A remote tower crane intelligent centralized control system based on 5G communication
Through the intelligent centralized control system of remote tower cranes based on 5G communication, the safety hazards and low efficiency problems in traditional tower crane operations are solved, and the remote control and real-time monitoring of tower cranes are realized, operating safety and efficiency are improved, and the operation is reduced. Manual operation cost.
Patent Information
- Application Number
- CN202411239451.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2044-09-05
AI Technical Summary
Traditional tower crane operation has problems of safety hazards and low efficiency, especially during high altitude operations and multi-tower crane construction, it is difficult to achieve effective collision analysis and monitoring.
The remote tower crane intelligent integrated control system based on 5G communication is adopted, and the remote control and real-time monitoring of the tower crane are realized through the combination of the tower crane side equipment system and the ground equipment system. The system includes a sensor system, a high-definition camera system, a patrol monitoring system, a car video charging system, a tower block safety monitoring system and a tower block side bridge system, and is equipped with a collision analysis encoding system for vertical cross collision analysis and plane slewing collision analysis.
It improves the safety and efficiency of tower crane operation, reduces the risks and costs of manual operation, enhances the monitoring and analysis capabilities of tower crane operation status, and ensures the safe and efficient operation of the equipment.
Smart Images

Figure CN118877746B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of remote control technology, and in particular to a remote intelligent centralized control system for a tower crane based on 5G communication used in construction. Background Art
[0002] With the rapid development of the construction industry, tower cranes (abbreviated as tower cranes) as important lifting equipment play an important role in construction. However, traditional tower crane operations rely on on-site personnel, which poses safety hazards and low efficiency. Due to high-altitude operations and a large working range, tower crane drivers often cannot see the situation of the hook clearly. During the construction process, there may even be a situation where the crane is across the mountain. At this time, a video solution can be used to solve the visualization problem of the tower crane driver. Since the tower crane hook moves with the tower crane trolley, the video camera can be installed on the tower crane's luffing trolley, and the camera is facing the hook below, so as to ensure that the video follows the hook. Due to the reciprocating movement of the tower crane trolley, the camera installed on the trolley is powered by the battery on the trolley, and the image is transmitted to the tower crane cockpit through a wireless bridge. In this case, the battery installed on the luffing trolley can be charged by solar energy, but the cost is too high, and the solar panels installed on the tower crane are easily damaged; another method is to use a mechanical charging device, which is low-cost and not affected by weather, but due to the different structures of tower cranes, the installation of the charging device becomes a thorny problem. The existing charging device installation structure has poor flexibility and cannot adapt to the installation of different tower crane structures. In addition, the installation location requirements are high, the operation is inconvenient, and there are certain safety hazards. In order to improve the safety and efficiency of tower crane operation, the present invention proposes a remote tower crane intelligent centralized control system based on 5G communication technology. Summary of the invention
[0003] In view of the above technical problems, the present invention provides a remote tower crane intelligent centralized control system based on 5G communication, which is implemented by the following technical solutions:
[0004] A remote tower crane intelligent centralized control system based on 5G communication, including several tower cranes, a centralized control platform and a ground equipment system; each tower crane is provided with a tower crane side equipment system, the tower crane side equipment system includes a sensor system, a high-definition camera system, a patrol monitoring system, a trolley video charging system, a tower crane safety monitoring system and a tower crane side bridge system; the ground equipment system includes an operating console and a ground-end bridge, and the ground-end bridge and the tower crane side equipment system are connected by 5G wireless network communication, and the rotation, lifting and stopping of several tower cranes are remotely controlled through the centralized control platform, and the centralized control platform is also provided with a control console. A collision monitoring system is provided, and the collision monitoring system is loaded with a collision analysis coding system. The collision analysis coding system is set to first determine whether the activated tower crane has a related tower crane. If there is a related tower crane, a collision analysis is performed. The encoder is first controlled to operate the activated tower crane, and the tower crane number is encoded 1, 2, 3...n. The activated tower crane code is set to i, and its coordinates are defined as (Xi, Yi, Zi). The turning radius of the activated tower crane is defined as Ri. All activated tower crane codes are compared, and the compared activated tower crane is stored as j, and its coordinates are defined as (Xj, Yj, Zj). The turning radius of the compared activated tower crane is defined as Rj. If there is a collision, When , tower crane No. j is determined to be the relevant tower crane, and collision analysis is performed on tower crane No. i, otherwise no collision analysis is required. The collision monitoring system obtains the boom elevation Hn, rotation radius Rn, rotation angle Jn, rotation speed Vn and boom length Ln of the n tower cranes by receiving data from the sensor system. The collision analysis coding system includes a vertical cross-collision analysis module and a plane rotation collision analysis module. The tower crane rotation angle, lifting height and stop selection are performed according to the vertical cross-collision analysis module and the plane rotation collision analysis module.
