On-site 66kV boosting transformer substation of wind generating set

By setting up prefabricated cabins outside the wind turbine, integrating GIS distribution device and low-voltage distribution device, and setting up a 66kV in-site boost transformer outside, the problem of high construction cost of boost substation of the wind turbine is solved, and the installation and Debugging extends maintenance cycles and reduces maintenance costs.

CN222072579UActive Publication Date: 2024-11-26湖南三一智慧新能源设计有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420523130.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-26
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

The construction cost of existing wind turbine boost substations is relatively high, mainly due to the difficulty of installation and commissioning and the complex maintenance.

Method used

Design a local 66kV boost substation for wind turbines, adopts a prefabricated cabin integrated 66kV GIS distribution device and low-voltage distribution device, and sets a 66kV on-site boost transformer outside, so as to reduce installation difficulty through the integrated design of prefabricated cabins and debug complexity, leverage GIS equipment to improve integration and reduce maintenance workload.

Benefits of technology

It has achieved the reduction of the construction cost of the on-site 66kV boost substation of the wind turbine, simplified the installation and commissioning process, extended the equipment maintenance cycle, and reduced maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222072579U_ABST
    Figure CN222072579U_ABST
Patent Text Reader

Abstract

The utility model provides an on-site 66kV boost transformer station for a wind generating set, which relates to the technical field of wind power generation and comprises a prefabricated cabin arranged outside the wind generating set; the 66kV GIS power distribution device is integrated in the prefabricated cabin body, and the 66kV GIS power distribution device is connected with the wind power plant collection booster station; the low-voltage power distribution device is integrated in the prefabricated cabin body, the low-voltage power distribution device is in communication connection with the wind power plant collection booster station, and the low-voltage power distribution device is connected with the wind generating set; and the 66kV in-situ boosting transformer is arranged outside the prefabricated cabin body, the high-voltage side of the 66kV in-situ boosting transformer is connected with the 66kV GIS power distribution device, and the low-voltage side of the 66kV in-situ boosting transformer is connected with the low-voltage power distribution device. According to the utility model, the construction cost of the boost substation can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wind power generation, in particular to an on-site 66kV step-up transformer substation for a wind power generator set. Background Art

[0002] In the field of wind power generation, traditional on-site voltage boosting systems for wind turbines are generally based on prefabricated substations with box-type transformers as the main body. However, as the capacity of wind turbines gradually increases, the outlet voltage of wind turbines transitions from 10kV and 35kV to 66kV or even higher voltage levels.

[0003] However, the existing higher voltage level step-up substations are difficult to install and debug in the early stages, as well as difficult to operate and maintain in the later stages, which results in high construction costs for step-up substations. Utility Model Content

[0004] The utility model provides an on-site 66kV boosting transformer substation for a wind turbine generator set, which is used to solve the defect of high construction cost of the boosting transformer substation in the prior art.

[0005] The utility model provides a 66kV on-site step-up substation for a wind turbine generator set, comprising:

[0006] A prefabricated cabin, wherein the prefabricated cabin is arranged outside the wind turbine generator set;

[0007] 66kV gas insulated switchgear GIS power distribution device, the 66kV GIS power distribution device is integrated in the prefabricated cabin, and the 66kV GIS power distribution device is connected to the wind farm collection and boosting station;

[0008] A low-voltage power distribution device, which is integrated in the prefabricated cabin, is communicatively connected to the wind farm collection and boosting station, and is connected to a wind turbine generator set;

[0009] A 66kV local step-up transformer is arranged outside the prefabricated cabin, and the high-voltage side of the 66kV local step-up transformer is connected to the 66kV GIS power distribution device, and the low-voltage side of the 66kV local step-up transformer is connected to the low-voltage power distribution device.

[0010] According to the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, at least two optical fiber switches and protection and measurement and control devices are also arranged in the prefabricated cabin, wherein:

[0011] The at least two optical fiber switches are arranged in the prefabricated cabin, and the at least two optical fiber switches are connected to the wind farm collection and boosting station;

[0012] The protection, measurement and control device is arranged in the prefabricated cabin, and the protection, measurement and control device is connected to the corresponding optical fiber switch of the at least two optical fiber switches, the 66kV GIS power distribution device and the low-voltage power distribution device.

[0013] According to the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, the 66kV GIS power distribution device includes: a lightning arrester, a live display, an isolating switch, a circuit breaker, a grounding switch and a first current transformer, wherein:

[0014] One end of the arrester, one end of the live display and one end of the disconnector are all connected to the wind farm collection and boosting station through a 66kV cable or an overhead line;

[0015] The other end of the isolating switch is connected to one end of the circuit breaker, and the other end of the circuit breaker is connected to one end of the grounding switch and one end of the first current transformer;

[0016] The other end of the first current transformer is connected to the high voltage side of the 66kV local step-up transformer and the protection and measurement control device;

[0017] The other end of the lightning arrester, the other end of the charged display and the other end of the grounding switch are all grounded.

