A trolley anchor mechanism
By designing the trolley anchoring mechanism, the propulsion beam, rock drill and sliding guide rail are used to switch between anchoring and rock drilling operations, which solves the problems of frequent disassembly and assembly of equipment and potential safety hazards in the existing technology, and improves construction efficiency and safety.
Patent Information
- Application Number
- CN201811591276.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-12-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2038-12-25
AI Technical Summary
The existing hydraulic anchor trolley is only used for anchoring operations, and the hydraulic rock drilling rig is only used for rock drilling operations. The two cannot be interchanged and replaced, resulting in frequent disassembly and installation of equipment during the construction process, which is time-consuming and poses safety risks. There are hidden dangers, and it is difficult to lengthen drill pipes and anchor rods, which reduces work efficiency.
A trolley anchor mechanism is designed, including a push beam, a rock drill, an anchor bin, a caliper device, a grab rod device and a rod installation device. The switching between the anchor rod and the rock drill is realized through the sliding guide rail and telescopic mechanism, allowing the drill pipe or Multiple uses and length adjustments of anchors reduce equipment replacement time and improve work efficiency.
It realizes switching between anchoring and rock drilling operations, reduces equipment replacement time, reduces weight and occupied space, improves construction efficiency, and reduces safety hazards.
Smart Images

Figure CN109441444B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining and tunnel engineering machinery, in particular to a trolley anchor mechanism used for rock drilling and anchoring. Background Art
[0002] Anchor bolters, also known as soil nailers, anchor drills or pneumatic impact machines, are mainly used for rock and soil anchors, roadbed and slope management, underground deep foundation pit support, tunnel surrounding rock stability, landslide prevention and other disaster management, underground engineering support and high-rise building foundation treatment. It is also suitable for non-prestressed anchor support for deep foundation pit spraying and slope soil nailing projects. At present, rock drilling and anchor support construction in mines, tunnels, etc. are two different operating methods. The existing hydraulic anchor trolley is only used for anchor operations, and the hydraulic rock drilling trolley is only used for rock drilling operations. The two cannot be interchanged or replaced. When the tunnel boring machine has completed the cutting, the support operator needs to move the anchor drill to the bottom of the newly exposed empty top area, install the drill rod or anchor rod, and support the newly exposed top plate and two sides with anchor rods and anchor cables; after the support is completed, the anchor drill is moved to a safe place at the back. In this way, each cycle requires the dismantling and installation of equipment, which is repeated many times per shift, which is very troublesome and time-consuming; in addition, the operator needs to operate the support equipment to carry out support operations under the newly exposed empty top area, and there are often accidents where the top plate falls and the broken stones injure the construction workers, and the broken sides injure the support construction workers, which poses a great safety hazard. At present, the hydraulic anchor machine and the drill rod machine are heavy and large in size. If the two machines are integrated into a measuring trolley, there is a large load-bearing capacity of the mechanical arm and a large space required for operation. At the same time, it is difficult to lengthen the drill rod and anchor rod when the borehole and anchor rod are long. Frequent equipment changes during construction reduce work efficiency. Summary of the invention
[0003] In view of the above problems, the present invention provides a multifunctional anchor mechanism which can realize switching between rock drilling and anchoring.
[0004] In order to achieve the above purpose, the following technical scheme is adopted.
[0005] A trolley anchor mechanism comprises a propulsion beam and a rock drill, wherein an anchor magazine for storing drill rods or anchor rods is provided on one side of the propulsion beam, and a sliding guide rail is provided on the propulsion beam along the front-rear direction; a clamp device, a gripping rod device and a rod loading device are also provided on the propulsion beam, wherein the rod loading device transfers the drill rod or anchor rod in the anchor magazine to the clamp device, and the gripping rod device grabs the drill rod on the clamp device through a gripper; the rock drill is slidably connected to the sliding guide rail, and the rock drill comprises a first sliding base, a power device, a drill tail and a connecting sleeve, wherein the power device drives the drill tail to rotate, the drill tail is threadedly matched with one end of the connecting sleeve, and the other end of the connecting sleeve is threadedly matched with the drill rod or anchor rod; the clamp device limits the radial or axial movement of the drill rod or anchor rod by gripping, and comprises a drill clamp and a drill supporter arranged in sequence from front to back, the drill clamp can clamp the drill rod or anchor rod to fix it, the drill supporter is slidably connected to the sliding guide rail, and the drill supporter moves relative to the sliding guide rail through a first telescopic mechanism.