[0005] The plane rotation collision analysis module includes obtaining the rotation radius Rn of n tower cranes and the maximum rotation angle Tn of the tower cranes through the sensor system. When the collision analysis coding system works, it first determines whether to perform collision analysis according to the control encoder operation. When the plane rotation collision analysis is directly carried out, the angle between the exciting tower crane and the related tower crane is calculated as And set the condition of |Tj-Ti|>θ as the safe rotation condition.
[0006] The vertical cross-collision analysis includes obtaining the boom elevation Hn of n tower cranes and the lifting height Kn of the tower cranes through the sensor system, first determining whether to perform a collision analysis based on the collision analysis coding system, first determining whether the activated tower crane has a related tower crane, if there is a related tower crane for collision analysis, first controlling the encoder to perform additional tower crane operations, and directly calculating when performing additional tower crane operations. If i=j±1 occurs, it is necessary to perform a vertical cross-collision analysis on tower crane No. i. The vertical cross-collision analysis is performed using the elevation calculation method. Suppose the boom elevation Hi of the activated tower crane No. i and the lifting height Ki of the tower crane, and the boom elevation Hj of the related tower crane No. j and the lifting height Kj of the tower crane. When |Hi-Hj|>Ki occurs, it is determined that there is a vertical collision between the activated tower crane and the related tower crane.
[0007] To further avoid construction, the high-definition camera system includes a lifting gun, a boom gun, a working surface gun, a boom root camera, an arm tip camera, a panoramic camera, a fisheye camera, a wide-angle camera and a trolley video. There are two of the working surface guns and the trolley video. The lifting gun, the boom gun and the two trolley videos are all arranged in the lifting trolley. The two working surface guns are respectively arranged at the front and rear ends of the cockpit. The arm root camera is arranged at the connection between the boom and the tower body, the arm tip camera is arranged at the end of the crane arm, the panoramic camera is arranged at the bottom of the cockpit, the fisheye camera is arranged in the working platform, and the wide-angle camera is arranged on the top of the cockpit.
[0008] Furthermore, the patrol monitoring system includes a patrol car, a patrol track and a track cable. The patrol car is provided with a patrol camera and an electric shock arc. The patrol track is arranged on a balance arm and a lifting arm. The track cable is arranged above the patrol track. The patrol car travels in the patrol track and receives power through the electric shock arc above that touches the track cable to ensure 24-hour uninterrupted monitoring. The electric shock arc is articulated with the patrol car.
[0009] Furthermore, the trolley video charging system includes a charging device, a charging bridge, an indicator light and a charging control box, and the charging bridge, the indicator light and the charging control box are all arranged on the working platform; the tower crane safety monitoring system includes a main control and a display screen, which are both arranged in the cockpit; the tower crane side bridge system includes a tower crane side bridge and a bridge electrical cabinet, which are both arranged on the working platform.
[0010] Furthermore, a control program is provided in the operating console of the ground equipment system, and the control program can connect to the tower crane side bridge through the ground-end bridge, obtain the information of the tower crane side equipment system and control the tower crane.
[0011] Furthermore, the lifting gun machine, the luffing gun machine and the two trolleys are all powered by batteries, and the lifting trolley is driven to the charging device for charging when not in operation.
