Assembled shear wall group and manufacturing method thereof
By using the annular connection of the connecting ribs and the connecting sleeves in the shear wall group and the direct connection of the connecting plates and reinforcements in the shear wall group, the problem of low connection reliability is solved and higher earthquake resistance is achieved.
Patent Information
- Application Number
- CN201810398673.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-04-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2038-04-28
AI Technical Summary
The shear wall connection reliability in existing prefabricated concrete buildings is low and weak during seismic resistance, which cannot meet the design requirements of strong nodes and weak components.
The prefabricated shear wall group consisting of connecting ribs, connecting plates and multiple shear walls is adopted. The annular connection between the shear wall is realized by connecting the ribs and the annular connection part of the connecting sleeve and the direct connection plate and the reinforcement. The dual connection structure improves connection reliability.
It improves the connection reliability between shear walls and meets earthquake resistance requirements, ensuring that even if one connection method fails, the other method can still maintain reliable connection and improves overall earthquake resistance.
Smart Images

Figure CN110409652B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building structures, and in particular to an assembled shear wall group and a manufacturing method thereof. Background Art
[0002] At present, with the rapid development of my country's economy, the government's increasing requirements for energy conservation, emission reduction and environmental protection, and the rapid rise in labor prices, the construction industry is undergoing profound changes and will inevitably move from extensive to intensive, and gradually embark on the road of sustainable development of the modernization of the construction industry. As the core technology system of new building industrialization, prefabricated concrete structure is conducive to improving production efficiency, saving energy, developing green and environmentally friendly buildings, and improving and ensuring the quality of construction projects. Due to the structural characteristics of prefabricated concrete buildings, most of their components are industrially prefabricated, so the connection method between components has become a core issue restricting the development of prefabricated concrete building structures. At present, metal plates are mostly embedded in shear walls, and the connection between two adjacent shear walls is achieved by bolts or welding. However, if the shear walls are connected only by the aforementioned metal plates, the connection reliability is low, and the areas where these connection positions are located are also the weak points of the shear wall group in the earthquake resistance process, which does not meet the earthquake resistance design requirements of "strong nodes, weak components". Summary of the invention
[0003] The present application provides an assembled shear wall group and a manufacturing method thereof to solve the problem that the current shear wall group has a poor earthquake resistance.
[0004] The first aspect of the present application provides an assembled shear wall group, which includes connecting dowels, connecting plates and a plurality of shear walls, wherein:
[0005] The shear wall comprises a wall body, a reinforcement member and a connecting sleeve, wherein a part of the reinforcement member is buried in the wall body, and a part of the reinforcement member is arranged at one end of the shear wall along its own length direction and exposed outside the wall; the connecting sleeve is connected to the reinforcement member, and the connecting sleeve has an annular connecting portion exposed outside the wall, and the annular connecting portion is located at one end in the length direction;
[0006] Among the multiple shear walls, the annular connecting portion of two adjacent shear walls arranged along the length direction has the connecting dowel inserted therein; and the connecting plate is fixedly connected to the exposed portion of the reinforcement members of the two shear walls to connect the two shear walls.
[0007] Preferably, the connecting sleeve is a steel cable, both ends of which are fixedly connected to the reinforcement member and buried in the wall;
[0008] Gap grouting is arranged between two adjacent shear walls.
[0009] Preferably, the wall has a connecting groove, the connecting groove is concavely arranged along the length direction, and the connecting groove extends along the height direction of the shear wall;
[0010] A portion of the connecting sleeve is arranged in the connecting groove; and the gap is filled in the connecting groove by grouting.
[0011] Preferably, a sealing strip is further provided at the gap between two adjacent shear walls, and the sealing strip is sealed and connected to the two shear walls to seal the connection groove.
[0012] Preferably, the joint grouting comprises expansive cement.
[0013] Preferably, the reinforcement is a channel steel, which includes a waist and two legs connected to each other, the two legs are arranged opposite to each other along the length direction, the connecting sleeve is connected to the legs, at least a portion of the waist is exposed outside the wall and is fixedly connected to the connecting plate.