[0006] The drill rod includes a front end and a rear end, the front end is provided with a first external thread, the rear end is provided with a second external thread, the second external thread cooperates with the connecting sleeve, the rear end is axially provided with an inner hole, the inner hole is provided with an internal thread, and the drill rod is connected end to end with multiple identical units through the thread cooperation of the first external thread and the internal thread. During deep hole operation, the front end of the first drill rod is connected to the drill bit. After the first drill rod is drilled into the hole, the drill clamp clamps the rear end of the drill rod, the rock drill retreats, and the second drill rod is connected. Repeat this step to perform deep hole drilling. When withdrawing the drill rods, disassemble them one by one. The deep hole anchor rod is carried out according to the principle of this step. During construction, the second external thread is coated with lubricating oil or grease to facilitate the separation of the connecting sleeve from the rear end of the drill rod or anchor rod.
[0007] The anchor bar bin comprises a protective cover, a motor, a front rod storage tray and a rear rod storage tray, wherein a central axis is connected between the front rod storage tray and the rear rod storage tray, and grooves for accommodating drill rods or anchor rods are arranged on the circumference of the front rod storage tray and the rear rod storage tray, and the motor drives the front rod storage tray and the rear rod storage tray to swing. During the rotation of the motor, the rod loading device takes out the drill rods in the anchor bar bin one by one.
[0008] The rod grabbing device includes a first base, a first swing arm and a first gripper. The first base is fixed to the upper edge of the protective cover. The rod grabbing device grabs the drill rod on the clamp device through the first gripper. The rod mounting device includes a second base, a second swing arm and a second gripper. The second base is fixed to the propulsion beam and is located between the sliding guide rail and the anchor bar bin. The drill rod or anchor rod is transferred between the clamp device and the anchor bar bin through the second gripper. The swing trajectory of the second swing arm intersects with the drill rod or anchor rod in the anchor bar bin at the drill rod or anchor rod installation position on the clamp device. The second gripper grabs the drill rod or anchor rod to realize the action of grabbing and putting it down.
[0009] The drill clamp comprises a first clamp and a second clamp which are arranged opposite to each other, the first clamp and the second clamp are hinged on the propulsion beam, and the first clamp and the second clamp are opened and closed by the second telescopic mechanism. The drill clamp can play a supporting role when drilling or anchoring to prevent the drilling from deviating from the track; when the connecting sleeve is separated from the drill rod or anchor rod, the drill rod or anchor rod can be clamped to fix it.
[0010] The drill support device includes a second sliding base, a movable pulley, a V-shaped clamp and a traction rope. The bottom of the second sliding base cooperates with the sliding guide rail, the rear end of the second sliding base is fixedly connected to the first telescopic mechanism, the V-shaped clamp and the movable pulley are fixed on the second sliding base, one end of the traction rope is fixed to the rear end of the propulsion beam, and the other end passes around the movable pulley and is fixedly connected to the first sliding base of the rock drill. During drilling or bolting operations, the drill support device moves synchronously with the rock drill. The speed of the rock drill is twice that of the drill support device. When the drill support device moves to the front end of the sliding guide rail, the rock drill also moves to the front end of the sliding guide rail.
[0011] In order to make the pole grabbing process more stable, two pole grabbing devices are provided at the front and rear, and two pole mounting devices are provided at the front and rear.
[0012] The front rod storage plate and the rear rod storage plate are provided with a plurality of guide wheels in the circumferential direction, and the guide wheels are located at one side of the groove, which is conducive to smoothly taking out the drill rod and avoiding the wear of the drill rod.
[0013] The front end of the push beam is provided with a top plate extending forward, which is used to press against the working surface to prevent the drilling hole or the anchor rod from tilting.
[0014] The second telescopic mechanism and the first telescopic mechanism are both driven by hydraulic pressure.