[0012] It also includes the remote control system operation steps of the above systems:
[0013] Step 1: Turn on the remote control knob, emergency stop button, and closing button on the console in sequence, check the connection status of each part on the software homepage, and after they are all connected normally, turn on the unlock knob on the console to start remote operation;
[0014] Step 2: Start the control program in the console computer and conduct a quality inspection on the tower crane availability. The quality inspection process includes whether the video is available during operation, whether the console controller is connected normally, whether the tower crane controller is connected normally, and whether the tower crane anti-collision system data center is connected normally; enter the quality inspection, this process includes 4 steps; any step detection abnormality will display abnormal information, among which the first step cannot be ignored. When this step is abnormal, the system cannot enter the home page. If there is an abnormality in the second, third, and fourth steps, click Next to continue the detection and ignore the abnormality to enter the home page; when the quality inspection is completed, the system will automatically enter the home page, and open the video window according to the user's configured habits, and load the configured video to the corresponding display screen;
[0015] Step 3: Start to obtain the information of the equipment system on the tower crane side and operate the tower crane;
[0016] Step 4: After the operation is completed, the lifting trolley automatically returns to the charging device and waits for charging of the loaded video.
[0017] The remote tower crane intelligent centralized control system based on 5G communication of the present invention has the following significant beneficial effects:
[0018] Improve operational safety: The collision analysis coding system includes a vertical cross-collision analysis module and a plane rotation collision analysis module. By performing vertical and horizontal collision analysis under different conditions, the safety of multiple tower cranes during simultaneous construction is ensured. Operators can operate tower cranes in a safe environment, avoiding the risk of working directly at high altitudes, which significantly improves operational safety. The implementation of the remote centralized control system reduces dependence on on-site operators, thereby reducing labor costs and management costs.
[0019] Improve operational efficiency: Utilizing the high speed and low latency characteristics of 5G communication technology, the remote tower crane intelligent centralized control system can achieve real-time remote control, reducing the time and complexity of on-site operations, thereby improving operational efficiency; at the same time, the introduction of 5G communication technology ensures the transmission stability and reliability of remote control signals, reducing operational errors caused by communication problems; 5G communication technology enables remote intelligent centralized control of tower cranes, improves the safety and efficiency of tower crane operations, reduces labor costs, and enables all-round monitoring and data collection through high-definition camera systems and sensor systems.
[0020] Enhanced monitoring capabilities: The high-definition camera system and sensor system equipped in the system can provide a full range of monitoring perspectives and real-time data, allowing operators to have a more comprehensive understanding of the tower crane's operating status and surrounding environment; at the same time, through the data collected by the system, the tower crane's operating status can be monitored and analyzed in real time, potential faults and problems can be discovered and handled in a timely manner, and the maintenance management of the equipment can be optimized.
[0021] Improve energy utilization efficiency: The intelligent design of the trolley video charging system has multiple adjustable degrees of freedom and good flexibility. It is suitable for different tower cranes, ensuring that the equipment can be charged in time when not in operation, avoiding energy waste and improving energy utilization efficiency.
[0022] Strong environmental adaptability: The system design takes into account a variety of environmental factors. For example, the use of wind speed sensors can ensure the safe operation of tower cranes under different weather conditions.
[0023] From the description of the above technical effects, it can be seen that the present invention not only improves the safety and efficiency of tower crane operation, but also contributes to the intelligence and automation of building construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the implementation modes of the present application, the drawings required for use in the description of the implementation modes will be briefly introduced below. Obviously, the drawings described below are only some implementation modes of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0025] Figure 1 It is a structural schematic diagram of the tower crane side equipment system of the present invention.
[0026] Figure 2 It is the layout diagram of the working platform of the present invention.
[0027] Figure 3 It is a schematic diagram of the structure of the patrol monitoring system of the present invention.
[0028] Description of reference numerals:
[0029] 100-tower crane, 101-balance arm, 102-lifting arm, 103-tower body, 200-patrol trolley, 201-patrol track, 202-track cable, 203-electric arc, 300-charging device, 400-charging bridge, 401-indicator light, 402-charging control box, 500-tower crane side bridge, 501-bridge electrical cabinet. DETAILED DESCRIPTION
[0030] The following description of the embodiments will help the public better understand the present invention, but the specific embodiments given by the applicant cannot and should not be regarded as limitations on the technical solutions of the present invention. Any changes to the definitions of components or technical features, or formal rather than substantive changes to the overall structure should be regarded as the scope of protection defined by the technical solutions of the present invention.
