Construction method of pipe jacking machine in narrow space
Through the step-by-step lifting and lifting installation methods of split pipe hoisting machines, the problems of long construction cycle, high safety risks and serious resource waste in narrow spaces are solved, and a more efficient and safe construction process is achieved .
Patent Information
- Application Number
- CN202411536224.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-12-27
AI Technical Summary
The traditional pipe header construction method has a long construction cycle in a small space, a large demand for work well space, high safety risks in hole breaking, and high construction costs in narrow receiving wells, which are serious waste of resources.
Using a split pipe hoisting machine, the pipe hoisting machine is split into multiple shields, and each shield is composed of the upper and lower shields arranged oppositely, and is lifted and assembled in steps, combined with the upper and lower shields, and installed in combination with the upper and lower push. Shorten the construction cycle, improve safety, and facilitate lifting and adjusting lifting posture in small receiving wells to avoid waste of resources.
It effectively shortens the construction cycle, improves construction safety, reduces resource waste, reduces construction costs, and avoids the situation where the pipe hoist shell remains in the tunnel.