[0015] The anchor mechanism of the trolley combines two operation modes: anchor operation and rock drilling operation. The rod loading device transfers the drill rod from the anchor rod bin to the clamp device, and the drill holder in the clamp device clamps the drill rod to fix it. The rock drill moves forward, and the rear end of the drill rod is inserted into the connecting sleeve at the front end of the rock drill. The drill tail rotates to complete the assembly of the drill rod. The first telescopic mechanism pushes the rock drill, and the rock drill drives the drill rod to perform rock drilling. After the rock drilling is completed, the rock drill moves back with the drill rod, and the drill holder clamps the drill rod, the drill tail reverses, and the drill rod is separated. The drill rod is grabbed by the rod grabbing device, and the rod loading device removes the anchor rod from the anchor rod bin, installs the anchor rod, and then performs the anchor operation. By loading the anchor rod in the anchor rod bin, the anchor operation of drilling first and then installing the anchor rod can be realized; by loading the drill rod in the anchor rod bin, the length of the drill rod can be continued to realize deep hole rock drilling. Switching between anchor and rock drilling operations can be realized on the basis of the sliding guide rail and the propulsion device, realizing the multifunctionality of the anchor trolley. The anchor mechanism reduces the weight of the whole machine and the occupied working space, saves the time of changing equipment and improves the working efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of an embodiment;
[0017] Figure 2 It is the structural diagram of the grab bar device and the anchor bar bin;
[0018] Figure 3 It is the structural diagram of the brazing device;
[0019] Figure 4 It is the installation drawing of the drill rod or anchor rod and the connecting sleeve. DETAILED DESCRIPTION
[0020] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0021] See also Figure 1 . The structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change in the proportional relationship, or adjustment of the size, without affecting the effects and purposes that can be achieved by the present invention, should still fall within the scope of the technical content disclosed by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. Changes or adjustments in their relative relationships should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.
[0022] like Figure 1 As shown, a trolley anchor mechanism includes a propulsion beam 1 and a rock drill 5. The propulsion beam 1 can be installed on the mechanical arm of the engineering trolley. Two connecting seats 11 and 12 below the propulsion beam 1 are connected to the mechanical arm. The propulsion beam 1 can move forward and backward through the connecting seats. The front end of the propulsion beam 1 is provided with a top plate 10 extending forward. The top plate 10 is used to press against the working surface to prevent tilting or shaking in the drilling or anchoring.
[0023] An anchor rod bin 2 for storing drill rods or anchor rods is provided on one side of the propulsion beam 1, and a sliding guide rail 6 is provided on the propulsion beam 1 along the front-rear direction; a clamp device, a grabbing rod device 8 and a rod loading device 9 are also provided on the propulsion beam 1, and the rod loading device 9 transfers the drill rod or anchor rod in the anchor rod bin 2 to the clamp device, and the grabbing rod device 8 grabs the drill rod on the clamp device through a gripper; the rock drill 5 is slidably connected to the sliding guide rail 6, and the rock drill 5 includes a first sliding base 53, a power device 53, a drill tail 54 and a connecting sleeve 55, The power device 53 drives the drill tail 54 to rotate, and the drill tail 54 is threadedly matched with one end of the connecting sleeve 55, and the other end of the connecting sleeve 55 is threadedly matched with the drill rod or the anchor rod; the caliper device limits the radial or axial movement of the drill rod or the anchor rod by gripping, and includes a drill clamp 3 and a drill support 4 arranged in sequence from front to back, the drill clamp 3 can clamp the drill rod or the anchor rod to fix it, and the drill support 4 is slidably connected to the sliding guide rail 6, and the drill support 4 moves relative to the sliding guide rail 6 through the first telescopic mechanism 7.
[0024] like Figure 4 As shown, the drill rod includes a front end and a rear end, the front end is provided with a first external thread 56, the rear end is provided with a second external thread 56, the second external thread 56 cooperates with the connecting sleeve 55, the rear end is axially provided with an inner hole, the inner hole is provided with an internal thread 58, and the drill rod is connected to the head and tail of multiple identical units through the thread cooperation of the first external thread 56 and the internal thread 58. During deep hole operation, the front end of the first drill rod is connected to the drill bit. After the first drill rod is drilled into the hole, the drill holder 3 clamps the rear end of the drill rod, the rock drill 5 retreats, and the second drill rod is connected. Repeat this step to perform deep hole drilling. When withdrawing the drill rods, they are disassembled one by one. The deep hole anchor rod is carried out according to the principle of this step. During construction, the second external thread 56 is coated with lubricating oil or grease to facilitate the separation of the connecting sleeve 55 from the rear end of the drill rod or anchor rod.