[0014] Preferably, the reinforcement includes a prefabricated connecting plate and an I-beam, the I-beam includes a waist and two legs connected to each other, and the two legs are arranged opposite to each other along the length direction; the connecting sleeve is connected to the legs, the prefabricated connecting plate is connected to the legs, and the connecting plate is connected to the prefabricated connecting plate.
[0015] Preferably, the connecting plate is provided with an anti-fracture notch, and the anti-fracture notch is located at the gap between two adjacent shear walls.
[0016] Preferably, a plurality of the connecting sleeves are provided in a single shear wall, and the plurality of connecting sleeves are provided on the wall body along the height direction of the shear wall;
[0017] There are multiple connecting plates, and the reinforcement of a single shear wall has multiple parts that are spaced apart along the height direction and exposed outside the wall. The multiple connecting plates are fixedly connected to the reinforcement.
[0018] A second aspect of the present application provides a method for manufacturing an assembled shear wall group, which is used to manufacture the assembled shear wall group provided by any of the above items, comprising the following steps:
[0019] S1. forming a shear wall, wherein the shear wall comprises a wall body, a reinforcement member and a connecting sleeve, wherein the connecting sleeve and the reinforcement member are both arranged to be partially exposed outside the wall;
[0020] S2, allowing the connecting dowel bars to penetrate into the annular connecting portions of the adjacent shear walls arranged along the length direction;
[0021] S3. Connect the connecting plate and the reinforcement.
[0022] The technical solution provided by this application can achieve the following beneficial effects:
[0023] In the prefabricated shear wall group provided in the present application, adjacent shear walls are connected by two connection structures at the same time. The first is to directly connect the reinforcement in the shear wall by a connecting plate; the second is to connect the connecting sleeve in the shear wall by connecting dowels. Therefore, even if a certain connection method fails between adjacent shear walls, the existence of another connection method can ensure that the adjacent shear walls can continue to maintain a reliable connection relationship, thereby improving the connection reliability between the shear walls and meeting the earthquake resistance requirements.
[0024] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 A front view of a portion of the structure of the assembled shear wall group provided in an embodiment of the present application;
[0026] Figure 2 A top view of a portion of the structure of the assembled shear wall group provided in an embodiment of the present application;
[0027] Figure 3 A top view of another part of the structure of the assembled shear wall group provided in the embodiment of the present application;
[0028] Figure 4 A schematic diagram of a partial structure of a shear wall provided in an embodiment of the present application;
[0029] Figure 5 A schematic diagram of a structure of a reinforcement member in a shear wall provided in an embodiment of the present application;
[0030] Figure 6 A schematic diagram of the structure of a connecting plate in a prefabricated shear wall group provided in an embodiment of the present application;
[0031] Figure 7 A flow chart of a method for manufacturing a prefabricated shear wall group provided in an embodiment of the present application.
[0032] Reference numerals:
[0033] 1-Connect the dowel bars;
[0034] 2-Connection plate;
[0035] 21-Anti-fracture notch;
[0036] 3- Shear wall;
[0037] 31- wall;
[0038] 311-connection slot;
[0039] 32- reinforcement;
[0040] 320-Prefabricated connecting plate
[0041] 321-waist;
[0042] 322-legs;
[0043] 323-connection hole;
[0044] 33-connecting sleeve;
[0045] 331- annular connecting portion;
[0046] 4-Grouting of gaps;
[0047] 5-Sealing strip.
[0048] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION
[0049] The present application is further described in detail below through specific embodiments and in conjunction with the accompanying drawings.