[0018] According to the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, the low-voltage power distribution device further comprises: a second current transformer, a low-voltage circuit breaker, a fuse, a surge protector, a low-voltage knife-dissolved switch, a lighting maintenance transformer, a lighting maintenance busbar and an air switch, wherein:

[0019] One end of the second current transformer is connected to the low-voltage side of the 66kV on-site step-up transformer and the protection and measurement and control device, and the other end of the second current transformer is respectively connected to one end of the low-voltage circuit breaker, one end of the fuse and one end of the low-voltage knife-dissolved switch. The other end of the low-voltage circuit breaker is connected to the fan converter cabinet, the other end of the fuse is connected to one end of the surge protector, and the other end of the low-voltage knife-dissolved switch is connected to the lighting maintenance transformer. The lighting maintenance transformer and the air switch are both connected to the lighting maintenance busbar, and the other end of the surge protector is grounded.

[0020] According to the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, the 66kV on-site step-up transformer is arranged on a foundation, the foundation is arranged in an oil pit, and the 66kV on-site step-up transformer adopts a three-phase double-winding no-load oil-immersed transformer.

[0021] According to the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, the low-voltage power distribution device is also connected with the wind turbine based on the low-voltage cable and the communication optical cable.

[0022] According to the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, the prefabricated cabin also includes an uninterruptible AC power supply subsystem, and the uninterruptible AC power supply subsystem is connected to the low-voltage power distribution device.

[0023] According to the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, the prefabricated cabin also includes an AC power distribution subsystem and a DC power supply subsystem, wherein:

[0024] The AC power distribution subsystems are all connected to the protection and measurement control device and the 66kV GIS power distribution device;

[0025] The DC power supply subsystems are connected to the protection and measurement control device and the 66kV GIS power distribution device.

[0026] According to the on-site 66kV step-up substation for wind turbines provided by the utility model, the prefabricated cabin also includes a video monitoring system, a fire alarm system, an SF6 gas leakage monitoring system, an SF6 gas micro-water monitoring system and a pressure online monitoring system, and the video monitoring system, the fire alarm system, the SF6 gas leakage monitoring system, the SF6 gas micro-water monitoring system and the pressure online monitoring system are respectively connected to the corresponding optical fiber switches of the at least two optical fiber switches.

[0027] The on-site 66kV step-up substation for wind turbine generator set provided by the utility model also includes a microcomputer five-protection system, which is arranged in the prefabricated cabin and connects the prefabricated cabin and the low-voltage power distribution device.

[0028] The utility model provides a 66kV on-site step-up substation for a wind turbine generator set. A prefabricated cabin of the 66kV on-site step-up substation for a wind turbine generator set is arranged outside the wind turbine generator set, a 66kV GIS power distribution device and a low-voltage power distribution device are integrated in the prefabricated cabin, and a 66kV on-site step-up transformer is arranged outside the prefabricated cabin. The high-voltage side of the 66kV on-site step-up transformer is connected to the 66kV GIS power distribution device, and the low-voltage side of the 66kV on-site step-up transformer is connected to the low-voltage power distribution device, so that electric energy can be smoothly transmitted between different voltage levels. At the same time, the integrated design of the prefabricated cabin can greatly reduce the difficulty of installation and debugging in the early stage. At the same time, the 66kV GIS power distribution device adopts GIS equipment, which improves the equipment integration and avoids later maintenance, thereby reducing the construction cost of the entire 66kV on-site step-up substation for the wind turbine generator set. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions in the present invention or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0030] Figure 1 This is one of the connection diagrams of the on-site 66kV step-up substation for the wind turbine generator set provided by the utility model;

[0031] Figure 2 This is the second connection diagram of the on-site 66kV step-up substation of the wind turbine generator set provided by the utility model;

[0032] Figure 3 This is the third connection diagram of the on-site 66kV step-up substation of the wind turbine generator set provided by the utility model;

[0033] Figure 4 This is the fourth connection diagram of the on-site 66kV step-up substation of the wind turbine generator set provided by the utility model;

[0034] Figure 5 This is the fifth connection diagram of the on-site 66kV step-up substation of the wind turbine generator set provided by the utility model;

[0035] Figure 6 This is the sixth connection diagram of the on-site 66kV step-up substation of the wind turbine generator set provided by the utility model.