[0031] In this application, unless otherwise clearly specified or limited, the terms "installation", "connection", "fixation" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be internal communication between two elements, or it can be only surface contact, or surface contact connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0032] The present invention is implemented by the following technical solutions:
[0033] A remote tower crane intelligent centralized control system based on 5G communication is implemented using the following technical solutions:
[0034] See also Figure 1-3, Embodiment 1, provides a remote tower crane intelligent centralized control system based on 5G communication, including several tower cranes, a centralized control platform and a ground equipment system; each tower crane is provided with a tower crane side equipment system, and the tower crane side equipment system includes a sensor system, a high-definition camera system, a patrol monitoring system, a trolley video charging system, a tower crane safety monitoring system and a tower crane side bridge system. The sensor system includes a height sensor, an amplitude sensor, a slew sensor, a wind speed sensor, a weight sensor, a slew joint inclination sensor and an arm tip inclination sensor. The height sensor and the amplitude sensor are arranged in the lifting trolley, the slew sensor is arranged at the connection between the boom and the tower body 103, the wind speed sensor is arranged on the top of the cockpit, the weight sensor is arranged on one side of the balance arm 101, and the slew joint inclination sensor and the arm tip inclination sensor are arranged at the end of the lifting arm 102. The high-definition camera system includes a lifting gun, a luffing gun, a working surface gun, a boom root camera, an arm tip camera, a panoramic camera, a fisheye camera, a wide-angle camera and a trolley video. There are two working surface guns and two trolley videos. The lifting gun, the luffing gun and the two trolley videos are all arranged in the lifting trolley. The two working surface guns are respectively arranged at the front and rear ends of the cockpit. The arm root camera is arranged at the connection between the boom and the tower body 103, the arm tip camera is arranged at the end of the lifting arm 102, the panoramic camera is arranged at the bottom of the cockpit, the fisheye camera is arranged in the working platform, and the wide-angle camera is arranged on the top of the cockpit. The patrol monitoring system includes a patrol car 200, a patrol track 201 and a track cable 202. The patrol car 200 is provided with a patrol camera and an electric arc 203. The patrol track 201 is arranged on the balance arm 101 and the lifting arm 102. The track cable 202 is arranged above the patrol track 201. The patrol car 200 walks in the patrol track 201 and receives power by touching the track cable 202 through the electric arc 203 above, so as to ensure 24-hour uninterrupted monitoring. The electric arc 203 is hinged with the patrol car 200. The car video charging system includes a charging device 300, a charging bridge 400, an indicator light 401 and a charging control box 402. The charging bridge 400, the indicator light 401 and the charging control box 402 are all arranged on the working platform; the tower crane safety monitoring system includes a main control and a display screen, which are all arranged in the cockpit; the tower crane side bridge system includes a tower crane side bridge 500 and a bridge electric cabinet 501, which are all arranged on the working platform. The lifting gun machine, the luffing gun machine and the two trolleys are all powered by batteries, and when not in operation, the lifting trolley is driven to the charging device 300 for charging.
[0035] Embodiment 2 is based on Embodiment 1 and provides a remote tower crane intelligent centralized control system based on 5G communication, including several tower cranes, a centralized control platform and a ground equipment system; each tower crane is provided with a tower crane side equipment system, and the tower crane side equipment system includes a sensor system, a high-definition camera system, a patrol monitoring system, a trolley video charging system, a tower crane safety monitoring system and a tower crane side bridge system; the ground equipment system includes an operating console and a ground-end bridge, and a communication connection is established between the ground-end bridge and the tower crane side equipment system through 5G wireless network communication, and the rotation, lifting and shutdown of several tower cranes are remotely controlled through the centralized control platform. The centralized control platform is also provided with a collision monitoring system, which is loaded with a collision analysis coding system. The collision analysis coding system is configured to first determine whether the activated tower crane has a related tower crane. If there is a related tower crane, a collision analysis is performed. The encoder is first controlled to operate the activated tower crane, and the tower crane number is encoded as 1, 2, 3...n. The activated tower crane code is set as i, and its coordinates are defined as (Xi, Yi, Zi). The turning radius of the activated tower crane is defined as Ri. All activated tower crane codes are compared, and the compared activated tower crane is stored as j, and its coordinates are defined as (Xj, Yj, Zj). The turning radius of the compared activated tower crane is defined as Rj. If a collision occurs, When , tower crane No. j is determined to be the relevant tower crane, and collision analysis is performed on tower crane No. i, otherwise no collision analysis is required. The collision monitoring system obtains the boom elevation Hn, rotation radius Rn, rotation angle Jn, rotation speed Vn and boom length Ln of the n tower cranes by receiving data from the sensor system. The collision analysis coding system includes a vertical cross-collision analysis module and a plane rotation collision analysis module. The tower crane rotation angle, lifting height and stop selection are performed according to the vertical cross-collision analysis module and the plane rotation collision analysis module.