[0050] like Figure 1-3 As shown, the embodiment of the present application provides an assembled shear wall group, which includes connecting dowels 1, connecting plates 2 and multiple shear walls 3. Among the multiple shear walls 3, two adjacent shear walls 3 arranged along their own length direction are connected by connecting dowels 1 and connecting plates 2 at the same time, thereby improving the seismic resistance of the entire assembled shear wall group. Specifically, as Figure 4As shown, the shear wall 3 includes a wall body 31, a reinforcement member 32 and a connecting sleeve 33. The wall body 31 can be formed by pouring concrete mortar. Its shape and size can be determined according to actual needs. The type of concrete can be freely selected to meet different working conditions. The reinforcement member 32 can be a steel section or other structures such as a steel bar group. In order to improve the structural reliability of the entire shear wall 3, the reinforcement member 32 is formed of a metal material to produce a greater strength improvement effect. The connecting sleeve 33 can be an annular structure or other structures. It can be connected to the reinforcement member 32 to form an annular connecting portion 331 for connecting to the connecting dowel 1 in the assembled shear wall group. The connecting plate 2 can be a metal plate structure or a structure of other shapes formed by other hard materials. During the manufacturing process of the wall 31, the connecting sleeve 33 and the reinforcement 32 can be connected together in advance, and then the reinforcement 32 and the connecting sleeve 33 are fixed at the set position by anchors, and finally the wall 31 is cast and formed, so that the reinforcement 32 and the connecting sleeve 33 can be integrally formed in the wall 31, thereby improving the structural strength of the entire shear wall 3 and the consistency of the entire shear wall 3. In order to facilitate the connection between adjacent shear walls 3, in the process of burying the reinforcement 32 and the connecting sleeve 33, a part of the reinforcement 32 can be buried in the wall 31, and the other part of the reinforcement 32 can be exposed outside the wall 31, and the part exposed outside the wall 31 can be located at one end of the wall 31 along its own length direction; a part of the connecting sleeve 33 is connected to the reinforcement 32 and buried in the wall 31, and the other part of the connecting sleeve 33 can be exposed outside the wall 31, and the part exposed outside the wall 31 can have an annular connecting portion 331 to connect with the connecting dowel 1. More specifically, a separate connecting sleeve 33 can have an annular connecting portion 331, or, after the connecting sleeve 33 is connected to the reinforcement 32, an annular connecting portion 331 is formed between a part of the connecting sleeve 33 and the wall 31 or the reinforcement 32. In order to facilitate the connection For the two shear walls 3 arranged along the aforementioned length direction, the annular connecting portion 331 can be set at one end of the wall 31 along the aforementioned length direction; in the process of connecting the shear walls 3, the connecting dowel 1 can pass through the annular connecting portion 331 of each of the two shear walls 3, and then, the connecting dowel 1 and the annular connecting portion 331, that is, the connecting sleeve 33, can be fixedly connected by bending or bundling; at the same time, when both the reinforcement 32 and the connecting plate 2 are metal structures, the same connecting plate 2 can be welded to connect the exposed parts of the reinforcement 32 of each of the two adjacent shear walls 3 together, and when at least one of the reinforcement 32 and the connecting plate 2 is not a metal structure, threaded connection or riveting can be used to achieve the connection of the three, so that the two adjacent shear walls 3 can be connected by two connection methods at the same time.It should be noted that, in order to facilitate the connection between the connecting plate 2 and the portion of the reinforcement 32 exposed outside the wall 31 , an opening or a long groove may be formed on the wall 31 corresponding to the exposed portion of the reinforcement 32 .
[0051] As can be seen from the above, in the prefabricated shear wall group provided in the present application, adjacent shear walls 3 are connected by two connection structures at the same time. The first is to directly connect the reinforcement 32 in the shear wall 3 through the connecting plate 2; the second is to connect the connecting sleeve 33 in the shear wall 3 through the connecting dowel 1. Therefore, even if a certain connection method fails between adjacent shear walls 3, due to the existence of another connection method, it can be ensured that the adjacent shear walls 3 can continue to maintain a reliable connection relationship, thereby improving the connection reliability between the shear walls 3 and meeting the earthquake resistance requirements.