[0036] Reference numerals:

[0037] 100: Wind turbine generator set; 200: Wind farm collection and booster station; 300: Prefabricated cabin; 310: 66kV GIS power distribution device; 311: Lightning arrester; 312: Live display; 313: Disconnector; 314: Circuit breaker; 315: Earthing switch; 316: First current transformer; 320: Low voltage power distribution device; 321: Second current transformer; 322: Low voltage circuit breaker; 323: Fuse; 324: Surge protector; 325: Low voltage knife fuse switch; 326: Lighting maintenance transformer; 327: Lighting maintenance busbar; 328: Air switch; 330: 6 6kV local step-up transformer; 340: protection and measurement and control device; 350: fiber optic switch; 360: uninterruptible AC power supply subsystem; 370: AC distribution subsystem; 380: DC power supply subsystem; 390: microcomputer five-protection system; 391: video monitoring system; 392: fire alarm system; 393: SF6 gas leakage detection system; 394: SF6 gas micro-water monitoring system; 395: pressure online monitoring system; 400: foundation; 500: oil pit. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described clearly and completely in conjunction with the drawings in the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0039] In view of the problem of high construction cost of booster substation in the prior art, the embodiment of the utility model provides a 66kV booster substation on-site for a wind turbine generator set. Figure 1 This is one of the connection diagrams of the on-site 66kV step-up substation for the wind turbine generator set provided by the utility model, such as Figure 1 As shown, the booster substation includes:

[0040] A prefabricated cabin 300, wherein the prefabricated cabin 300 is arranged outside the wind turbine generator set 100;

[0041] 66kV GIS (Gas Insulated Switchgear) power distribution device, the 66kV GIS power distribution device 310 is integrated in the prefabricated cabin 300, and the 66kV GIS power distribution device 310 is connected to the wind farm collection booster station 200;

[0042] A low-voltage power distribution device 320, which is integrated in the prefabricated cabin 300, is communicatively connected to the wind farm collection and boosting station 200, and is connected to the wind turbine generator set 100;

[0043] A 66kV local step-up transformer 330 is arranged outside the prefabricated cabin 300 , and the high-voltage side of the 66kV local step-up transformer 330 is connected to the 66kV GIS power distribution device 310 , and the low-voltage side of the 66kV local step-up transformer 330 is connected to the low-voltage power distribution device 320 .

[0044] Specifically, when constructing the booster substation, the 66kV GIS power distribution device 310 and the low-voltage power distribution device 320 are both designed as prefabricated cabins, that is, the 66kV GIS power distribution device 310 and the low-voltage power distribution device 320 are integrated in the prefabricated cabin 300 set outside the wind turbine generator set 100, wherein the 66kV GIS power distribution device 310 is connected to the wind farm collection booster station 200 through a cable on the one hand, so as to transmit the electric energy boosted to 66kV to the wind farm collection booster station 200. On the other hand, the 66kV GIS power distribution device 310 is connected to the wind farm collection booster station 200 in communication, and is used to upload the electric signal of the operating status corresponding to the 66kV GIS power distribution device 310 to the wind farm collection booster station 200 or receive the distribution control signal transmitted by the wind farm collection booster station 200, so as to realize the remote monitoring and control of the 66kV GIS power distribution device 310 and ensure the safe and stable operation of the power system. On the one hand, the low-voltage distribution device 320 is communicatively connected with the wind farm collection and boosting station 200, and is used to upload the electrical signal of the operating status corresponding to the low-voltage distribution status to the wind farm collection and boosting station 200 or receive the distribution control signal transmitted by the wind farm collection and boosting station 200, so as to realize remote monitoring and control of the low-voltage distribution device 320. On the other hand, the low-voltage distribution device 320 is connected to the wind turbine 100 through a cable, obtains the low-voltage level of electric energy generated by the wind turbine 100, and transmits the low-voltage level of electric energy to the low-voltage side of the 66kV on-site boosting transformer 330 for boosting. In addition, a 66kV local step-up transformer 330 is also arranged outside the prefabricated cabin 300. The high-voltage side of the 66kV local step-up transformer 330 is connected to the 66kV GIS distribution device 310, and the low-voltage side of the 66kV local step-up transformer 330 is connected to the low-voltage distribution device 320. After receiving the low-voltage level electric energy, the 66kV local step-up transformer 330 steps up the voltage to obtain 66kV electric energy, and then transmits the 66kV high-voltage electric energy to the 66kV GIS distribution device 310 through the high-voltage side. After receiving the 66kV high-voltage electric energy, the 66kV GIS distribution device 310 distributes the 66kV high-voltage electric energy, or transmits the 66kV high-voltage electric energy to the wind farm collection step-up station 200 through cables.