[0036] The plane rotation collision analysis module includes obtaining the rotation radius Rn of n tower cranes and the maximum rotation angle Tn of the tower cranes through the sensor system. When the collision analysis coding system works, it first determines whether to perform collision analysis according to the control encoder operation. When the plane rotation collision analysis is directly carried out, the angle between the exciting tower crane and the related tower crane is calculated as And set the condition of |Tj-Ti|>θ as the safe rotation condition.
[0037] The vertical cross-collision analysis includes obtaining the boom elevation Hn of n tower cranes and the lifting height Kn of the tower cranes through the sensor system, first determining whether to perform a collision analysis based on the collision analysis coding system, first determining whether the activated tower crane has a related tower crane, if there is a related tower crane for collision analysis, first controlling the encoder to perform additional tower crane operations, and directly calculating when performing additional tower crane operations. If i=j±1 occurs, it is necessary to perform a vertical cross-collision analysis on tower crane No. i. The vertical cross-collision analysis is performed using the elevation calculation method. Suppose the boom elevation Hi of the activated tower crane No. i and the lifting height Ki of the tower crane, and the boom elevation Hj of the related tower crane No. j and the lifting height Kj of the tower crane. When |Hi-Hj|>Ki occurs, it is determined that there is a vertical collision between the activated tower crane and the related tower crane.
[0038] A control program is provided in the operating console of the ground equipment system. The control program can connect to the tower crane side bridge 500 through the ground-end bridge to obtain the information of the tower crane side equipment system and control the tower crane.
[0039] Based on the above remote tower crane intelligent centralized control system, remote operation is performed through the following steps:
[0040] Step 1: Touch the power button of the computer host, which is at the lower right of the console desktop. Enter the correct power-on password after powering on. Turn on the remote control knob, emergency stop button, and closing button on the console in sequence. Check the connection status of each part on the software homepage. After all the connections are normal, turn on the unlock knob on the console to start remote operation.
[0041] Step 2: Find the client software icon on the computer desktop and double-click it to start the software;
[0042] Step 3: After starting the software, if the interface does not appear, double-click the client software icon again, enter your account and password, and click the "Login" button;
[0043] Step 4: Please read the operating specifications carefully before using the system software (you cannot check if you have not read them), and check "I have read and agreed" after fully understanding them. Continue to click OK to proceed to the next step;
[0044] Step 5: After the system login is completed, the tower crane selection interface opens. This interface is divided into two parts: 1. Hoisting task list; 2. Tower crane selection. Select a tower crane that is unused and click "Select Tower Crane" (or double-click the selected tower crane item);
[0045] Step 6: Before entering the home page, we first conduct a quality inspection on the tower crane availability. The quality inspection process includes whether the video is available during operation, whether the console controller is connected normally, whether the tower crane controller is connected normally, and whether the tower crane anti-collision system data center is connected normally. Enter the quality inspection, this process includes 4 steps. If any step detects an abnormality, the abnormality information will be displayed. The first step cannot be ignored. When this step is abnormal, the system cannot enter the home page. If there is an abnormality in the second, third, and fourth steps, you can continue to detect and ignore the abnormality to enter the home page. When the quality inspection is completed, the system will automatically enter the home page, open the video window according to the user's configured habits, and load the configured video to the corresponding display screen;
[0046] Step 7: Click the assisted driving icon to open the extended functions integrated in the system. It is recommended to use the group tower anti-collision function for daily operation and the three-dimensional anti-collision function for observation; start to obtain the information of the equipment system on the tower crane side and operate the tower crane;
[0047] Step 8: When switching tower cranes, click the switch tower crane icon, return to the selection page, and select another tower crane for operation;
[0048] Step 9: When exiting the system, click "Logout" to return to the software homepage, and click the "Exit System" button to exit the current system;
[0049] Step 10: Shut down the computer. Use the mouse to shut down the computer. Do not directly press the computer power button on the console to force shutdown.