[0052] Furthermore, the connecting sleeve 33 can be a steel cable, and both ends of the connecting sleeve 33 can be simultaneously fixedly connected to the reinforcement 32 by anchoring, and the connecting portion between the connecting sleeve 33 and the reinforcement 32 is buried in the wall 31, which reduces the difficulty and workload of assembling the connecting sleeve 33 and the reinforcement 32. At the same time, the material of steel cable is easy to purchase and inexpensive. In order to further improve the connection reliability between two adjacent shear walls 3 along the length direction, a gap grouting 4 can also be arranged between the two adjacent shear walls 3. The gap grouting 4 can also be formed by pouring concrete mortar. In a preferred specific embodiment, the gap grouting 4 can include expansive cement to improve the bonding performance of the connection interface between the new and old concrete through the expansive cement.
[0053] Furthermore, in order to further improve the connection strength between adjacent shear walls 3 and reduce the gap size between adjacent shear walls 3, preferably, as Figure 2 and Figure 3 As shown, during the casting process of the wall 31, a connecting groove 311 can be formed on the wall 31. Specifically, the connecting groove 311 can be recessed along the aforementioned length direction on the wall 31, and in order to accommodate multiple connecting sleeves 33, the connecting groove 311 can be extended along the height direction of the shear wall 3, so that when two adjacent shear walls 3 are connected, a connecting groove group can be formed between the two, and the portion of the connecting sleeve 33 exposed outside the wall 31 can be accommodated in the aforementioned connecting groove group, and the design of the connecting groove 311 is also convenient for the connecting dowel 1 to penetrate into the annular connecting portion 331 of multiple connecting sleeves 33; at the same time, the setting of the connecting groove 311 is also conducive to the formation of the gap grouting 4, thereby preventing the concrete mortar from overflowing during the pouring process. Specifically, along the aforementioned length direction, the cross-sectional shape of the connecting groove 311 can be a flared U-shape. Of course, the cross-sectional shape of the connecting groove 311 can also be other suitable shapes
[0054] Furthermore, a sealing strip 5 may be provided at the gap between two adjacent shear walls 3. The sealing strip 5 may be a strip made of PU (polyurethane material), so as to further seal the connection gap between the two shear walls 3, thereby further improving the structural consistency of the assembled shear wall group; more specifically, the sealing strip 5 and the shear wall 3 may be sealed and connected by silicone sealant, so as to ensure the connection reliability between the sealing strip 5 and the shear wall 3 while further improving the connection reliability between adjacent shear walls 3.
[0055] Optionally, the reinforcement member 32 may be a channel steel, so as to facilitate the connection between each part of the shear wall 3 and the connecting dowel 1 and the connecting plate 2. The channel steel includes a waist portion 321 and two legs 322 connected to each other, and the two legs 322 are opposite to each other along the aforementioned length direction, such as Figure 5 As shown, the leg 322 of the reinforcement 32 may be provided with a connection hole 323, and the steel cable may be anchored on the reinforcement 32 through the connection hole 323, which may further improve the connection reliability between the connection sleeve 33 and the reinforcement 32; in order to facilitate the connection between the connection plate 2 and the reinforcement 32, a part of the waist 321 of the reinforcement 32 may be exposed outside the wall 31, so that the connection plate 2 may be connected to the parts of the two adjacent shear walls 3 exposed outside the wall 31. The reinforcement 32 is made of channel steel, which can not only ensure the structural strength of the wall 31, but also facilitate the connection of the connection plate 2, and can also improve the connection strength between the connection sleeve 33.
[0056] Optionally, the reinforcement 32 in the prefabricated shear wall group provided in the present application may include a prefabricated connecting plate 320 and an I-beam. The prefabricated connecting plate 320 may be a metal plate-like structure. The I-beam includes a waist 321 and two legs 322 connected to each other. The two legs 322 are opposite to each other along the aforementioned length direction. Similarly, a connecting hole 323 may be pre-processed on the leg 322 of the reinforcement 32, and then the two ends of the steel cable may be anchored in the connecting hole 323 of the reinforcement 32 to form an annular connecting portion 331; accordingly, since the reinforcement 32 includes an I-beam, before casting the formed wall 31, the prefabricated connecting plate 320 and the two legs 322 of the reinforcement 32 may be fixedly connected together in advance by welding, and the prefabricated connecting plate 320 may be exposed outside the wall 31, so that the two adjacent shear walls 3 are connected together by means of the connection between the prefabricated connecting plate 320 and the connecting plate 2. When the reinforcement member 32 is made of I-steel, the structural strength of each part of the entire wall 31 can be further improved; at the same time, it is convenient for the connection between the connecting sleeve 33 and the connecting plate 2 and the wall 31 respectively.