[0045] It should be noted that the wind turbine generator set 100 is a device for converting wind energy into mechanical energy and mechanical energy into electrical energy. At least one wind turbine generator set 100 is connected to the low-voltage power distribution device 320 through a cable. Since the electrical energy generated by the wind turbine generator set 100 is usually low-voltage electrical energy, and the power grid transmission requires high-voltage electrical energy, after each wind turbine generator set 100 generates low-voltage electrical energy, the low-voltage power distribution device 320 is used to collect the low-voltage electrical energy of each wind turbine generator set 100, and transmit the collected electrical energy to the 66kV on-site step-up transformer 330. The 66kV on-site step-up transformer 330 boosts the electrical energy of the lower voltage level to 66kV, so as to transmit the 66kV electrical energy to the 66kV GIS power distribution device 310 through the high-voltage side, which is convenient for subsequent power distribution, or the 66kV electrical energy is transmitted over a long distance through a cable to the wind farm collection step-up station 200.

[0046] Optionally, the high-voltage side of the above-mentioned 66kV local step-up transformer 330 can be connected to the 66kV GIS distribution device 310 bushing by steel-core aluminum stranded wire. Steel-core aluminum stranded wire is a conductor made of aluminum wire twisted around a steel core, which has high conductivity and mechanical strength. Compared with pure copper wire or pure aluminum wire, steel-core aluminum stranded wire can reduce construction costs while maintaining sufficient conductivity. At the same time, the good corrosion resistance of steel-core aluminum stranded wire can make the overhead line meet the requirements of adapting to different terrains and climatic conditions. Secondly, the low-voltage side of the 66kV local step-up transformer 330 can be connected to the low-voltage distribution device 320 by cable. A cable is a combination of wires composed of at least one insulated wire and wrapped in a protective sheath. The cable is usually buried underground or installed in a closed environment such as a cable trench or cable bridge. It is relatively safe and easy to maintain, reducing the maintenance workload and maintenance costs.

[0047] Optionally, the prefabricated cabin 300 integrates a 66kV GIS power distribution device 310 and a low-voltage power distribution device 320. The prefabricated cabin 300 occupies a small area and has a small space volume. The entire prefabricated cabin 300 can be transported to the installation destination by road, reducing transportation costs. At the same time, due to the small space volume, the entire prefabricated cabin 300 meets the lifting conditions during installation, that is, the entire prefabricated cabin 300 can be lifted by a crane to the installation destination for installation, thereby improving the convenience of on-site construction and installation and reducing installation costs.

[0048] Furthermore, Figure 2 This is the second connection diagram of the on-site 66kV step-up substation for the wind turbine generator set provided by the utility model, such as Figure 2 As shown, the 66 kV local step-up transformer 330 is arranged on a foundation 400, the foundation 400 is arranged in an oil pit 500, and the 66 kV local step-up transformer 330 adopts a three-phase double-winding no-load oil-immersed transformer.

[0049] Specifically, the 66kV local step-up transformer 330 adopts a three-phase double-winding no-load oil-immersed transformer, and the 66kV local step-up transformer 330 is arranged outside the prefabricated cabin 300, and an oil retaining facility is arranged around the 66kV local step-up transformer 330, the oil retaining facility includes a foundation 400 and an oil pit 500, the foundation 400 is arranged in the oil pit 500, the bottom height of the oil pit 500 is lower than the ground height, and the 66kV local step-up transformer 330 is arranged on the foundation 400 to prevent the oil leakage of the 66kV local step-up transformer 330 from spreading to the surrounding environment and the prefabricated cabin 300 when the 66kV local step-up transformer 330 fails, thereby avoiding fire accidents and damage to the prefabricated cabin 300. After the 66kV local step-up transformer 330 fails, the oil pit 500 can collect the leaked transformer oil for subsequent cleaning and disposal. At the same time, the oil retaining facility also provides a safe space for operating and maintaining the 66kV local step-up transformer 330, which is convenient for maintenance personnel to conduct troubleshooting and maintenance.

[0050] Furthermore, Figure 3 This is the third connection diagram of the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, such as Figure 3 As shown, at least two optical fiber switches 350 and a protection and measurement control device 340 are also arranged in the prefabricated cabin 300, wherein:

[0051] The at least two optical fiber switches 350 are arranged in the prefabricated cabin 300, and the at least two optical fiber switches 350 are connected to the wind farm collection and boosting station 200;

[0052] The protection, measurement and control device 340 is disposed in the prefabricated cabin 300 , and the protection, measurement and control device 340 is connected to a corresponding optical fiber switch 350 among the at least two optical fiber switches 350 , the 66kV GIS power distribution device 310 and the low-voltage power distribution device 320 .