[0025] like Figure 2 As shown, the anchor bar bin 2 includes a protective cover 21, a motor 25, a front rod storage disc 22 and a rear rod storage disc 23, a central shaft 24 is connected between the front rod storage disc 22 and the rear rod storage disc 23, a groove 26 for accommodating a drill rod or an anchor rod is provided on the circumference of the front rod storage disc 22 and the rear rod storage disc 23, and a plurality of guide wheels 27 are provided on the circumference of the front rod storage disc 22 and the rear rod storage disc 23, and the guide wheel 27 is located on one side of the groove 26. It is used to press the anchor rod and the drill rod. It is also conducive to the smooth removal of the drill rod and avoids the wear of the drill rod.
[0026] The motor 25 drives the front rod storage tray 22 and the rear rod storage tray 23 to swing. During the rotation of the motor 25, the rod loading device 9 takes out the drill rods in the anchor rod bin 2 one by one. The rear rod storage tray 23 and the rear baffle can move forward and backward on the central axis 24 to adapt to drill rods of different lengths or anchor rod sizes.
[0027] The rod grabbing device 8 includes a first base 81, a first swing arm 82 and a first gripper 83. The first base 81 is fixed to the upper edge of the protective cover 21. The rod grabbing device 8 grabs the drill rod on the clamp device through the first gripper 83. The rod loading device 9 includes a second base 91, a second swing arm 92 and a second gripper 3. The second base 91 is fixed to the propulsion beam 1 and is located between the sliding guide rail 6 and the anchor bar bin 2. The drill rod or anchor rod is transferred between the clamp device and the anchor bar bin 2 through the second gripper 3. The swinging trajectory of the second swing arm 92 intersects with the drill rod or anchor rod in the anchor bar bin 2 at the drill rod or anchor rod installation position on the clamp device. The second gripper 3 grabs the drill rod or anchor rod to realize the action of grabbing and putting it down.
[0028] like Figure 3 As shown, the drill clamp 3 includes a first clamping claw 31 and a second clamping claw 32 which are arranged opposite to each other. The first clamping claw 31 and the second clamping claw 32 are hinged on the propulsion beam 1. The first clamping claw 31 and the second clamping claw 32 are opened and closed by the second telescopic mechanism 33. The second telescopic mechanism 33 and the first telescopic mechanism 7 are both driven by hydraulic pressure. The drill clamp can play a role of supporting the drill when drilling or anchoring is in progress to prevent the drilling from deviating from the track; when the connecting sleeve 55 is separated from the drill rod or anchor rod, the drill rod or anchor rod can be clamped to fix it.
[0029] The drill support 4 includes a second sliding base, a movable pulley, a V-shaped clamp and a traction rope. The bottom of the second sliding base matches the sliding guide rail 6. The rear end of the second sliding base is fixedly connected to the first telescopic mechanism 7. The V-shaped clamp and the movable pulley are fixed on the second sliding base. One end of the traction rope is fixed to the rear end of the propulsion beam 1, and the other end passes around the movable pulley and is fixedly connected to the first sliding base of the rock drill 5. During drilling or bolting operations, the drill support 4 moves synchronously with the rock drill 5. The speed of the rock drill 5 is twice that of the drill support 4. When the drill support 4 moves to the front end of the sliding guide rail 6, the rock drill 5 also moves to the front end of the sliding guide rail 6.
[0030] In order to make the pole grabbing process more stable, two pole grabbing devices 8 are provided at the front and rear, and two pole mounting devices 9 are provided at the front and rear.
[0031] Rock drilling operations:
[0032] Drill rod extension: Drill rods are loaded into the anchor rod compartment 2, and lubricating oil or grease is injected into the inner hole at the rear end of each drill rod. The anchor rod mechanism is moved to the working surface using a mechanical arm and the top plate 10 is used to press against the working surface. The rock drill 5 rotates forward and pushes the drill rod to start drilling; after the drilling of the first drill rod is completed, the drill clamp 3 clamps the drill rod, the rock drill 5 reverses and retreats, the connecting sleeve 55 withdraws from the drill rod, and the rock drill 5 moves to the rear end of the sliding guide rail 6; the anchor bar magazine 2 rotates to an appropriate angle, and the second drill rod is caught by the rod loading device 9; the rod loading device 9 clamps the drill rod and swings the drill rod to the clamp device, that is, in front of the rock drill 5, and grasps the drill rod; the drill tail 54 of the rock drill 5 rotates forward and the connecting sleeve 55 is screwed into the drill rod; the rock drill 5 rotates forward and installs the front end of the second drill rod into the inner hole at the rear end of the first drill rod, and the first external thread 56 of the second drill rod cooperates with the internal thread 58 of the first drill rod; the rod loading device 9 swings back to the bottom of the anchor bar magazine 2, and the drill clamp 3 releases the drill rod; the rock drill 5 rotates forward and starts drilling, and this process is repeated until the drilling depth is reached.