[0057] In order to prevent the adjacent assembled shear wall groups from breaking the connecting plates 2 after being subjected to shear force, optionally, as Figure 1 and Figure 6As shown, the connection plate 2 may be provided with an anti-fracture notch 21, so that even if the adjacent shear wall 3 is subjected to the shear force, the connection plate 2 can absorb the aforementioned shear force by bending and deforming itself, thereby preventing the connection failure between the adjacent shear walls 3 caused by the direct fracture of the connection plate 2. Specifically, in the process of forming the connection plate 2, the anti-fracture notch 21 may be directly formed at the middle position of the connection plate 2, and one or more anti-fracture notches 21 may be provided, and the shape of the anti-fracture notch 21 may be regular shapes such as circular, arc or square, as well as other irregular shapes; the anti-fracture notches 21 may also be formed on both sides of the connection plate 2, which may also improve the anti-fracture ability of the entire connection plate 2.
[0058] Furthermore, a single shear wall 3 may be provided with a plurality of connecting sleeves 33, and the plurality of connecting sleeves 33 may be arranged on the wall body 31 along the height direction of the shear wall 3. Accordingly, a plurality of connecting holes 323 may be opened on the reinforcement 32 so as to be connected with a plurality of steel cables. During the assembly process of the prefabricated shear wall group, the connection reliability between the two shear walls 3 may be further improved through the connection between the plurality of connecting sleeves 33 and the connecting dowels 1.
[0059] More preferably, multiple connecting plates 2 can also be provided, and the reinforcement 32 in a single shear wall 3 can be specifically multiple parts that are arranged at intervals along the height direction of the wall 31 and exposed outside the wall 31, so that multiple parts of the reinforcement 32 exposed outside the wall 31 can be respectively connected to multiple connecting plates 2, thereby further improving the structural stability of the entire prefabricated shear wall group.
[0060] The present application also provides a manufacturing method, by which the assembled shear wall group provided in any of the above embodiments is manufactured, and the manufacturing method comprises the following steps:
[0061] S1. A shear wall 3 is formed, and the shear wall 3 includes a wall body 31, a reinforcement member 32 and a connecting sleeve 33. Parts of the reinforcement member 32 and the connecting sleeve 33 are placed outside the wall body 31 to facilitate connection with the connecting plate 2 and the connecting dowel 1 respectively; specifically, the reinforcement member 32 and the connecting sleeve 33 can both be metal structures, and the connecting sleeve 33 can be fixed together with the reinforcement member 32 in advance, and then the reinforcement member 32 and the connecting sleeve 33 are fixed to a certain position by anchors, and finally the wall body 31 can be cast and formed, thereby forming an integrated wall body 31, reinforcement member 32 and connecting sleeve 33.
[0062] S2. Arrange multiple shear walls 3 along the aforementioned length direction, and then insert the connecting dowel bars 1 into the annular connecting parts 331 of each adjacent shear wall 3, so as to connect two adjacent shear walls 3 together; specifically, the connecting dowel bars 1 can be steel bars of set sizes or other hard rod-like structures.
[0063] S3. Connect the connecting plate 2 and the reinforcement 32. When both the reinforcement 32 and the connecting plate 2 are metal structures, welding can be used to connect the same connecting plate 2 to the reinforcements 32 of the adjacent shear walls 3. When one of the reinforcement 32 and the connecting plate 2 is made of non-metallic material, through holes can be opened on the connecting plate 2 and the reinforcement 32 respectively, so as to achieve the connection between the connecting plate 2 and the two reinforcements 32 with the help of threaded connectors or rivets.