[0053] Specifically, at least two optical fiber switches 350 and a protection and measurement control device 340 are also arranged in the prefabricated cabin 300. All two optical fiber switches 350 are connected to the wind farm collection booster station 200 for data exchange with the wind farm collection booster station 200. The protection and measurement control device 340 is arranged in the prefabricated cabin 300, and the protection and measurement control device 340 is connected to the 66kV GIS power distribution device 310, the low voltage power distribution device 320 and the corresponding optical fiber switch 350. On the one hand, the 66kV GIS power distribution device 310 and the low voltage power distribution device 320 collect their respective corresponding electrical signals for characterizing the operating status during operation, and transmit the electrical signals to the protection and measurement control device 340. After receiving the electrical signals, the protection and measurement control device 340 can upload the electrical signals to the background management end of the wind farm collection booster station 200 through the corresponding optical fiber switch 350, and remotely monitor the 66kV GIS power distribution device 310 and the low voltage power distribution device 320 according to the electrical signals. On the other hand, if the wind farm collection booster station 200 generates a power distribution control signal, the power distribution control signal can be sent to the protection and measurement and control device 340 through the corresponding optical fiber switch 350, and then the protection and measurement and control device 340 transmits or executes the power distribution control instruction. Through the data transmission between the protection and measurement and control device 340 and the wind farm collection booster station 200, the remote monitoring of the on-site 66kV booster substation of the wind turbine generator set 100 is realized, reducing the monitoring cost. In addition, the protection and measurement and control device 340 can also configure three-stage overcurrent protection and two-stage zero-sequence protection for the 66kV GIS distribution device 310 and the low-voltage distribution device 320 to ensure the safe and stable operation of the 66kV GIS distribution device 310 and the low-voltage distribution device 320.

[0054] Optionally, the above-mentioned 66kV GIS distribution device 310 adopts GIS equipment, and all components in the GIS equipment are encapsulated in a metal casing and filled with SF6 gas as an insulating medium. Therefore, the sealing performance of each component is improved, ensuring the safe and stable operation of the 66kV GIS distribution device 310, and the compact structural design in the GIS equipment ensures that the volume of the 66kV GIS distribution device 310 is greatly reduced, and the volume of the prefabricated cabin 300 is further reduced. At the same time, the oil-free and gas-free design of the operating mechanism in the GIS equipment, as well as the excellent arc extinguishing and insulation performance, greatly reduce the maintenance workload of the 66kV GIS distribution device 310, extend the maintenance cycle, and thereby reduce the maintenance cost.

[0055] Furthermore, Figure 4 This is the fourth connection diagram of the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, such as Figure 4As shown, the 66kV GIS power distribution device 310 includes: a lightning arrester 311, a live display 312, an isolating switch 313, a circuit breaker 314, a grounding switch 315 and a first current transformer 316, wherein:

[0056] One end of the lightning arrester 311, one end of the live display 312 and one end of the disconnector 313 are all connected to the wind farm collection booster station 200 through a 66kV cable or an overhead line;

[0057] The other end of the isolating switch 313 is connected to one end of the circuit breaker 314, and the other end of the circuit breaker 314 is connected to one end of the grounding switch 315 and one end of the first current transformer 316;

[0058] The other end of the first current transformer 316 is connected to the high voltage side of the 66kV local step-up transformer 330 and the protection and measurement control device 340;

[0059] The other end of the lightning arrester 311 , the other end of the charged indicator 312 , and the other end of the grounding switch 315 are all grounded.

[0060] Specifically, the lightning arrester 311 is used to limit the overvoltage when lightning overvoltage or operating overvoltage invades along the line, and to protect the 66kV GIS distribution device 310 from overvoltage. The live display 312 is used to indicate whether the 66kV GIS distribution device 310 or the line is live, so as to avoid electric shock accidents when maintenance personnel conduct inspections or maintenance. The isolating switch 313 can separate and close the circuit when there is no current; the circuit breaker 314 is used to quickly cut off the circuit when a fault occurs, limit the fault capacity, and protect other equipment from damage; the grounding switch 315 is used to ground the line to release residual charge, prevent electric shock accidents, and ensure the safety of equipment and maintenance personnel; the first current transformer 316 is used to convert the measured high current into a low current in proportion, generate a corresponding electrical signal, and transmit the electrical signal to the protection and measurement control device 340, which transmits the electrical signal to the wind farm collection and boosting station 200.