[0050] Step 11: After the operation is completed, the lifting trolley automatically returns to the charging device 300 and waits for charging of the loaded video.
[0051] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.
[0052] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.
Claims
1. A remote tower crane intelligent centralized control system based on 5G communication, including several tower cranes, a centralized control platform and a ground equipment system; each tower crane is provided with a tower crane side equipment system, the tower crane side equipment system includes a sensor system, a high-definition camera system, a patrol monitoring system, a trolley video charging system, a tower crane safety monitoring system and a tower crane side bridge system; the ground equipment system includes an operating console and a ground-end bridge, and the ground-end bridge and the tower crane side equipment system are connected by 5G wireless network communication, and the rotation, lifting and shutdown of several tower cranes are remotely controlled through the centralized control platform, characterized in that: The centralized control platform is also provided with a collision monitoring system, which is loaded with a collision analysis coding system. The collision analysis coding system is configured to first determine whether the activated tower crane has a related tower crane. If there is a related tower crane, a collision analysis is performed. The encoder is first controlled to operate the activated tower crane, and the tower crane number is encoded as 1, 2, 3...n. The activated tower crane code is set as i, and its coordinates are defined as (Xi, Yi, Zi). The turning radius of the activated tower crane is defined as Ri. All activated tower crane codes are compared, and the compared activated tower crane is stored as j, and its coordinates are defined as (Xj, Yj, Zj). The turning radius of the compared activated tower crane is defined as Rj. If Ri+Rj≤ When , tower crane No. j is determined to be the relevant tower crane, and collision analysis is performed on tower crane No. i, otherwise no collision analysis is required. The collision monitoring system obtains the boom elevation Hn, rotation radius Rn, rotation angle Jn, rotation speed Vn and boom length Ln of the n tower cranes by receiving data from the sensor system. The collision analysis coding system includes a vertical cross-collision analysis module and a plane rotation collision analysis module. The tower crane rotation angle, lifting height and stop selection are performed according to the vertical cross-collision analysis module and the plane rotation collision analysis module.
2. According to the 5G communication-based remote tower crane intelligent centralized control system according to claim 1, it is characterized in that: The plane rotation collision analysis module includes obtaining the rotation radius Rn of n tower cranes and the maximum rotation angle Tn of the tower cranes through the sensor system. When the collision analysis coding system is working, it first determines whether to perform collision analysis according to the control encoder operation. If Ri+Rj≤ When the plane rotation collision analysis is directly carried out, the angle between the exciting tower crane and the related tower crane is calculated as , and set |Tj-Ti|> The condition is the safe rotation condition.
3. A remote tower crane intelligent centralized control system based on 5G communication according to claim 1 or 2, characterized in that: The vertical cross-collision analysis includes obtaining the boom elevation Hn of n tower cranes and the lifting height Kn of the tower cranes through the sensor system, first determining whether to perform a collision analysis based on the collision analysis coding system, first determining whether the activated tower crane has a related tower crane, if there is a related tower crane for collision analysis, first controlling the encoder to perform additional tower crane operations, and directly calculating when performing additional tower crane operations. If i=j±1 occurs, it is necessary to perform a vertical cross-collision analysis on tower crane No. i. The vertical cross-collision analysis is performed using the elevation calculation method. Suppose the boom elevation Hi of the activated tower crane No. i and the lifting height Ki of the tower crane, and the boom elevation Hj of the related tower crane No. j and the lifting height Kj of the tower crane. When |Hi-Hj|>Ki occurs, it is determined that there is a vertical collision between the activated tower crane and the related tower crane, and construction avoidance is performed.
