Construction waste crushing device

By setting up multiple crushing and screening systems in the construction waste crushing device, the problems of incomplete crushing and lack of screening are solved, the processing efficiency and safety are improved, and the environmental impact is reduced.

CN221907319UActive Publication Date: 2024-10-29JINAN SECOND CONSTR GRP ENG CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323540657.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-10-29
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The existing construction waste crushing device has incomplete crushing and lacks screening devices, resulting in low processing efficiency.

Method used

Design a crushing device containing two cavities. Each cavity is equipped with a crushing device, and multiple crushing and screening are carried out through filter plates and recovery boxes. It is combined with dust reduction components to improve the crushing effect and safety.

Benefits of technology

It achieves complete crushing and efficient screening of construction waste, reduces subsequent processing time, reduces the impact of the crushing process on the environment, and improves the safety of the crushing device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221907319U_ABST
    Figure CN221907319U_ABST
Patent Text Reader

Abstract

The utility model provides a construction waste smashing device, belongs to the technical field of smashing devices, and solves the technical problems that an existing construction waste smashing device is incomplete in smashing work and does not contain a screening device, and the treatment efficiency of construction waste is affected. A machine body is arranged, a partition plate is arranged in the machine body, the machine body is divided by the partition plate into a first cavity and a second cavity, smashing devices are arranged in the first cavity and the second cavity, a first filter plate is connected into the first cavity, and the first filter plate is higher than the smashing devices in the second cavity. The second filter plate is connected in the second cavity, a third filter plate is further connected in the machine body, a first recycling box is arranged below the third filter plate, a second recycling box is arranged on one side of the machine body, and the machine body is connected with the second recycling box through a guide plate; a third recycling box is connected to the position, corresponding to the second filter plate, of the other side of the machine body, and dust falling assemblies are further arranged in the first cavity and the second cavity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of crushing devices, and more specifically, to a construction waste crushing device. Background Art

[0002] Construction waste refers to the slag, abandoned soil, abandoned materials, silt and other waste generated during the construction, laying, demolition and repair of various buildings, structures, pipelines, etc. by construction units or individuals.

[0003] Some construction waste generated in construction projects is often large in size and difficult to be crushed completely in one go. However, some current garbage crushers often only crush the construction waste once, resulting in incomplete crushing of the construction waste. In addition, the crushing machine does not contain a screening device, which means that after the construction waste is crushed, it is necessary to screen the construction waste and then process it, affecting the efficiency of construction waste processing. Utility Model Content

[0004] In order to solve the technical problem that the existing construction waste crushing device has incomplete crushing work and no screening device, which affects the processing efficiency of construction waste, a construction waste crushing device with complete crushing and screening device is provided.

[0005] To achieve the above-mentioned purpose, the technical solution adopted in the present application is: a construction waste crushing device, which is provided with a body, a partition is provided in the body, the body is divided by the partition to form a first cavity and a second cavity, a crushing device is provided in the first cavity and the second cavity, a first filter plate is connected to the bottom of the crushing device in the first cavity, the height of the first filter plate is higher than the height of the crushing device in the second cavity, a connecting port is provided at a position corresponding to the partition and the second filter plate, a second filter plate is connected to the bottom of the crushing device in the second cavity, a third filter plate is connected to the bottom of the first filter plate and the second filter plate in the body, a first recycling box is provided below the third filter plate, a second recycling box is provided on one side of the body, the body is connected to the second recycling box through a guide plate, and the other side of the body is connected to the third recycling box at a position corresponding to the second filter plate, and a dust reduction component is also provided in the first cavity and the second cavity.

[0006] Preferably, the crushing device comprises two motors, the output ends of the two motors are respectively connected to two rotating shafts, and the two rotating shafts are connected to crushing blocks.