[0061] Further, such as Figure 4 As shown, the low-voltage power distribution device 320 also includes: a second current transformer 321, a low-voltage circuit breaker 322, a fuse 323, a surge protector 324, a low-voltage knife-dissolved switch 325, a lighting maintenance transformer 326, a lighting maintenance bus 327 and an air switch 328, wherein:

[0062] One end of the second current transformer 321 is connected to the low-voltage side of the 66kV on-site step-up transformer 330 and the protection and measurement and control device 340, and the other end of the second current transformer 321 is respectively connected to one end of the low-voltage circuit breaker 322, one end of the fuse 323 and one end of the low-voltage knife-dissolved switch 325. The other end of the low-voltage circuit breaker 322 is connected to the fan converter cabinet, the other end of the fuse 323 is connected to one end of the surge protector 324, and the other end of the low-voltage knife-dissolved switch 325 is connected to the lighting maintenance transformer 326. The lighting maintenance transformer 326 and the air switch 328 are both connected to the lighting maintenance bus 327, and the other end of the surge protector 324 is grounded.

[0063] Specifically, the second current transformer 321 is used to measure the electrical signal corresponding to the operating state of the low-voltage distribution device 320, and transmit the electrical signal to the protection and measurement and control device 340, which transmits the electrical signal to the wind farm collection and boosting station 200; the low-voltage circuit breaker 322 is used to automatically cut off the circuit between the low-voltage distribution device 320 and the wind turbine converter cabinet when a short circuit, overload or undervoltage occurs in the line, so as to protect the wind turbine converter cabinet and other equipment connected to the low-voltage distribution device 320 from damage; the fuse 32 3 and surge protector 324 are used to protect the low-voltage distribution device 320 from instantaneous overvoltages such as lightning and operating overvoltage; the low-voltage knife-type fuse 325 is an electrical appliance with the dual functions of a switch and a fuse 323, which can be used as an isolating switch 313 and can cut off the circuit when a short circuit or overload occurs in the circuit to protect other components in the low-voltage distribution device 320 from damage; the lighting maintenance transformer 326, the lighting maintenance bus 327 and the air switch 328 are used together to provide the low-voltage power supply required for maintenance or local lighting.

[0064] Optionally, the lighting maintenance transformer 326 may be a dry-type station transformer for providing station AC power to the on-site 66 kV step-up substation of the wind turbine generator set 100 .

[0065] Furthermore, the low-voltage power distribution device 320 is also connected to the wind turbine based on a low-voltage cable and a communication optical cable.

[0066] Specifically, the low-voltage power distribution device 320 is designed to be integrated. After the prefabricated cabin 300 is hoisted to the installation destination, the low-voltage power distribution device 320 and the wind turbine can be connected only by low-voltage cables and communication optical cables, which greatly shortens the installation time and thus reduces the installation cost.

[0067] Furthermore, Figure 5 This is the fifth connection diagram of the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, such as Figure 5As shown, the prefabricated cabin 300 also includes an uninterruptible power supply (UPS) subsystem, and the uninterruptible power supply subsystem 360 is connected to the low-voltage power distribution device 320.

[0068] Specifically, after the uninterruptible AC power supply subsystem 360 is connected to the low-voltage power distribution device 320, it can provide additional power supply protection and stability for the low-voltage power distribution device 320. That is, under normal power supply conditions, the uninterruptible AC power supply subsystem 360 can obtain electrical energy from the low-voltage power distribution device 320. In the event of a power outage or abnormality, the uninterruptible AC power supply subsystem 360 can supply power to the low-voltage power distribution device 320 to avoid damage or data loss caused by sudden power outage of the low-voltage power distribution device 320.

[0069] Further, such as Figure 5 As shown, the prefabricated cabin 300 also includes an AC power distribution subsystem 370 and a DC power supply subsystem 380, wherein:

[0070] The AC power distribution subsystem 370 is connected to the protection and measurement control device 340 and the 66kV GIS power distribution device 310;

[0071] The DC power supply subsystem 380 is connected to the protection and measurement control device 340 and the 66kV GIS power distribution device 310 .

[0072] Specifically, the AC power distribution subsystem 370 and the DC power supply subsystem 380 are both connected to the protection and measurement control device 340 and the 66kV GIS power distribution device 310 , and supply power to the 66kV GIS power distribution device 310 to ensure the normal operation of the 66kV GIS power distribution device 310 .

[0073] Furthermore, Figure 6 This is the sixth connection diagram of the on-site 66kV step-up substation for wind turbine generator set provided by the utility model, such as Figure 6 As shown, the prefabricated cabin 300 also includes a video monitoring system 391, a fire alarm system 392, an SF6 gas leakage monitoring system, an SF6 gas micro-water monitoring system 394 and a pressure online monitoring system 395, and the video monitoring system 391, the fire alarm system 392, the SF6 gas leakage monitoring system, the SF6 gas micro-water monitoring system 394 and the pressure online monitoring system 395 are respectively connected to the corresponding fiber optic switches 350 among the at least two fiber optic switches 350.

