid and reinforcement agent to be independently injected into the hydrate reservoir (103) through the nozzles; Step 4: Prepare fracturing fluid and inject it into the hydrate reservoir A fracturing fluid is prepared, and a high-pressure liquid injection system on an offshore production platform (108) is used to inject the fracturing fluid into a hydrate reservoir (103) through a fracturing fluid nozzle (202) on a production well (104), so as to form a fracturing crack in the hydrate reservoir (103), and the porous material proppant in the fracturing fluid is deposited and fixed in the crack; Step 5: Hydrate mining Depressurizing the hydrate reservoir (103) or exploiting it in a combined depressurization-heat shock manner through an exploitation opening (201) on an exploitation well (104) so ​​that the hydrate in the fracturing zone (102) is rapidly decomposed and produced; Step 6: Prepare reinforcement agent and inject it into hydrate reservoir for reinforcement A reinforcing agent is prepared, and a high-pressure liquid injection system on an offshore production platform (108) is used to inject the reinforcing agent into the produced hydrate reservoir (103) through the fractures produced by the fracturing through a reinforcing agent nozzle (203) on a production well (104), and the reinforcing agent is allowed to stand for a period of time to reinforce the produced area; Step 7: Hydrate reservoir fracturing-mining-reinforcement multi-process mining According to the requirements of the hydrate exploitation range, steps 4 to 6 are repeated, and the unexploited hydrate reservoir (103) is first fractured to form a fracture zone (102), and then the hydrate in the fracture zone (102) is exploited. After the hydrate in the fracture zone (102) is decomposed and exploited, a reinforcing agent is injected to convert the fracture zone (102) into a reinforcement zone (101), and then the unexploited hydrate reservoir (103) is continuously fractured to expand the fracture zone (102), and the hydrate reservoir (103) is subjected to a multi-process joint efficient exploitation of the fracturing-exploitation-reinforcement.

2. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1 is characterized in that: In the step 1, the pipelines for transporting different liquids in the production well (104) are independent of each other, and the pipelines are pressure-resistant pipelines that can withstand the pressure difference between the inside and outside.

3. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1 is characterized in that: In the step 2, a plurality of mining openings (201) are provided on the mining well (104), which are transmission channels for liquid and gas output during natural gas hydrate mining; and a sand-proof screen (205) is wrapped around the outside of the mining well (104).

4. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1 is characterized in that: In the step 2, the spray holes on the nozzles are circular spray holes, and each group of nozzles consists of a fracturing fluid nozzle (202) and a reinforcing agent nozzle (203), wherein the fracturing fluid nozzle (202) is provided with a spray hole for spraying fracturing fluid, and the reinforcing agent nozzle (203) is provided with a reinforcing agent reinforcing mother liquid spray hole (210) and a reinforcing agent reactant spray hole (211); each group of nozzles surrounds a production opening (201), and the nozzles extend outward from the wall (206) of the production well, pass through the sand control screen (205) wrapped around the outside of the production well (104), and the outermost end of the nozzle is flush with the outermost end of the sand control screen (205).

5. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1 is characterized in that: In the step 4, the fracturing fluid is a liquid with viscosity, and the fracturing fluid is a high-viscosity fracturing fluid or a low-viscosity fracturing fluid. The high-viscosity fracturing fluid includes guar gum fracturing fluid and silicone oil fracturing fluid, and the low-viscosity fracturing fluid includes sodium chloride solution fracturing fluid.

6. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1 is characterized in that: In the step 4, the proppant includes a mixture of one or more of porous ceramic particles, porous calcium carbonate particles, and polyester fiber materials; the proppant is uniformly mixed in the fracturing fluid to form a suspension.

7. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1 is characterized in that: In step 4, the high-pressure liquid injection system includes constant pressure injection and constant flow injection. The pressure or injection rate of the injected fracturing fluid is determined according to the mechanical parameters and pressure conditions of the hydrate reservoir (103) obtained by drilling before mining. The minimum injection pressure p min The calculation formula is: Where, K0 is the static earth pressure coefficient of the hydrate reservoir (103), Φ is the internal friction angle of the sediment in the hydrate reservoir (103), ρ' is the average effective density of the hydrate reservoir (103) and the overlying sediment layer, g is the gravitational acceleration, z is the burial depth of the hydrate reservoir (103), N P is the hydrate cohesion coefficient, c h is the cohesive force of the hydrate.

8. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1 is characterized in that: In the step six, the reinforcement agent is composed of a reinforcement mother liquid and a reactant, and the ratio of the reinforcement mother liquid to the reactant is determined according to the required reaction time and reinforcement strength; the reinforcement mother liquid is injected into the mined hydrate reservoir (103) through the reinforcement mother liquid pipeline (208) and the reinforcement mother liquid spray hole (210) on the reinforcement nozzle (203) for reinforcement, and the reactant is injected into the mined hydrate reservoir (103) through the reinforcement reactant pipeline (209) and the reinforcement reactant spray hole (211) on the reinforcement nozzle (203) for reinforcement; the reinforcement process is: first inject the reinforcement mother liquid for a period of time, and then inject the reactant to make it evenly fill the pores of the soil skeleton, let it stand for a period of time to wait for the formation of cement or crystals, and complete the reinforcement of the mined area.

9. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 8, characterized in that: When the consolidation mother solution reacts with the reactant, a cemented body or a crystal is formed in the pores of the hydrate reservoir (103). The formation principle is as shown in the following formula: The cemented body or crystal has porous characteristics and is generated at the contact point of the soil skeleton.

10. The multi-process combined efficient exploitation method of hydrate reservoir fracturing-exploitation-reinforcement according to claim 1, characterized in that: In step 6, the pressure of the reinforcing agent during injection is less than or equal to the minimum injection pressure p of the fracturing fluid. min .