[0007] Preferably, the first recycling box, the second recycling box and the third recycling box are all connected to the dust reduction assembly through connecting pipes. The dust reduction assembly includes a water pipe, which is connected to the connecting pipe. A plurality of nozzles are connected to the water pipe, and the positions of the plurality of nozzles correspond to the positions of the crushing device.

[0008] Preferably, the bottom of the first recovery box is connected to a fourth filter plate, the bottom of the second recovery box is connected to a fifth filter plate, and the bottom of the third recovery box is connected to a sixth filter plate.

[0009] Preferably, a weight sensor is also connected to the bottom of the third recycling box, an indicator light is connected to one side of the third recycling box, and the weight sensor is electrically connected to the indicator light.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] The utility model can perform secondary crushing of construction waste by arranging a first cavity and a second cavity, and arranging crushing devices in the first cavity and the second cavity respectively, thereby ensuring the crushing effect of the construction waste; by arranging a third filter plate to screen the crushed construction waste, the time required for subsequent screening of the construction waste is saved, and the processing efficiency of the construction waste is accelerated; the dust reduction component is arranged to play a dust reduction role on the one hand, reducing the impact of the crushing work on the environment, and on the other hand, it can cool the crushing device to ensure the safety of the crushing work. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0013] Figure 1 It is a structural schematic diagram of the utility model.

[0014] Explanation of symbols in the figure:

[0015] 1. Machine body; 2. Partition; 3. First cavity; 4. Second cavity; 5. Crushing device; 6. First filter plate; 7. Connecting port; 8. Second filter plate; 9. Third filter plate; 10. First recycling box; 11. Second recycling box; 12. Guide plate; 13. Third recycling box; 14. Motor; 15. Rotating shaft; 16. Crushing block; 17. Connecting pipe; 18. Water pipe; 19. Nozzle; 20. Fourth filter plate; 21. Fifth filter plate; 22. Sixth filter plate; 23. Weight sensor; 24. Indicator light. DETAILED DESCRIPTION

[0016] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0017] It should be noted that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0018] like Figure 1 As shown, the present application provides a construction waste crushing device 5, which is provided with a body 1, a partition plate 2 is provided in the body 1, the body 1 is divided by the partition plate 2 to form a first cavity 3 and a second cavity 4, the first cavity 3 and the second cavity 4 are both provided with a crushing device 5, a first filter plate 6 is connected to the lower part of the crushing device 5 in the first cavity 3, the height of the first filter plate 6 is higher than the height of the crushing device 5 in the second cavity 4, a connecting port 7 is provided at a position corresponding to the partition plate 2 and the second filter plate 8, a second filter plate 8 is connected to the lower part of the crushing device 5 in the second cavity 4, a third filter plate 9 is connected to the lower part of the first filter plate 6 and the second filter plate 8 in the body 1, a first recycling box 10 is provided below the third filter plate 9, a second recycling box 11 is provided on one side of the body 1, the body 1 is connected to the second recycling box 11 through a guide plate 12, a third recycling box 13 is connected to the other side of the body 1 at a position corresponding to the second filter plate 8, and a dust reduction component is also provided in the first cavity 3 and the second cavity 4.

[0019] In the technical solution adopted in the present embodiment, by setting the first cavity 3 and the second cavity 4, and setting the crushing device 5 in the first cavity 3 and the second cavity 4, the construction waste can be crushed twice, thereby ensuring the crushing quality of the construction waste. By setting the first filter plate 6, the construction waste that does not meet the crushing standard can be filtered, and the construction waste that meets the crushing standard passes through the first filter plate 6 and falls to the surface of the third filter plate 9. The construction waste that does not meet the crushing standard enters the crushing device 5 in the second cavity 4 through the connecting port 7 under the guidance of the first filter plate 6, and is crushed twice. The construction waste after the second crushing falls to the surface of the second filter plate 8. The second filter plate 8 filters the construction waste that does not meet the crushing standard after crushing, and the construction waste that meets the crushing standard passes through the second filter plate 8 and falls to the third filter plate 8. Plate 9 surface, construction waste that does not meet the crushing standard is discharged from the body 1 under the guidance of the second filter plate 8 and enters the third recycling box 13. It should be noted that the body 1 is provided with a discharge port at a position corresponding to the second filter plate 8, which is convenient for construction waste to be discharged from the body 1 from the discharge port and enter the third recycling box 13. The third filter plate 9 can be set to further screen the construction waste that meets the crushing standard, thereby saving the time used for screening construction waste in the subsequent recycling process. Smaller construction waste passes through the third filter plate 9 and enters the first recycling box 10, and larger construction waste enters the second recycling box 11 through the guide plate 12 under the guidance of the third filter plate 9. By setting a dust reduction component, the dust generated during the crushing of construction waste can be reduced, and the crushing device 5 can also be cooled to ensure the safety of the crushing process.