[0074] Specifically, a video surveillance system 391 is provided in the prefabricated cabin 300, and the video surveillance system 391 can be connected to the corresponding fiber optic switch 350. The video surveillance system 391 may include at least two video surveillance cameras, and the monitoring range of at least two video surveillance cameras can cover the entire prefabricated cabin 300. Through at least two video surveillance cameras, video data in the prefabricated cabin 300 can be collected, and the video data can be transmitted to the wind farm aggregation booster station 200 in real time through the fiber optic switch 350, ensuring that the operation and maintenance personnel in the wind farm aggregation booster station 200 can remotely monitor the situation in the prefabricated cabin 300 and discover abnormalities in time. A fire alarm system 392, an SF6 gas leakage monitoring system, an SF6 gas micro-water monitoring system 394 and an online pressure monitoring system 395 are also provided in the prefabricated cabin 300, and the fire alarm system 392, the SF6 gas leakage monitoring system, the SF6 gas micro-water monitoring system 394 and the online pressure monitoring system 395 are respectively connected to the corresponding optical fiber switches 350, wherein the fire alarm system 392 can collect the concentration of combustible gas in the prefabricated cabin 300, and then determine whether the concentration of the combustible gas exceeds the standard. If it exceeds the standard, a fire alarm signal is generated, and the fire alarm signal together with the concentration of the combustible gas is uploaded to the wind farm aggregation booster station 200 through the corresponding optical fiber switch 350 for remote fire monitoring. The SF6 gas leakage monitoring system is used to collect the concentration of SF6 gas in the prefabricated cabin 300. If the concentration of SF6 gas is abnormal, the fan in the prefabricated cabin 300 will be automatically linked to exhaust, and an alarm signal will be generated. Together with the collected SF6 gas concentration, it will be uploaded to the wind farm collection and booster station 200 in real time through the corresponding optical fiber switch 350. The SF6 gas micro-water monitoring system 394 is used to collect the micro-water data of each air chamber in the 66kV GIS distribution device 310, and upload the micro-water data to the wind farm collection and booster station 200 in real time. The pressure online monitoring system 395 is used to collect the air pressure data of each air chamber in the 66kV GIS distribution device 310, and upload the air pressure data to the wind farm collection and booster station 200 in real time.

[0075] Optionally, the video surveillance camera may be a ball camera or an IP Camera (IP Camera, IPC), which is not limited in the embodiment of the present utility model.

[0076] Furthermore, it also includes a microcomputer five-protection system 390, which is arranged in the prefabricated cabin 300 and connects the prefabricated cabin 300 and the low-voltage power distribution device 320.

[0077] Specifically, a microcomputer five-protection system 390 can also be configured in the prefabricated cabin 300. The microcomputer five-protection system 390 can be connected to the cabin doors corresponding to the prefabricated cabin 300 and the low-voltage power distribution device 320 to determine whether the cabin door is energized. When the cabin door is energized, the corresponding electrical operations of the operation and maintenance personnel are prohibited, or when the electrical operations of the operation and maintenance personnel do not meet the preset safety operation logic, the operation and maintenance personnel are prohibited from performing erroneous operations.

[0078] The utility model embodiment provides a 66kV on-site step-up substation for a wind turbine generator set. A prefabricated cabin of the 66kV on-site step-up substation for a wind turbine generator set is arranged outside the wind turbine generator set, a 66kV GIS power distribution device and a low-voltage power distribution device are integrated in the prefabricated cabin, and a 66kV on-site step-up transformer is arranged outside the prefabricated cabin. The high-voltage side of the 66kV on-site step-up transformer is connected to the 66kV GIS power distribution device, and the low-voltage side of the 66kV on-site step-up transformer is connected to the low-voltage power distribution device, so that electric energy can be smoothly transmitted between different voltage levels. At the same time, the integrated design of the prefabricated cabin can greatly reduce the difficulty of early installation and debugging. At the same time, the 66kV GIS power distribution device adopts GIS equipment, which improves the equipment integration and avoids later maintenance, thereby reducing the construction cost of the entire 66kV on-site step-up substation for the wind turbine generator set.

[0079] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.