[0064] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. An assembled shear wall group, characterized in that: It includes connecting dowels, connecting plates and multiple shear walls, among which: The shear wall comprises a wall body, a reinforcement member and a connecting sleeve, wherein a part of the reinforcement member is buried in the wall body, and a part of the reinforcement member is arranged at one end of the shear wall along its own length direction and exposed outside the wall; the connecting sleeve is connected to the reinforcement member, and the connecting sleeve has an annular connecting portion exposed outside the wall, and the annular connecting portion is located at one end in the length direction; Among the plurality of shear walls, the annular connecting parts of two adjacent shear walls arranged along the length direction are provided with the connecting dowels; and the connecting plate is fixedly connected to the exposed parts of the reinforcements of the two shear walls to connect the two shear walls; Wherein, the reinforcement is a channel steel, the channel steel comprises a waist portion and two legs connected to each other, the two legs are arranged opposite to each other along the length direction, the connecting sleeve is connected to the legs, at least a part of the waist portion is exposed outside the wall, and is fixedly connected to the connecting plate; Both ends of the connecting sleeve are fixedly connected to the reinforcing member and are buried in the wall.
2. The assembled shear wall assembly according to claim 1, characterized in that: The connecting sleeve is a steel cable; Gap grouting is arranged between two adjacent shear walls.
3. The assembled shear wall assembly according to claim 2, characterized in that: The wall body has a connecting groove, the connecting groove is concavely arranged along the length direction, and the connecting groove extends along the height direction of the shear wall; A portion of the connecting sleeve is disposed in the connecting groove; The gap grouting is filled in the connecting groove.
4. The assembled shear wall assembly according to claim 3, characterized in that: A sealing strip is also provided at the gap between two adjacent shear walls, and the sealing strip is sealed and connected to the two shear walls to block the connection groove.
5. The assembled shear wall assembly according to claim 2, characterized in that: The joint grouting includes expansive cement.
6. The assembled shear wall assembly according to claim 1, characterized in that: The reinforcement comprises a prefabricated connecting plate and an I-beam, wherein the I-beam comprises a waist portion and two legs connected to each other, and the two legs are arranged opposite to each other along the length direction; the connecting sleeve is connected to the legs, the prefabricated connecting plate is connected to the legs, and the connecting plate is connected to the prefabricated connecting plate.
7. The assembled shear wall assembly according to claim 1, characterized in that: The connecting plate is provided with an anti-fracture notch, and the anti-fracture notch is located at the gap between two adjacent shear walls.
8. The assembled shear wall assembly according to claim 1, characterized in that: A plurality of the connecting sleeves are arranged in a single shear wall, and the plurality of the connecting sleeves are arranged on the wall body along the height direction of the shear wall; There are multiple connecting plates, and the reinforcement of a single shear wall has multiple parts that are spaced apart along the height direction and exposed outside the wall. The multiple connecting plates are fixedly connected to the reinforcement.
9. A method for manufacturing an assembled shear wall assembly, used for manufacturing the assembled shear wall assembly according to any one of claims 1 to 8, characterized in that: The steps include: S1. forming a shear wall, wherein the shear wall comprises a wall body, a reinforcement member and a connecting sleeve, wherein the connecting sleeve and the reinforcement member are both arranged to be partially exposed outside the wall; S2, allowing the connecting dowel bars to penetrate into the annular connecting portions of the adjacent shear walls arranged along the length direction; S3. Connect the connecting plate and the reinforcement.
Citation Information
Patent Citations
Assembly-type linear mixed coupled wall and construction method thereof
CN104032863A
Assembly type concrete filled steel tube shear wall splitting and assembling connection structure and assembling connection method
CN104727467A
Prefabricated type wall connecting structure and prefabricated type house building adopting connecting structure
CN105952024A
Take power consumption assembled combination steel sheet shear force wall of attenuator
CN206941865U
Vertical piece steel sheet connecting device of assembled precast shear wall
CN207228401U