[0020] Furthermore, in this embodiment, the crushing device 5 includes two motors 14 , and the output ends of the two motors 14 are respectively connected to two rotating shafts 15 , and the two rotating shafts 15 are both connected to crushing blocks 16 .

[0021] In the technical solution adopted in this embodiment, two motors 14 are provided to drive two rotating shafts 15 to rotate toward each other, so that the two rotating shafts 15 drive two crushing blocks 16 to rotate toward each other. Under the joint action of the two crushing blocks 16, the construction waste can be crushed to achieve the crushing function.

[0022] Furthermore, in the present embodiment, the first recycling box 10, the second recycling box 11 and the third recycling box 13 are all connected to the dust reduction assembly via a connecting pipe 17. The dust reduction assembly includes a water pipe 18, which is connected to the connecting pipe 17. A plurality of nozzles 19 are connected to the water pipe 18. The positions of the plurality of nozzles 19 correspond to the positions of the crushing device 5.

[0023] In the technical solution adopted in this embodiment, a first recycling box 10 is provided for recycling construction waste that meets the crushing standards and has smaller particles, a second recycling box 11 is provided for recycling construction waste that meets the crushing standards and has larger particles, a third recycling box 13 is provided for recycling construction waste that does not meet the crushing standards, and a dust reduction component is provided for reducing dust generated during the crushing process of the construction waste. The crushing device 5 can also be cooled. Specifically, water is supplied to the nozzle 19 through a connecting pipe 17 and a water pipe 18 so that water is sprayed from the nozzle 19 to achieve the purpose of dust reduction. It should be noted that water pumps are provided in the first recycling box 10, the second recycling box 11 and the third recycling box 13 to provide power for the flow of dust reduction water. By connecting the connecting pipe 17 to the first recycling box 10, the second recycling box 11 and the third recycling box 13, the recycling of dust reduction water can be achieved.

[0024] Furthermore, in this embodiment, a fourth filter plate 20 is connected to the bottom of the first recovery box 10 , a fifth filter plate 21 is connected to the bottom of the second recovery box 11 , and a sixth filter plate 22 is connected to the bottom of the third recovery box 13 .

[0025] In the technical solution adopted in this embodiment, by setting the fourth filter plate 20, the fifth filter plate 21 and the sixth filter plate 22, the water in the construction waste in the first recycling box 10, the second recycling box 11 and the third recycling box 13 can be filtered out, thereby ensuring that the recycled dust reduction water does not contain construction waste and ensuring the dust reduction quality of the dust reduction water.

[0026] Furthermore, in the present embodiment, a weight sensor 23 is connected to the bottom of the third recycling box 13 , an indicator light 24 is connected to one side of the third recycling box 13 , and the weight sensor 23 is electrically connected to the indicator light 24 .

[0027] In the technical solution adopted in this embodiment, a weight sensor 23 is provided to detect the weight of the construction waste recycled in the third recycling box 13. When it is detected that the weight of the construction waste reaches the set weight, a signal is sent to light up the indicator light 24, reminding the staff to clean up the construction waste in the third recycling box 13 in time.