Claims

1. A 66kV on-site step-up substation for a wind turbine generator set, characterized in that: include: A prefabricated cabin, wherein the prefabricated cabin is arranged outside the wind turbine generator set; 66kV gas insulated switchgear GIS power distribution device, the 66kV GIS power distribution device is integrated in the prefabricated cabin, and the 66kV GIS power distribution device is connected to the wind farm collection and boosting station; A low-voltage power distribution device, which is integrated in the prefabricated cabin, is communicatively connected to the wind farm collection and boosting station, and is connected to a wind turbine generator set; A 66kV local step-up transformer is arranged outside the prefabricated cabin, and the high-voltage side of the 66kV local step-up transformer is connected to the 66kV GIS power distribution device, and the low-voltage side of the 66kV local step-up transformer is connected to the low-voltage power distribution device.

2. The on-site 66kV step-up substation for wind turbine generator set according to claim 1 is characterized in that: At least two optical fiber switches and protection and measurement control devices are also arranged in the prefabricated cabin, wherein: The at least two optical fiber switches are arranged in the prefabricated cabin, and the at least two optical fiber switches are connected to the wind farm collection and boosting station; The protection, measurement and control device is arranged in the prefabricated cabin, and the protection, measurement and control device is connected to the corresponding optical fiber switch of the at least two optical fiber switches, the 66kV GIS power distribution device and the low-voltage power distribution device.

3. The on-site 66kV step-up substation for wind turbine generator set according to claim 2 is characterized in that: The 66kVGIS power distribution device includes: a lightning arrester, a live display, an isolating switch, a circuit breaker, a grounding switch and a first current transformer, wherein: One end of the arrester, one end of the live display and one end of the disconnector are all connected to the wind farm collection and boosting station through a 66kV cable or an overhead line; The other end of the isolating switch is connected to one end of the circuit breaker, and the other end of the circuit breaker is connected to one end of the grounding switch and one end of the first current transformer; The other end of the first current transformer is connected to the high voltage side of the 66kV local step-up transformer and the protection and measurement control device; The other end of the lightning arrester, the other end of the charged display and the other end of the grounding switch are all grounded.

4. The on-site 66kV step-up substation for wind turbine generator set according to claim 2 is characterized in that: The low-voltage power distribution device further includes: a second current transformer, a low-voltage circuit breaker, a fuse, a surge protector, a low-voltage knife-disconnector, a lighting maintenance transformer, a lighting maintenance busbar and an air switch, wherein: One end of the second current transformer is connected to the low-voltage side of the 66kV on-site step-up transformer and the protection and measurement and control device, and the other end of the second current transformer is respectively connected to one end of the low-voltage circuit breaker, one end of the fuse and one end of the low-voltage knife-dissolved switch. The other end of the low-voltage circuit breaker is connected to the fan converter cabinet, the other end of the fuse is connected to one end of the surge protector, and the other end of the low-voltage knife-dissolved switch is connected to the lighting maintenance transformer. The lighting maintenance transformer and the air switch are both connected to the lighting maintenance busbar, and the other end of the surge protector is grounded.

5. The on-site 66kV step-up substation for wind turbine generator set according to any one of claims 1 to 4, characterized in that: The 66kV local step-up transformer is arranged on a foundation, the foundation is arranged in an oil pit, and the 66kV local step-up transformer adopts a three-phase double-winding no-load oil-immersed transformer.

6. The on-site 66kV step-up substation for wind turbine generator set according to any one of claims 1 to 4, characterized in that: The low-voltage power distribution device is also connected to the fan based on a low-voltage cable and a communication optical cable.

7. The on-site 66kV step-up substation for wind turbine generator set according to any one of claims 1 to 4, characterized in that: The prefabricated cabin also includes an uninterruptible AC power supply subsystem, which is connected to the low-voltage power distribution device.

8. The on-site 66kV step-up substation for wind turbine generator set according to any one of claims 2 to 4, characterized in that: The prefabricated cabin also includes an AC power distribution subsystem and a DC power supply subsystem, wherein: The AC power distribution subsystems are all connected to the protection and measurement control device and the 66kV GIS power distribution device; The DC power supply subsystems are connected to the protection and measurement control device and the 66kV GIS power distribution device.

9. The on-site 66kV step-up substation for wind turbine generator set according to any one of claims 2 to 4, characterized in that: The prefabricated cabin also includes a video monitoring system, a fire alarm system, an SF6 gas leakage monitoring system, an SF6 gas micro-water monitoring system and a pressure online monitoring system. The video monitoring system, the fire alarm system, the SF6 gas leakage monitoring system, the SF6 gas micro-water monitoring system and the pressure online monitoring system are respectively connected to the corresponding optical fiber switches of the at least two optical fiber switches.

10. The on-site 66kV step-up substation for wind turbine generator set according to any one of claims 1 to 4, characterized in that: It also includes a microcomputer five-protection system, which is arranged in the prefabricated cabin and connects the prefabricated cabin and the low-voltage power distribution device.