4. According to the 5G communication-based remote tower crane intelligent centralized control system of claim 1, it is characterized by: The sensor system comprises a height sensor, an amplitude sensor, a slew sensor, a wind speed sensor, a weight sensor, a slew joint inclination sensor and a boom tip inclination sensor; the height sensor and the amplitude sensor are arranged in the lifting trolley, the slew sensor is arranged at the connection between the boom and the tower body (103), the wind speed sensor is arranged on the top of the cockpit, the weight sensor is arranged on one side of the balance arm (101), and the slew joint inclination sensor and the boom tip inclination sensor are arranged at the end of the lifting arm (102).
5. According to claim 4, a remote tower crane intelligent centralized control system based on 5G communication is characterized in that: The high-definition camera system comprises a lifting gun, a luffing gun, a working surface gun, a boom root camera, a boom tip camera, a panoramic camera, a fisheye camera, a wide-angle camera and a trolley video. Two working surface guns and two trolley videos are provided. The lifting gun, the luffing gun and the two trolley videos are all provided in the lifting trolley. The two working surface guns are provided at the front and rear ends of the cockpit respectively. The boom root camera is provided at the connection between the boom and the tower body (103). The boom tip camera is provided at the end of the boom (102). The panoramic camera is provided at the bottom of the cockpit. The fisheye camera is provided in the working platform. The wide-angle camera is provided at the top of the cockpit.
6. According to the 5G communication-based remote tower crane intelligent centralized control system of claim 5, it is characterized by: The patrol monitoring system comprises a patrol trolley (200), a patrol track (201) and a track cable (202); the patrol trolley (200) is provided with a patrol camera and an electric arc (203); the patrol track (201) is provided on a balancing arm (101) and a lifting arm (102); the track cable (202) is provided above the patrol track (201); the patrol trolley (200) travels in the patrol track (201) and receives power by contacting the track cable (202) through the electric arc (203) above, thereby ensuring 24-hour uninterrupted monitoring; the electric arc (203) is hinged to the patrol trolley (200).
7. According to claim 6, a remote tower crane intelligent centralized control system based on 5G communication is characterized in that: The trolley video charging system comprises a charging device (300), a charging bridge (400), an indicator light (401) and a charging control box (402), wherein the charging bridge (400), the indicator light (401) and the charging control box (402) are all arranged on an operating platform; the tower crane safety monitoring system comprises a main control and a display screen, both of which are arranged in a cockpit; and the tower crane side bridge system comprises a tower crane side bridge (500) and a bridge electric cabinet (501), both of which are arranged on the operating platform.
8. According to the 5G communication-based remote tower crane intelligent centralized control system of claim 7, it is characterized by: A control program is arranged in the operating console of the ground equipment system. The control program can connect to the tower crane side network bridge (500) through the ground end network bridge, obtain information of the tower crane side equipment system and perform control operations on the tower crane.
9. The remote tower crane intelligent centralized control system based on 5G communication according to claim 8 is characterized in that: The lifting gun machine, the luffing gun machine and the two trolleys are all powered by batteries, and when not in operation, the lifting trolley is driven to the charging device (300) for charging.
10. An operation step of the remote tower crane intelligent centralized control system based on 5G communication according to claim 9, characterized in that: The following steps are involved: Step 1: Turn on the remote control knob, emergency stop button, and closing button on the console in sequence, check the connection status of each part on the software homepage, and after they are all connected normally, turn on the unlock knob on the console to start remote operation; Step 2: Start the control program in the console computer and conduct a quality inspection on the tower crane availability. The quality inspection process includes whether the video is available during operation, whether the console controller is connected normally, whether the tower crane controller is connected normally, and whether the tower crane anti-collision system data center is connected normally; enter the quality inspection, this process includes 4 steps; any step detection abnormality will display abnormal information, among which the first step cannot be ignored. When this step is abnormal, the system cannot enter the home page. If there is an abnormality in the second, third, and fourth steps, click Next to continue the detection and ignore the abnormality to enter the home page; when the quality inspection is completed, the system will automatically enter the home page, and open the video window according to the user's configured habits, and load the configured video to the corresponding display screen; Step 3: Start to obtain the information of the equipment system on the tower crane side and operate the tower crane; Step 4: After the operation is completed, the lifting trolley automatically returns to the charging device (300) and waits for charging of the loaded video.