[0028] The working process of the utility model is as follows: construction waste is put into the crushing device 5 of the first cavity 3, and the construction waste is crushed for the first time by the crushing device 5. The crushed construction waste falls on the first filter plate 6. The construction waste that meets the crushing standard passes through the first filter plate 6 and falls on the third filter plate 9. The construction waste that does not meet the crushing standard enters the second cavity 4 under the guidance of the first filter plate 6 and enters the crushing device 5 for secondary crushing. The construction waste after the secondary crushing falls on the second filter plate 8. The construction waste that meets the crushing standard passes through the second filter plate 8 and falls on the surface of the third filter plate 9. The construction waste that does not meet the crushing standard The construction waste enters the third recycling box 13 under the guidance of the second filter plate 8. The construction waste that meets the crushing standard can be further screened through the third filter plate 9. The construction waste with larger particles enters the second recycling box 11 through the guide plate 12 under the guidance of the third filter plate 9, and the construction waste with smaller particles passes through the third filter plate 9 and enters the first recycling box 10. It should be noted that during the crushing process, the nozzle 19 continuously sprays water to the crushing device 5 to reduce dust. After the dust reduction water falls, it returns to the nozzle 19 through the connecting pipe 17 and the water pipe 18 under the action of the water pump to continue dust reduction, thereby realizing the recycling of the dust reduction water.

[0029] The utility model can perform secondary crushing of construction waste by setting a first cavity 3 and a second cavity 4, and respectively setting a crushing device 5 in the first cavity 3 and the second cavity 4, thereby ensuring the crushing effect of the construction waste; by setting a third filter plate 9 to screen the crushed construction waste, the time required for subsequent screening of the construction waste is saved, and the processing efficiency of the construction waste is accelerated; the dust reduction component is set to play a dust reduction role on the one hand, reducing the impact of the crushing work on the environment, and on the other hand, the crushing device 5 can be cooled to ensure the safety of the crushing work.

[0030] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0031] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A construction waste crushing device, which is provided with a body, characterized in that: A partition is provided in the machine body, and the machine body is divided into a first cavity and a second cavity by the partition, and a crushing device is provided in both the first cavity and the second cavity, and a first filter plate is connected to the first cavity below the crushing device, and the height of the first filter plate is higher than the height of the crushing device in the second cavity, and a connecting port is provided at a position corresponding to the second filter plate and the partition, and a second filter plate is connected to the second cavity below the crushing device, and a third filter plate is connected to the first filter plate and the second filter plate in the machine body below, and a first recovery box is provided below the third filter plate, and a second recovery box is provided on one side of the machine body, and the machine body is connected to the second recovery box through a guide plate, and a third recovery box is connected to the other side of the machine body at a position corresponding to the second filter plate, and a dust reduction component is also provided in the first cavity and the second cavity.

2. The construction waste crushing device according to claim 1, characterized in that: The crushing device comprises two motors, the output ends of the two motors are respectively connected to two rotating shafts, and the two rotating shafts are both connected to crushing blocks.

3. The construction waste crushing device according to claim 1, characterized in that: The first recycling box, the second recycling box and the third recycling box are all connected to the dust reduction component through a connecting pipe. The dust reduction component includes a water pipe, which is connected to the connecting pipe. A plurality of nozzles are connected to the water pipe, and the positions of the plurality of nozzles correspond to the positions of the crushing device.

4. The construction waste crushing device according to claim 1, characterized in that: The bottom of the first recovery box is connected to a fourth filter plate, the bottom of the second recovery box is connected to a fifth filter plate, and the bottom of the third recovery box is connected to a sixth filter plate.

5. The construction waste crushing device according to claim 1, characterized in that: A weight sensor is also connected to the bottom of the third recycling box, an indicator light is connected to one side of the third recycling box, and the weight sensor is electrically connected to the indicator light.

Citation Information

Cited By

  • Metal pipe welding device