[0033] Drill rod disassembly: After the rock drilling is completed, the rock drill 5 rotates forward and retreats to bring the drill rod to the position of the anchor bar bin 2; the drill clamp 3 clamps the front drill rod; the rock drill 5 reverses and retreats to drive the rear drill rod to withdraw from the front drill rod; the rod loading device 9 swings to the front of the rock drill 5 and grasps the rear drill rod; the rock drill 5 reverses and withdraws the drill rod; the rod loading device 9 swings the rear drill rod to the anchor bar bin 2 and then releases the drill rod; the anchor bar bin 2 rotates to move the drill rod from the rod loading device to the rod loading bin groove 26; the rock drill 5 rotates forward and loads the front drill rod; the drill clamp 3 releases the front drill rod; the rock drill 5 rotates forward and retreats to bring the front drill rod to the position of the anchor bar bin 2; the cycle is repeated until all the drill rods are removed.
[0034] Anchor bolting operations;
[0035] Drilling anchor holes: Anchors are loaded into the anchor bin 2, and the mechanism is moved to the working surface using a mechanical arm and the top plate 10 is used to press the working surface tightly. The rock drill 5 rotates forward to push the drill rod to start the rock drilling operation and drill the anchor holes. After the rock drilling is completed, the rock drill 5 rotates forward and retreats to the tail of the propulsion beam. The rod grabbing device 8 swings to the front of the rock drill 5 to grab the drill rod. The drill clamp 3 clamps the drill rod. The rock drill 5 reverses and then withdraws the drill rod. The drill clamp 3 releases the drill rod. The rod grabbing device grabs the drill rod to the top of the anchor bin 2.
[0036] Anchor bolt installation: The anchor bolt bin 2 rotates to load the anchor bolt into the bolt loader; the bolt loader grasps the anchor bolt and swings the anchor bolt to the front of the rock drill 5, the drill clamp 3 is tightened, and the rock drill 5 moves forward to load the anchor bolt; the drill clamp 3 is released, the bolt loader releases the anchor bolt and retreats to the anchor bolt bin 2; the rock drill 5 continues to move forward to push the anchor bolt into the anchor bolt hole; the drill clamp 3 and the drill support 4 both play the role of supporting the drill during the drilling and anchor bolting process; the rock drill 5 retreats to the rear end of the sliding guide 6. Connect the anchor bolt to complete the anchor bolt installation. The bolt grabber swings the drill rod to the front of the rock drill 5; the drill clamp 3 clamps the drill rod; the rock drill 5 rotates forward to load the drill rod; the bolt grabber releases the drill rod and retreats to the top of the anchor bolt bin 2, and the equipment is used for the next work station.
[0037] The anchor bolt operation and rock drilling operation require that a drill rod be installed on the rock drill 5 first, and a drill bit is arranged at the front of the drill rod. This drill rod does not enter the anchor bolt compartment 2. During the anchor bolt operation, the anchor bolt is installed in the anchor bolt compartment 2, and during the deep hole rock drilling operation, the drill rod is installed in the anchor bolt compartment 2. The front end of the drill rod installed in the anchor bolt compartment 2 is a first external thread 56, and there is no drill bit; rock drilling operation and anchor bolt operation are two different operation modes. Rock drilling operation is mostly used in the tunnel excavation stage, and its main function is to drill gunpowder holes and explore holes, and the drilling depth is deep; anchor bolt operation is mostly used in the tunnel support stage, mainly to drill anchor holes on the tunnel wall and then install the anchor bolts, and the drilling depth can be greater than the anchor bolt length.
[0038] The anchor mechanism of the trolley combines the two working modes of anchoring and rock drilling. The grabbing rod device 8 transfers the drill rod from the anchor bar bin 2 to the clamping device, and the clamping device clamps the drill rod and inserts it into the rock drill 5. The rock drill 5 drives the drill rod to perform rock drilling; after the rock drilling is completed, the drill rod is grabbed by the grabbing rod device 8, and the rod installation device 9 replaces the front end of the rock drill 5 with an anchor rod, and then the anchoring operation is performed. Switching between anchoring and rock drilling operations is achieved on the basis of the anchor bar bin 2, the sliding guide rail 6 and the first telescopic mechanism 7, realizing the multifunctionality of the anchor trolley. It saves the time of changing equipment and improves work efficiency.
[0039] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A trolley anchor mechanism, comprising a propulsion beam and a rock drill, characterized in that: An anchor rod bin for storing drill rods or anchor rods is provided on one side of the push beam, and a sliding guide rail is provided on the push beam along the front-to-back direction; a clamp device, a grabbing rod device and a rod loading device are also provided on the push beam, the rod loading device transfers the drill rod or anchor rod in the anchor rod bin to the clamp device, and the grabbing rod device grabs the drill rod on the clamp device through a gripper; the rock drill is slidably connected to the sliding guide rail, the rock drill comprises a first sliding base, a power device, a drill tail and a connecting sleeve, the power device drives the drill tail to rotate, the drill tail is threadedly matched with one end of the connecting sleeve, and the other end of the connecting sleeve is matched with the drill rod or anchor rod; the clamp device limits the radial or axial movement of the drill rod or anchor rod by gripping, and comprises a drill clamp and a drill supporter arranged in sequence from front to back, the drill clamp can clamp the drill rod or anchor rod to fix it, the drill supporter is slidably connected to the sliding guide rail, and the drill supporter moves relative to the sliding guide rail through a first telescopic mechanism; The anchor rod bin comprises a protective cover, a motor, a front rod storage disc and a rear rod storage disc, a central shaft is connected between the front rod storage disc and the rear rod storage disc, grooves for accommodating drill rods or anchor rods are arranged on the circumference of the front rod storage disc and the rear rod storage disc, and the motor drives the front rod storage disc and the rear rod storage disc to swing; The rod grabbing device comprises a first base, a first swing arm and a first gripper, wherein the first base is fixed to the upper edge of the protective cover, and the rod grabbing device grabs the drill rod on the clamp device through the first gripper; the rod loading device comprises a second base, a second swing arm and a second gripper, wherein the second base is fixed to the propulsion beam and is located between the sliding guide rail and the anchor rod bin, and the drill rod or anchor rod is transferred between the clamp device and the anchor rod bin through the second gripper; The brazing device comprises a first clamping claw and a second clamping claw which are arranged opposite to each other, the first clamping claw and the second clamping claw are hinged on the propulsion beam, and the first clamping claw and the second clamping claw are opened and closed by a second telescopic mechanism; The drill support device includes a second sliding base, a movable pulley, a V-shaped clamp and a traction rope. The bottom of the second sliding base cooperates with the sliding guide rail, the rear end of the second sliding base is fixedly connected to the first telescopic mechanism, the V-shaped clamp and the movable pulley are fixed on the second sliding base, one end of the traction rope is fixed to the rear end of the propulsion beam, and the other end passes around the movable pulley and is fixedly connected to the first sliding base of the rock drill.
2. The trolley anchor mechanism according to claim 1, characterized in that: The drill rod includes a front end and a rear end, the front end is provided with a first external thread, the rear end is provided with a second external thread, the second external thread cooperates with the connecting sleeve, the rear end is axially provided with an inner hole, the inner hole is provided with an internal thread, and the drill rod is connected end to end with multiple identical units through the thread cooperation of the first external thread and the internal thread.
3. The trolley anchor mechanism according to claim 1, characterized in that: The described rod grabbing devices are provided with two at the front and rear, and the described rod mounting devices are provided with two at the front and rear.
4. The trolley anchor mechanism according to claim 1, characterized in that: The front rod storage disc and the rear rod storage disc are provided with a plurality of guide wheels in the circumferential direction, and the guide wheels are located at one side of the groove.
5. The trolley anchor mechanism according to claim 1, characterized in that: The front end of the propulsion beam is provided with a top plate extending forward.
6. The trolley anchor mechanism according to claim 1, characterized in that: The second telescopic mechanism and the first telescopic mechanism are both driven by hydraulic pressure.
